Contractor Assurance System:Integrated Assessment Schedule &
Action Tracking System
PPA Department Heads Meeting21 July 2011
Leslie StepanekOffice of Planning & Assessment
![Page 2: Contractor Assurance System: Integrated Assessment](https://reader030.vdocuments.net/reader030/viewer/2022012017/615b8d872531ec4c4b1d5219/html5/thumbnails/2.jpg)
Agenda
• Contractor Assurance System (CAS)– Why assess?– The Contract – CAS Model– Assessments and Issues Management
• Online tools
• What we need from you
• Questions
Page 2
![Page 3: Contractor Assurance System: Integrated Assessment](https://reader030.vdocuments.net/reader030/viewer/2022012017/615b8d872531ec4c4b1d5219/html5/thumbnails/3.jpg)
Why Assess Performance?
• Understand and mitigate risk to mission• Identify opportunities for continuous
improvement, such as– Improve efficiency– Improve customer satisfaction
• Good business…and it shows we are good stewards of tax payer dollars
• Compliance to the DOE contract
Page 3
![Page 4: Contractor Assurance System: Integrated Assessment](https://reader030.vdocuments.net/reader030/viewer/2022012017/615b8d872531ec4c4b1d5219/html5/thumbnails/4.jpg)
What the contract says…
• The CAS shall include…rigorous, risk-based, credible self-assessments, and feedback and improvement activities, including utilization of nationally recognized experts, and other independent reviews to assess and improve the Contractor’s work process and to carry out independent risk and vulnerability studies.
• CAS review scheduled for January 2012
Page 4
![Page 5: Contractor Assurance System: Integrated Assessment](https://reader030.vdocuments.net/reader030/viewer/2022012017/615b8d872531ec4c4b1d5219/html5/thumbnails/5.jpg)
Page 5
The CAS Model
![Page 6: Contractor Assurance System: Integrated Assessment](https://reader030.vdocuments.net/reader030/viewer/2022012017/615b8d872531ec4c4b1d5219/html5/thumbnails/6.jpg)
CATS
OLD AS
SMART
Assessments
Self & External Operational Awareness
Assessment Schedule (IAS)
B.P. Findings OFI
Issues Management Program
Action Tracking System
Page 6
Assessment & Issues Management Model
![Page 7: Contractor Assurance System: Integrated Assessment](https://reader030.vdocuments.net/reader030/viewer/2022012017/615b8d872531ec4c4b1d5219/html5/thumbnails/7.jpg)
Page 7
The CAS Model
![Page 8: Contractor Assurance System: Integrated Assessment](https://reader030.vdocuments.net/reader030/viewer/2022012017/615b8d872531ec4c4b1d5219/html5/thumbnails/8.jpg)
Integrated Assessment Schedule
Page 8
![Page 9: Contractor Assurance System: Integrated Assessment](https://reader030.vdocuments.net/reader030/viewer/2022012017/615b8d872531ec4c4b1d5219/html5/thumbnails/9.jpg)
Action Tracking System
• Enhanced online tool– Requires action owners to accept or reject an
action assigned to them– Ability to add multiple actions to a single issue– Ability to add attachments or links– Enhanced user interface to provide a better end
user experience • Pull down menus
– User-friendly reporting capability
Page 9
![Page 10: Contractor Assurance System: Integrated Assessment](https://reader030.vdocuments.net/reader030/viewer/2022012017/615b8d872531ec4c4b1d5219/html5/thumbnails/10.jpg)
Action Tracking System Beta Testers• AD
– O’Donnell, Dabney, Scharfenstein, D. Newman
– Benwell, Jobe, Metcalfe, Burkhart, Cutino, Seabury
• LCLS– Arthur, W.E. White, Tompkins
• PS– Gaffney, Bogan, D. Reis
• PPA– Wisniewski, Lynch, Tice,
Racine
• SSRL– Knotts, Rabedeau, Pianetta,
Hedman, B. Johnson• OPS
– Facilities Division Dept Heads
– HR: Topper, Shupert– OCFO: Zscherpel,
Dardzinski– OCIO: Melen, Ringgold – ESH Division Dept Heads
• ESH Coordinators• ESH Sub-Council
Rollout: user acceptance testing 7/11-7/22; release 8/15
Page 10
![Page 11: Contractor Assurance System: Integrated Assessment](https://reader030.vdocuments.net/reader030/viewer/2022012017/615b8d872531ec4c4b1d5219/html5/thumbnails/11.jpg)
Implementation Plan
Q3FY11•Customer meetings to socialize MAP & IMP
•Finalize MAP & IMP for lab-wide review
•Complete beta testing of ATS
Q4FY11•Publish MAP & IMP
•Develop training overview for Mission-support assessment leads
•Release & transition to ATS & IAS
•Communicate with sr management
Q1FY12•Full quarter of ‘run time’ for new IAS online form and issues management
•Collect & disposition feedback
•CAS Peer Review dry run
Q2FY12•CAS Peer Review•Analyze review results
•Develop actions, as necessary
Q3FY12•Implement actions to close CAS issues
•Consider case-study based training for Mission-support assessment leads
Page 11
![Page 12: Contractor Assurance System: Integrated Assessment](https://reader030.vdocuments.net/reader030/viewer/2022012017/615b8d872531ec4c4b1d5219/html5/thumbnails/12.jpg)
What we need from you…
• Know that a CAS peer review will occur in Jan ’12
• Harvey Lynch, your PPA representative, will be reviewing the IAS FY12-14 proposed assessments for accuracy and completeness
Page 12
![Page 13: Contractor Assurance System: Integrated Assessment](https://reader030.vdocuments.net/reader030/viewer/2022012017/615b8d872531ec4c4b1d5219/html5/thumbnails/13.jpg)
Questions?