INECO DNACOMPREHENSIVE SERVICE OFFER
KEY PROJECTS
2% of our
TURNOVER
we collaborate with
universities technological centres
AUTOMATISATION of engineering PROCESSES
NEW METHODS and approaches to SUSTAINABILITY
PREDICTIVEMAINTENANCE & MANAGEMENTIMPROVEMENT TOOLS
advanced concepts in
MODELLING and organisation of
MOBILITY
TECHNOLOGICAL VANGUARD in infraestructureENGINEERING
to INNOVATIONmore than
spainhigh speed network
3,100 km in service20 years of experienceWorld leader in ERTMS deployment350 km/h speed
airport network modernisation and reorganisation of airspace
>20 years of collaboration with the airport authorities
>1,900,000 operationsClose to 700 million tonnes of cargoSACTA updates in 5 centers and 48 control towers
european commissionertms deployment
Deployment in more than 65,000 km of European rail network9 priority corridors6 year termHorizon 2030
united kingdomhs2 high speed
Participation in Phase 1 and Phase 2531 km of tracks400 million journeys in 2020Be Inspired Award 2013
turkeyistambul – Ankara high speed
250 km/h speed3h journey50,000 passengers dailyConsultancy and works supervision
uaeorat at abu dhabi airport
New terminal for 30 millon passengersx2 current volume of passenger traffic700,000 m² surfaceCapacity for 19,000 suitcases/hour
kuwaitproject management of the international airport expansion
New terminal with more than 700,000 m2 of built surface3 runways for 4F class flightsTwo control towers5 km of tunnel under the runways for air cargo management
perulima airport extension
Airport surface extension from 3 to 7 millon m2
New passenger terminal in 2016Second runway of 3,500 metres23 millon passengers in 2023
brazilcptm lines in são paulo
6 metro lines25 minutes average duration journey3 minute intervalsStandard gauge
saudi arabiamakkah-madinah high speed
166,000 passengers daily444 km320 km/h speed<3 hours of journey
mexicoroads: concessions and signalling
148 km10,000 vehicles daily28% heavy transportExtension to 4 lanes
construction supervision of the new international airport in ciudad de mexico
6 runways of triple simultaneous operation>170 operations / hour1 multi-level terminal of 743,000 m2
2 satellite buildings
Line 12 of ciudad de Mexico metroLine of 4 km3 new stationsManagement, coordination and control of the extension projectsWill relieve congestion of metro lines 1, 2 & 3
ecuadornational strategic mobility and transport plan
Analysis of more than 800 km of road4 international traffic ports and 20 fishing ports25 airportsDuration of the plan: 2012-2037
Consultancy and planningStrategic planning
Preliminary studies and reportsFormulation of legal regulation
Structuring, financing and concessionsPreliminary design
PROJECT MANAGEMENT >
>>
>>
>>>>>> PROJECT MANAGEM
ENT
>>
>>
>>
>>>>>>
Drawing up projectsFunctional / conceptual design
Detailed design / construction projectProject supervision
WorksSupervision & monitoringHealth & safety coordinationEnvironmental managementWorks management
CommissioningOperation testsOperational readinessLaunch of fully operating serviceTraining
Operation and maintenanceSafety inspectionsSupervision and monitoringPre maintenance
Procurement consulting
horizon2 0 2 0
participation in European programmes:
framework
programme7th
we dedicate
THE WHOLE LIFECYCLE
OF THE PROJECT
ENGINEERING AND CONSULTANCY FOR INFRASTRUCTURE AND TRANSPORT
engineering and consultancy around the world
MARKETSSOLUTIONS
www.ineco.com
TRANSPORT PLANNING AIRPORTS RAILWAYS
ROADS URBAN TRANSPORT PORTS
ENVIRONMENT ARCHITECTUREICT
!
AIR NAVIGATION
more than
6,000projects
more than
45yearsof experience
more than
50countries
R+D
WASTE MANAGEMENT
PROJECTS
ERTMS
ROLLING STOCK
MAINTENANCE
CONSULTANCY WORKS
ORAT
OPERATION
PROJECT MANAGEMENT
SMART PRODUCTSPLANNING
AND WATER MANAGEMENT
around
2,500professionals
in the last 10 years