CELINE POWER INTERNATIONAL S.L.
Plug & Save: Connect it and Save. It is that simple to convert sunlight into electricity, with the first worldwide mobile solar sys-tem with integrated energy storage from Sun Invention.Electricity flows directly from the solar panel into your socket and can reduce the electricity bill by approximately 25 per cent. You simply plug the outgoing power cable of the system into a socket. Several panels can be connected in between each other. In addition, the integrated energy storage ensures that electricity produced during the day is available at night. Whether you are a tenant or an owner – you will always find a sunny place for the panels in the garden, on the terrace or the roof, on the façade or on the balcony. The corresponding moun-ting accessories are part of the complete system, with three years guarantee.
Dimensions:808mm x 1580mm x 60mm (W x H x D), double wall aluminium frame
Solar Panel:Pmax 195 WVoc 45,52 Vlsc 5,58 AVmpp 37,44 Vlmpp 5,21 A
Inverter:V-DC mpp 24-40 VV-OC 50 Vl-DC max 10,4 AV-AC nom 184-264 Vf-AC nom 47-51 HzP-AC nom 235 Wl-AC nom 1,07 AEfficiency 95,2%
Energy Storage:Lithium-Ion batteries Block 8 batteries with BMS8 x 3,2 V/15 AhCharge 430 WhDischarge 250 Wh
Manufacturer warranty:Complete system: 3 yearsSolar panel: 10 yearsInverter: 10 yearsPerformancewarranty80%Pmax(panel):25years
Dimensions:808mm x 1580mm x 60mm (W x H x D), double wall aluminium frame
Panel:Pmax 195 WVoc 45,52 Vlsc 5,58 AVmpp 37,44 Vlmpp 5,21 A
Inverter (only included in Light version):V-DC mpp 24-40 VV-OC 50 Vl-DC max 10,4 AV-AC nom 184-264 Vf-AC nom 47-51 HzP-AC nom 235 Wl-AC nom 1,07 AEfficiency 95,2%
Manufacturer warranty:Complete system: 3 yearsSolar panel: 10 yearsInverter: 10 years (only included in light version)Performancewarranty80%Pmax(panel):25years
Model Optimus (PS195mS1.3),with integrated energy storage:
Model Light (PS195oS1.3) & Basic (PS195BASIC), without energy storage:
EN 50438 - ENEL - UL1741 - CQCVDE0126-1-1 - IEEE1547 - AS4777EN 62109 - IEC 62109-1/-2 - SEMKO
Protection class IP65
CELINE POWER INTERNATIONAL S.L.
Plaza Sierra Castilla 3303177 San Fulgencio-Spain
www.celine-photovoltaic-power.com [email protected]
TRI-KA Messung 1 Messung Start:21.08.2012 10:50:01
Temperatur =
Bestrahlung =
ISC STC =ISC Roh =
IMPP STC =IMPP Roh =
UOC Roh =UOC STC =
UMPP Roh =UMPP STC =
P Roh =P STC =
FF Roh =FF STC =
Messung Ende:21.08.2012 10:50:13
720 W/m²
20 °
32,3 °C
Neigung =
5,87 A
5,09 A
44,66 V
36,44 V
185,5 W
0,71
4,225 A
3,666 A
42,58 V
34,35 V
125,9 W
0,70
Kunde: Balkon Modul / Anlage: Anlage 1 / Wechselrichter: Wechselrichter 1 / String: String 1
gemessen
gemessen
gemessen
ISC NOM = 5,58 A
5,24 AIMPP NOM =
UOC NOM = 45,4 V
UMPP NOM = 37,2 V
P NOM = 195 W
FF NOM = 0,77
21.08.2012 11:07
TRI-KA Messung 1 Messung Start:21.08.2012 10:53:02
Temperatur =
Bestrahlung =
ISC STC =ISC Roh =
IMPP STC =IMPP Roh =
UOC Roh =UOC STC =
UMPP Roh =UMPP STC =
P Roh =P STC =
FF Roh =FF STC =
Messung Ende:21.08.2012 10:53:16
790 W/m²
66 °
29,4 °C
Neigung =
5,37 A
4,95 A
42,91 V
34,57 V
171,1 W
0,74
4,239 A
3,909 A
41,59 V
33,25 V
130 W
0,74
Kunde: Balkon Modul / Anlage: Anlage 1 / Wechselrichter: Wechselrichter 1 / String: String 2 70°
gemessen
gemessen
gemessen
ISC NOM = 5,58 A
5,24 AIMPP NOM =
UOC NOM = 45,4 V
UMPP NOM = 37,2 V
P NOM = 195 W
FF NOM = 0,77
21.08.2012 11:09
Performance curve Model Optimus, Light as well as Basic at 20º inclination
Performance curve Model Optimus, Light as well as Basic at 70º inclination
TRI-KA Measuring
TRI-KA Measuring 1
Measured =temperature
Measured =radiation
Measured =inclination
Measured =temperature
Measured =radiation
Measured =inclination
Start measuring: 21.08.2012 10:50:01
Start measuring: 21.08.2012 10:53:02
End measuring: 21.08.2012 10:50:13
End measuring: 21.08.2012 10:53:16
Client: Balcony module / Installation: Installation 1 / Inverter: Inverter 1 / String: String 1
Client: Balcony module / Installation: Installation 1 / Inverter: Inverter 1 / String: String 2 70°
Cur
rent
[A]
Cur
rent
[A]
Pow
er [W
]P
ower
[W]
Voltage [V]
Voltage [V]
Available at:
CELINE POWER INTERNATIONAL S.L.
Plaza Sierra Castilla 3303177 San Fulgencio-Spain
www.celine-photovoltaic-power.com [email protected]