United States Steel Corp.
• Plant opened in 1882 as the North Chicago Railway Mill Company.
• Location on Lake Michigan favored transportation of raw materials and goods.
• 20,000 people employed
• Based on market forces affecting the industry the plant finally closed in 1992
![Page 3: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/3.jpg)
![Page 4: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/4.jpg)
![Page 5: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/5.jpg)
A UNIQUE
LOCATIONDOWNTOWN CHICAGO
CHICAGO LAKESIDE
10 MILES
• An extraordinary site in the
city
• A remarkable waterfront
• 369 acres
THE SITE
![Page 6: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/6.jpg)
ADJACENT TO
CHICAGO’S
SOUTH SIDE
NEIGHBORHOOD
Sto
ny
Isla
nd
Av
e.
95th Street
71st Street
79th Street
83rd Street.
87th Street
![Page 7: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/7.jpg)
SCALE COMPARISONCHICAGO LOOP CHICAGO LAKESIDE
![Page 8: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/8.jpg)
• $98M TIF Grant for
Infrastructure of 1st Phase
• ¾ of land made of slag
(byproduct of steel
production)
• Re-alingment of US route
41 (aka Lake Shore Drive)
![Page 9: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/9.jpg)
SLAG 40 ft
2000 ft
Remnants of the site:
Slag varies from 10-40 ft, with 25 ft being the average depth of slag and
runs from the original shoreline into the lake by approximately 2000 ft.
Slag: by-product of steel making
SITE CHALLENGES
![Page 10: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/10.jpg)
Environment
Remediation• In 2004, a large project
commenced to provide topsoil for
the lakefront park using dried mud
from the bottom of Lake Peoria in
downstate IL.
• Backwater sedimentation was big
issue in the Peoria Lakes, a
dredging program eligible for
federal funding was difficult.
• DPD was previously awarded $5M
for work at the SW site, $1.4M of
that amount was used to transport
105,000 tons of wet Peoria Lakes
sediment into the SW site.
![Page 11: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/11.jpg)
CHICAGO
LAKESIDE
MASTER PLAN
High
School
• 460 total acres
• 91 acres – lakefront park
dedicated to Chicago Park District
• 369 acres – Chicago Lakeside
• 35 acres – open space within the
development
![Page 12: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/12.jpg)
Chicago Lakeside• 13,375 market rate + affordable housing
• 50, 000 new residents
• 17.5M Sq. Ft. of retail
• New High School
• 1,500 slip-marina
• Est. TCP $ 4 billion
![Page 13: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/13.jpg)
A SUSTAINABLE PLANA Model of sustainable redevelopment on the land of a former steel mill
• Create diverse communities
• Establish compact neighborhoods
• Connect to public transit
• Extend the City street grid
• Establish a vibrant mix of uses
• Establish a network of public
open spaces
![Page 14: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/14.jpg)
REALIGNMENT
OF US 41
• Create an urban
landscaped boulevard
• Allow for the integration
of neighborhoods on both
sides of US 41
• Incorporate bike lanes
• Align with existing Avenue O
US 41
Re-alignment
Existing
Alignment
87th St
Station
93rd St
Station
79th St
Station
83rd St
Station
![Page 15: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/15.jpg)
SW
REALIGNMENT OF US 41 SOUTHWEST VIEW
![Page 16: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/16.jpg)
CONNECT TO PUBLIC
TRANSIT
EXISTING BUS
PROPOSED BUS
EXISTING BIKE PATH
PROPOSED BIKE PATH
METRA RAIL LINE
87th St
Station
93rd St
Station
79th St
Station
83rd St
Station
![Page 17: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/17.jpg)
87th St
Station
93rd St
Station
79th St
Station
83rd St
Station
METRA
• 30% of proposed residents are
within 10 minute walk
(1/2 mile) of existing METRA
Stations
COMMUTER RAIL
![Page 18: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/18.jpg)
BUS SERVICE
Bus Lines
• The entire community is
within a 5-minute walk to a
bus line
87th St
Station
93rd St
Station
79th St
Station
83rd St
Station
Proposed
Bus
Existing Bus
![Page 19: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/19.jpg)
BIKEWAYS
• 6.5 miles of new bike paths
• Connects and extends the city
bicycle system
• Cycle storage at rail stations
87th St
Station
93rd St
Station
83rd St
Station
Existing
Bikeways
Proposed
Bikeways
79th St
Station
![Page 20: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/20.jpg)
COMPLETE THE
LAKEFRONT
PARK SYSTEM
• A new lakefront park
dedicated to the Chicago Park
District
• 1.7 miles of additional
lakefront access
• 91 acres of lakefront park
![Page 21: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/21.jpg)
3. ACHIEVE AN EXTENSIVE
NEIGHBORHOOD PARK SYSTEM
![Page 22: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/22.jpg)
ACHIEVE AN
EXTENSIVE
NEIGHBORHOOD
PARK SYSTEM
• All residents will live within a 3-minute walk to a park
• 35 acres of open space within the development
High
School
Site
87th St
Station
93rd St
Station
83rd St
Station
79th St
Station
![Page 23: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/23.jpg)
EXISTING ORE WALLS
![Page 24: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/24.jpg)
ORE WALL PARK
![Page 25: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/25.jpg)
CENTRAL PARK
Potential Uses
• Gardens
• Jogging/Walking Path
• Plaza
• Playgrounds
• Sculptures
• Passive Recreation
Ce
ntr
al P
ark
![Page 26: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/26.jpg)
FINGER PARKS
POSSIBLE USES:
• Biofiltration Gardens
• Jogging/Walking Path
• Lake Overlook
• Natural Areas
![Page 27: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/27.jpg)
4. EXTEND THE SOUTHSIDE BLOCK PATTERN
![Page 28: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/28.jpg)
EXTEND THE
SOUTHSIDE
BLOCK PATTERN
• Extension of existing city
streets connects the adjacent
neighborhoods to the lake
• Neighborhood parks create
view corridors to the lake
• Diagonal street establishes a
view corridor to downtown
![Page 29: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/29.jpg)
5. INCORPORATE A VIBRANT MIX OF USES
![Page 30: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/30.jpg)
INCORPORATE
A VIBRANT MIX
OF USES
• Regional retail
• Neighborhood retail
• Diverse housing options
• Office
• Hospitality
• Entertainment
• Recreation
• Education
MARKETCOMMON
CENTRAL PARK
LAKEFRONT
THE SLIP
US 41
ORE WALL
![Page 31: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/31.jpg)
6. INTEGRATE INNOVATIVE
STORMWATER STRATEGIES
![Page 32: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/32.jpg)
INTEGRATE
INNOVATIVE
STORMWATER
STRATEGIES
Remove Solo
• A high percentage of stormwater will be returned to Lake Michigan
![Page 33: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/33.jpg)
A NEW
GENERATION OF
CHICAGO
NEIGHBORHOODS
Chicago Lakeside is organized around six
distinct areas
• Market Common
• US 41
• Lakefront
• Central Park
• The North Slip
• Ore Wall
Market
Common
Central
Park
The Slip
Ore Wall
Lakefront
US 41
DISTINCT NEW NEIGHBORHOODS
![Page 34: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/34.jpg)
MARKET
COMMON
• Retail and Entertainment
Destinations
• Variety of Housing Options
• Lakefront Access
• Community Gathering
LAKE
MICHIGAN
E. 81st STREET
E. 83rd STREET
S.
BR
AN
DO
N A
VE
.
S.
BU
FF
ALO
AV
E.
S.
GR
EE
N B
AY
AV
E.
E. 79th STREET
83rd ST. STATION
![Page 35: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/35.jpg)
US 41 CORRIDOR
• Full range of uses
• Variety of Housing Options
• Includes Sullivan School and
new high school
High School
Site
E. 87TH ST
E. 81ST ST
E. 85TH ST
US
41
S.
GR
EE
N B
AY
AV
E.
E. 89TH ST
Sullivan School
87th St
Station
83rd St
Station
![Page 36: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/36.jpg)
LAKEFRONT
NEIGHBORHOOD
• Residential neighborhood
• Lakefront access
• Ideal for higher densities
• Views to downtown Chicago
LAKE
MICHIGAN
E. 81ST ST
E. 82ND ST
US
41
![Page 37: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/37.jpg)
CENTRAL PARK
NEIGHBORHOOD
• Residential neighborhood
• Organized along a centrally
located linear park
LAKE
MICHIGAN
E. 82ND Street
E. 84TH Place
S. A
ve
nu
e N
US
41
E. 81ST Street
CE
NT
RA
L
P
AR
K
![Page 38: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/38.jpg)
THE NORTH SLIP
NEIGHBORHOOD
• Full range of uses
• Unique waterfront along the
North Slip
• Boat access and docking is
envisionedNORTH SLIP
LAKE
MICHIGAN
E. 86TH Street
E. 84TH Street
US
41
![Page 39: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/39.jpg)
ORE WALL
NEIGHBORHOOD
• Mixed use neighborhood
• Ore wall park forms
northern edge of the
neighborhood
US
41
E. 86TH Street
![Page 40: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/40.jpg)
BUILT OVER TIMEA vision for 2055 and beyond
2015
![Page 41: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/41.jpg)
2055
![Page 42: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/42.jpg)
![Page 43: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/43.jpg)
The velodrome and cycle-shop at 8615 S. Burley
![Page 44: Chicago lakeside developent lm 032414](https://reader036.vdocuments.net/reader036/viewer/2022070303/548e8bf2b47959ac748b4606/html5/thumbnails/44.jpg)
• Existing 166 mts. Wooden
Velodrome
• New Chicago Velo Campus
• 250 Mt. Indoor track
• 400 M.t outdoor running
track
• Outdoor mountain biking
facility