Download - CNH Reman Rolling Out PLM
![Page 1: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/1.jpg)
CNH Reman Rolling Out PLM
Aras Implementation – It’s Here
![Page 2: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/2.jpg)
Syllabus
How do you roll out PLM to gain visibility and status into the pipeline processes for parts in a remanufacturing environment? What CNH Reman needed was a standardized process with a central online dashboard that spanned the enterprise and enabled better capacity planning and throughput for greater coordination, productivity and customer service. Find out deployment lessons learned that provided real user requirements, better user input and greater user adoption.
2
![Page 3: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/3.jpg)
Who Is CNH Reman
CNH Reman is a joint venture between CNH Global N.V. and Springfield Remanufacturing Corporation. The partnership brings together CNH Parts & Service product experience, technical information, access to equipment, and dedicated dealer networks with SRC Remanufacturing operations, capabilities, and expertise.
3
![Page 4: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/4.jpg)
Who Is PSC Group?
• PSC Group is a business technology consulting firm that has been delivering high value solutions to our clients since 1990. As an Aras Certified Partner, PSC has currently built two custom PLM solutions on the Aras Innovator® framework:
• Formula & Recipe Management – targeted for food, beverage and nutraceuticals with a need to manage raw materials, packaging, and finished goods along with their related attributes, processes, and specifications.
• Pipeline Management for Remanufacturing – targeted for large machinery parts remanufacturing companies with a need for standard processes and product development visibility.
4
![Page 5: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/5.jpg)
Phased Approach
• Discovery Workshop• Pain Points, Business Challenges, Business Priorities• Cast Vision
• Requirements (High-Level)• Capture All• Must Have, Strong Need, Nice to Have• Prioritize and Confirm
• Data• Formats, Sources and Latency
• Development• Iterative• Mix Small Deliverables with Foundational Features
5
Engineering Central(Team Center)
PICK
SecondaryMS Access
GenesisMS Access (2gb)
ePart Updated Weekly
X
On-Line Catalogs
EAREngineering
Action Request
Impact
CNH Reman Network Servers
Folders
![Page 6: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/6.jpg)
Item Types
• Feasibility Studies• EARs (Engineering Action Requests)
• RFQs• Projects
6
![Page 7: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/7.jpg)
Standards
• Workflows• eMail Notifications• Project Tasks• InBasket Activities
7
![Page 8: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/8.jpg)
Reports
• Pipeline Management• Pipeline Summary Analysis• Open Pipeline Parts Analysis• Feasibility• Pipeline Project Parts• Others
8
![Page 9: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/9.jpg)
Phased Approach (cont)
• Testing• Alpha, Beta and Production• End-to-End Walk Thru• Test Again
• Go-Live• Everybody Using the System• Leave Old Practices Behind
• Expand and Extend for the Future• Burn In• User Directed• Integrations• Quality Management• Certifications and Skills
9
![Page 10: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/10.jpg)
Critical Success Factors
• Executive Buy-In• Communication and Direction to the Team• Participation and Involvement• Deliverable
• Grass Roots Evangelism• Early Adopters
• Flexibility• Recognize Simple Changes• Formalize Major Changes• Business as Well
• Resource Availability• Requirements Review• Testing
102011-Feb-03
![Page 11: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/11.jpg)
Critical Success Factors (cont)
• Fully Functional Environment• Infrastructure Licensing• Ability to Configure Infrastructure (Reporting, Email, etc.)• IT Desktop & Browser Configuration
• PLM is Never Complete• Continuous Process Improvement• Apply Structure Across the Enterprise
11
![Page 12: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/12.jpg)
Lessons Learned
• Executive Involvement• Early and Often
• Reports, Reports, and more Reports• Everybody Using the System• Need to Control Windows Updates
12
![Page 13: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/13.jpg)
What We Had Before
13
Engineering Central(Team Center)
PICK
SecondaryMS Access
GenesisMS Access (2gb)
ePart Updated Weekly
X
On-Line Catalogs
EAREngineering
Action Request
Impact
CNH Reman Network Servers
Folders
![Page 14: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/14.jpg)
What We Have Now
14
![Page 15: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/15.jpg)
15
![Page 16: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/16.jpg)
16
![Page 17: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/17.jpg)
17
![Page 18: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/18.jpg)
18
![Page 19: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/19.jpg)
19
![Page 20: CNH Reman Rolling Out PLM](https://reader035.vdocuments.net/reader035/viewer/2022062511/54be1b9c4a79594e048b4730/html5/thumbnails/20.jpg)