TITLEYENG TONG'S SCOPE OF
WORKSYEAR CLIENT MAIN CONTRACTOR
PJ099Reclamation of Jurong Island Phase 4 & Tuas View Extension - Option 1-1
Shore Protection Works at New Yard Phase 2
Sept 2011~Feb 2012
JTC CorporationSamsung C & T Corporation
PJ098
Design and Reclamation at Ayer
Merbau - Phase 1 Part 2, Jurong Island - Sub Contract for Removal of Existing Revetment and Construction of New Shore Protection
Revetment & Shore Protection Works
Jul 2011~Jun 2012
JTC CorporationSamsung C & T Corporation
PJ097Project D2004-00903-120-Dredging Works at CNB Ship Basin
Dredging WorksJul 2011~ Dec 2011
Defence Science and Technologh Agency
Yeng Tong Construction Pte Ltd
PJ095
Proposed Pier on Lot 07442X PT
(New Lot 8609WPT) MK05 To The Existing Workshop At No. 15 Pandan Crescent On Lot 04904K MK 05 (Clementi Planing Area)
Dredging, Piling & RC WorksJun 2011~ Feb 2012
Tiong Woon Crane & Transport Pte Ltd
Yeng Tong Construction Pte Ltd
PJ094
Reclamation of Jurong Island PH4 & Tuas View Extension Sandkey Dredging For New Yard Phase 2 V/O
Dredging WorksMay 2011~ Aug 2011
JTC CorporationHyundai Engineering & Construction Co. Ltd
PJ093Revelopment of Sungei Buloh Wetland Reserve (Phase 1)
Improved the tidal gates D6;
Restoration of existing sluice gate A3; Toe-protection and rstoration of the mangrove; Constructon of an offshore breakwater.
Apr 2011~ Apr 2012
National Parks BoardSurbana International
Consultants Pte Ltd
PJ092
Reclamation Of Jurong Island Phase 4 and Tuas View Extension Option 1-1 - Rock Works Below Finger Pier
Rocks WorksSep 2010~ Feb 2011
JTC CorporationHyundai Engineering & Construction Co. Ltd
CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD
Page 1 of 34
TITLEYENG TONG'S SCOPE OF
WORKSYEAR CLIENT MAIN CONTRACTOR
CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD
PJ090Dredging Works at P01 to P09, P21 to P26 and PSA defined area at Pasit Panjang Terminal
Dredging WorksMar 2010 ~ Sept 2010
PSA Corporation Ltd.Yeng Tong Construction Pte Ltd
PJ088
Dredging works for proposed additiona and alterations to an existing jetty at an existing workshop at No. 72, Loyang Way
Dredging WorksFeb 2010 ~ May 2010
Technics Offshore Engineering Pte. Ltd.
Oung Construction Pte. Ltd.
PJ087
Reclamation Of Jurong Island Phase 4 and Tuas View Extension Option 2-1 - Shore Protection At Area 3B5b and Area 4A
Shore Protection WorksDec 2009 ~ Oct 2010
JTC Corporation PKDBH Joint Venture
PJ086Dredging Works At Jetty of Senoko Power Station
Dredging WorksApr 2009 ~ Aug 2009
Senoko PowerFederal Resource Services Pte Ltd
PJ084
Upgrading of Berths K12, K13 & K14 At Keppel Terminal And Dredging Works
Dredging WorksNov 2008 ~ Oct 2009
PSA Corporation Limited
Muhibbah Engineering (S'pore) Pte Ltd
PJ077Additional Reclamation at Pulau
Ayer Merbau
Stone Supply & Shore
Protetion Works
Oct 2008 ~
Feb 2009JTC Corporation
Hyundai Engineering and Construction
Limited
PJ082 Supply & Delivery of Sea Sand Supply & Delivery of Sea Sand Apr 2008 ~ Jan 2010
JTC CorporationYeng Tong Construction Pte Ltd
PJ081
Reclamation for Pasir Panjang Terminal Phases 3 and 4 Contract No. 30/06.C08
Stone Supply Oct 2008 ~ Jun 2012
Maritime and Port Authority of Singapore
Hyundai Engineering and Construction Limited
Page 2 of 34
TITLEYENG TONG'S SCOPE OF
WORKSYEAR CLIENT MAIN CONTRACTOR
CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD
PJ080Removal of Rock from the Seabed at Selat Sengkir at Sentosa
Dredging WorksJun 2008 ~ Jul 2009
McConnell Dowell South East Asia Pte Ltd
Yeng Tong Construction Pte Ltd
PJ079Proposed Dredging work at Berth 4
& Seawater Intake at PCS
Dredging & Sand Capping
Works
Jul 2008 ~
Aug 2008
HSL Constructor Pte
Ltd
Yeng Tong Construction
Pte Ltd
PJ078Reclamation of Jurong Island PH 4 & Tuas View Extension
Sub-Contract for Shore Protection Works in Area A2-Megayard Phase 1 & Part of 2
Apr 2008 ~ Dec 2008
JTC Corporation
Hyundai Engineering & Construction Co. Ltd - Van Oord ACZ - Ballast Nedam JV
PJ077Reclamation of Pulau Ayer Merbau, Jurong Island Phase 1
Removal of Existing Shore Protection
Jan 2008 ~ Feb 2008
JTC CorporationHyundai Engineering & Construction Co. Ltd
PJ076Supply & Delivery of Sea Sand to
Singapore for JTC Corporation (JTC)Stevedoring
Oct 2007 ~
May 2010JTC Corporation
Various Sea Sand
Suppliers
PJ075
Dredging at Changi Creek Leading to / from Changi Point Ferry Terminal
Dredging WorksSep 2007 ~ Feb 2008
Maritime and Port Authority of Singapore
Yeng Tong Construction Pte Ltd
PJ074
Sub-Contract for Removal of Underground Obstruction at Marina Bay
Wet Excavation WorksAug 2007 ~ Aug 2008
Urban Redevelopment Authority
Gammon Construction Limited Singapore Branch
PJ073
Proposed Addition & Alteration and Repair Works to Existing Jetty on Lot 07309W MK05 at No. 13 Pandan Crescent
Repairs Jetty & Dredging Works
Aug 2007 ~ Jul 2008
Tiong Woon Crane & Transport Pte Ltd
Yeng Tong Construction Pte Ltd
PJ072Construction of Wharf and Ringer Foundation at PPL Shipyard, 27 Tuas Crescent
Wharf and ringer foundationMay 2007 ~ Sep 2007
PPL Shipyard Pte LtdYeng Tong Construction Pte Ltd
Page 3 of 34
TITLEYENG TONG'S SCOPE OF
WORKSYEAR CLIENT MAIN CONTRACTOR
CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD
-
Proposed Widening of the Existing Penang Bridge Low Level viaduct from East Abutment to Pier 24E and from Pier 24W to Pier 69W - Optim3B (Marine)
Bored pile and pile cap worksFeb 2007 ~ Mar 2009
Penang Bridge Sdn Bhd
UEM Construction Sdn Bhd & Biaxis Sdn Bhd
-
Shuaibah Phase III IWPP Desalination Plant (Civil Offshore Works)
Shoreline Protection and Offshore Works
Oct 2006 ~ Nov 2007
Shuaibah Water and Electricity Company
Zelan Construction
Arabia Co. Ltd & Pembinaan Yeng Tong Sdn Bhd JV
Reclamation of Sakra Basin, Construction of Roads, Drains, Sewers and ancillary works off Sakra Road, Jurong Island
Shore protection works and Dredging
Aug 2006 ~ Jun 2007
Jurong Town Corporation
Hyundai Engineering and Construction Limited
PJ071
Beach Protection Works at Siloso Beach, Sentosa
Sandy Beach & Headland Construction
Feb 2006 ~ Oct 2006
Sentosa Development Corporation
Yeng Tong Construction Pte Ltd
PJ070
Reclamation at Pulau Ubin and Pulau Tekong (Part I)
Subcontract for Sandy Beach Construction at Area A "D-A / D-B"
Jun 2005 ~ May 2006
Housing Development Board, Singapore
Van Oord Dredging And Marine Contractors B.V.
-
Cadangan Pembinaan Pelabuhan
Tanjung Pelepas Fasa 3 - The
Construction, completion and
Maintenance of Wharves Structures
at Berth 9 & 10
Dredging and Arnour Rock Protection
May 2005 ~ May 2006
Tanjung Pelepas Port Authority, Johor
Zelan Construction Sdn Bhd & Omni-Kwang JV
-
Dredging and Armour Rock Works to C.W Outfall and C.W Intake for Power Plant at Tanjung Bin, Johor
Dredging and Arnour Rock Protection
Mar 2005 ~ Jun 2005
Tanjung Bin Power Plant Sdn Bhd
Zelan Construction Sdn Bhd & Omni-Kwang JV
Page 4 of 34
TITLEYENG TONG'S SCOPE OF
WORKSYEAR CLIENT MAIN CONTRACTOR
CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD
PJ069
Maintenance Dredging Works at Pasir Panjang Terminal, Area A, B & C
Dredging at -15.0 and -16.0 MCD and Rock Rectification Works
Nov 2004 ~ Jul 2006
PSA Corporation Limited
Yeng Tong Construction Pte Ltd
PJ069
Maintenance Dredging at Pasir
Panjang Terminal Area D
Dredging at -15.0 MCD Nov 2004 ~
Jul 2005
PSA Corporation Ltd Yeng Tong Construction
Pte Ltd
PJ069
Maintenance Dredging at Sembawang Wharves
Dredging at -11.00 MCD Nov 2004 ~ Jan 2005
PSA Corporation Ltd Yeng Tong Construction Pte Ltd
PJ068
Dredging Works at Pasir Panjang Wharves
Dredging Works Nov 2003 ~ Dec 2003
PSA Corporation Ltd Yeng Tong Construction Pte Ltd
Seabed Preparation Pipeline Installation and Rock Armour Protection Works in Indonesian Waters
Reinstating Seabed and Filling Trench over Gas Pipeline
Jun 2003 ~ Aug 2003
PT. Perusahaan Gas Negara
Boskalis-Idors J.O.
PJ066
PGN Offshore Pipeline Project at Kuala Tunkal, Sumatra & Batam Island in Indonesia
Placing Rock on Gas Pipeline in Seabed
Jun 2003 ~ Jul 2003
PT. Perusahaan Gas Negara
Hyundai Heavy Industries Co. Ltd
PJ063
Powergas / PMG Submarine Gas Pipeline Project at Pulau Sakra
Reinstatement of Revetment Apr 2003 ~ Jun 2003
Powergas Ltd JDN - Boskalis JV
Dredging at Tanjong Pagar Terminal to Deepen Berth from -12.0m to -13.6m CD
Dredging Works May 2003 ~ Jul 2003
PSA Corporation Limited
Yeng Tong Construction Pte Ltd
Page 5 of 34
TITLEYENG TONG'S SCOPE OF
WORKSYEAR CLIENT MAIN CONTRACTOR
CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD
-
Cadangan Pembangunan Pelabuhan Tanjung Pelepas - Phase II
Rock Revetment Work Oct 2003 ~ Jun 2004
Tanjung Pelepas Port Authority, Johor
Inai Kiara Sdn Bhd
PJ057
Reclamation of Jurong Island Phase
4 & Tuas View Extension - Shore Protection Works
Shore Protection Works 2002 ~ 2005 Jurong Town
Corporation
Hyundai Engineering &
Construction Co. Ltd & Van Oord ACZ Ballast Ham Rock Joint Venture
Removal and Reinstallation Of Revetment At Pulau Sakra Landfall East And West Natuna Pipeline
Removal and Reinstallation of Revetment
Jun 2002 ~ Aug 2002
Powergas Ltd Jan De Nul - Boskalis Joint Venture
Removal of 25 Nos. Mooring Piles From Sentosa Cove Marina at Sentosa
Removing Steel Piles from Seabed
Feb 2002 Sentosa Development Corporation
Yeng Tong Construction Pte Ltd
Proposed Redevelopment of Changi Point Ferry Terminal - Dredging Works
Dredging Works and Breaking underwater Rocks
2001 ~ 2002 Urban Redevelopment Authority
Swee Hong Engineering Construction Pte Ltd
Maintenance Dredging At Tanjong Pagar Terminal, Keppel Terminal,
Pasir Panjang Terminal and Pasir Panjang Wharves
Dredging Works Oct 2001 ~ Jan 2002
PSA Corporation Limited
Yeng Tong Construction Pte Ltd
North Eastern Coast Reclamation Phase 4 Area At Punggol And Coney Island
Trimming Seabed to Profiles Aug 2001 Government of Singapore
Jan De Nul (S) Pte Ltd
Page 6 of 34
TITLEYENG TONG'S SCOPE OF
WORKSYEAR CLIENT MAIN CONTRACTOR
CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD
Reclamation at Changi East - Area 'A' North - Proposed Soil Improvement Works at Asian Aerospace Site - Changi East
Surcharge Removal Works 2001 - 2003 Building Construction Authority of Singapore
Hyundai - Koon - Boskalis Joint Venture
Proposed Additional Changi East Reclamation (Phase 1C) Singapore
Shore Protection Works May - Dec 2001 Government of Singapore
Hyundai - Koon - Boskalis Joint Venture
Reclamation at Pulau Ubin and Pulau Tekong (Part I)
Site Clearence and Removal of Rock Headlands
2001Housing Development Board, Singapore
TOA-JDN (PUT) Joint Venture
J130 - Seraya Project 2 (Civil Works For Non-Revamp Area)
Shore Protection Works For Cooling Water Outfall Station
2001 Ellba Eastern (Shell) Gammon Pte Ltd
Reclamation at Changi East Area "A"
(South) - Surcharge Removal Work in M-1 Area (SPEC/QS/431/98)
Surcharge Remvoal Work 2001 Government of
Singapore
Samsung Corporation
(Engineering & Construction Group)
Proposed Additional Reclamation at Southern Sentosa Cove
Reclamation / Dredging Soil Improvement and Revetment Works
2000 ~ 2001 Sentosa Development Corporation
Yeng Tong Construction Pte Ltd
Redevelopment of Colombo Port Dredging Works 1999 ~ 2001 Government of Sri Lanka
Hyundai Engineering and Construction Limited
Dredging Works at Berth K13-K14 Keppel Terminal
Dredging Works 1999 ~ 2000 Port of Singapore Authority
Yeng Tong Construction Pte Ltd
Proposed Changi East Reclamation (Phase 1C), Singapore
Revetment Construction Works
1997 ~ 1999 Government of Singapore
Hyundai - Koon - Boskalis Joint Venture
Proposed Design & Construction of Off-Shore Islets at Siloso Beach, Sentosa, Singapore
Reclamation / Dredging and Beach Fromation Works
1997 ~ 1998 Sentosa Development Corporation
Sing Lian Huat-Yeng Tong Construction Pte Ltd
Page 7 of 34
TITLEYENG TONG'S SCOPE OF
WORKSYEAR CLIENT MAIN CONTRACTOR
CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD
Construction of Two Breakwaters and Other Facilities at Jerudong Beach, Brunei
Breakwater Construction Works
1997 ~ 1998 Amedeo Development Corporation Sdn Bhd
Hyundai Engineering & Construction Co. Ltd
Construction of Marina Entrance and Revetment Works, Singapore
Construction of Marina / Dredging and Shore Protection Works
1997 ~ 1998 Sentosa Development Corporation
Sing Lian Huat - Yeng Tong Construction Joint Venture
Bridge at Marina Bay Project, Singapore
Revetment Works 1997 Public Works Department
Obayashi Corporation
Construction & Completion of Jetties, Breakwater, Groyne, Dredging, Beach Reclamation and Associated Marine Works at Tanjong Leman & Pulau Sibu Tengah, Mersing, Johor
Construction of Jetties, Breakwater Groyne, Dredging and Reclamation
1996 ~ 1997 Kumpulan Penambang (Johor) Sdn Bhd
Tidalmarine Engineering Sdn Bhd
Proposed Demolition of Existing
Ramp and Construction of Revetment at Tanjong Beach, Sentosa, Singapore
Construction Ramp
Construction and Revetment Works
1995 ~ 1996 Sentosa Development
Corporation
Yeng Tong Construction
Pte Ltd
Modification to Shore Protection Works Adjacent to Ramp at Shell Ferry Terminal, Pasir Panjang, Singapore
Shore ProtectionWorks 1995 Port of Singapore Authority
Uninec Construction Pte Ltd
Construction of Dredging Ditch and
Slope Protection Work at Western Catchment Revervoirs, Singapore
Construction of Concrete
Drains and Slope Protection
1995 ~ 1996 Public Utilities Board Yeng Tong Construction
Pte Ltd
Control of Beach Erosion of Coastline of Berakas Camp Coastline Protection - Brunei Darussalam.
Shore Protection Works 1994 ~ 1995 Government of Singapore
Daito Kogyo Co Ltd
Page 8 of 34
TITLEYENG TONG'S SCOPE OF
WORKSYEAR CLIENT MAIN CONTRACTOR
CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD
Repairs to Existing Sunken Rockbunds and Revetment at Southern Island, Singapore
Repair and Construct New Revetment
1993 ~ 1994 Sentosa Development Corporation
Yeng Tong Construction Pte Ltd
Repairs of Seawall at 30 Bukit Chermin Road, Singapore
Repair Concrete Seawall 1993 Port of Singapore Authority
Yeng Tong Construction Pte Ltd
Reno Matters for Bedok Fifth Subsidiary Drain, Singapore
Construction of Drain 1993 Ministry of Environment
Swee Hong Engineering Construction Pte Ltd
Proposed Revetment for KYC Machine Industry (S) Pte Ltd, Singapore
Revetment Works 1993 KYC Machine Industry (S) Pte Ltd
Yeng Tong Construction Pte Ltd
Proposed Changi East Reclamation (Phase 1A), Singapore
Shore Protection Works 1992 ~ 1996 Government of Singapore
Obayashi - Toyo Joint Venture
Reconstruction of Granite - Block Stone & Drain, Singapore
Rubble Stone Drains 1992 Bukit Timah Turf Club Uninec Construction Pte Ltd
Proposed North Butterworth Container Terminal, Malaysia
Shore Protection Works 1992 Penang Port Commissioner
IJM Corporation Bhd
- Subcontract for Rubble/Revetment Wall
Construction
Rubble / Revetment Wall 1991 P. W. D. Obayashi - Toyo Joint Venture
- Reconstruction of Tanjong Berlayer Seawall, Singapore
Concrete Seawall 1992 ~ 1993 P. W. D. Obayashi - Toyo Joint Venture
Maintenance of Seawall at Raffles Lighthouse, Singapore
Repair of Revetment 1991 ~ 1992 Port of Singapore Authority
Uninec Construction Pte Ltd
Page 9 of 34
TITLEYENG TONG'S SCOPE OF
WORKSYEAR CLIENT MAIN CONTRACTOR
CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD
Proposed Dredging Work at Tiong Woon Jetty, Singapore
Dredging Works 1991 Tiong Woon Crane & Transport Pte Ltd
Yeng Tong Construction Pte Ltd
Proposed Dredging at Selat Samulun, Singapore
Dredging Works 1991 M.O.E. N. C. Senan & Sons Pte Ltd
-
Proposed Johor - Singapore Ferry
Terminal, Singapore
Dredging Works 1991 ~ 1992 J. K. R. Syarikat Sri Shah Sdn
Bhd
Proposed Reconstruction of Outlet Drain at Pioneer Sector, Singapore
Concrete Outfall Drain Construction
1991 M.O.E. Yeng Tong Construction Pte Ltd
Proposed Extension of Workshop with Additions and Alternations to Existing Factory and Office on Plot 3181 Gul Avenue, Jurong,
Singapore
Structural Steel Workshop Construction
1990 ~ 1991 Akitek Yeokhoo Degree Engineering Pte Ltd
Proposed Infrastructural Development at Pulau Sudong, Singapore
Infrastructure 1990 ~ 1991 Mindef RSEA International Pte Ltd
Proposed Part 1 / Part 2 Storey Factory With Ancillary Facilities on Plot A10593 MK 11 at Kranji Road, Singapore
Concrete / Steel Frame Building for Factory
1990 Thiong Shen Auto Parts Trading
Degree Engineering Pte Ltd
Proposed Development at Sungei Berih, Singapore
Dredging Works 1990 ~ 1991 Mindef Yeng Tong Construction Pte Ltd
-Shore Protection Works at Pantai Mentiri Gold Course, Brunei
Shore Protection Works 1989 ~ 1990 P. W. D. (Brunei) Ted Sdn Bhd
Upgrading of Western Trainning Wall at Muara, Brunei
Construction of Conrete Seawall
1989 P. W. D. (Brunei) Daito Kogyo Co Ltd
Page 10 of 34
TITLEYENG TONG'S SCOPE OF
WORKSYEAR CLIENT MAIN CONTRACTOR
CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD
Stone Revetments & Seabed Protection Works for Beach & Lagoon Improvements for Sentosa, Singapore
Dredging and Revetment Works
1988 ~ 1989 Sentosa Development Corporation
Van Oord International / RDC / Antara Koh J.V.
Stone Revetment Works at Penjuru Lane, Singapore
Revetment Works 1988 Containerisation & Packaging Industries
Pte Ltd
Koh Brothers Building & Civil Engineering
Contractor Pte Ltd
Headlands Construction at Eastern End of Pelompong Spit, Brunei
Granite Headland Construction
1987 ~ 1988 P. W. D. (Brunei) Daito Kogyo Co Ltd
Repairs & Pointing to Revetments at Marina Park, Singapore
Repair & Cement Pointing of Revetment
1987 ~ 1988 P. W. D. Yeng Tong Construction Pte Ltd
Rock Bund Construction for Dredging and Reclamation Works at Muara Harbour, Brunei
Rock Bund Construction 1986 ~ 1987 P. W. D. (Brunei) Daito Kogyo Co Ltd
Rock Bund Construction for Yishun MRT Contract 402, Singapore
Rock Bund Construction 1986 ~ 1987 MRTC GTM-SN Coignet Contractors
Shore Protection Works for Fish Landing Complex at Muara, Brunei
Shore Protection Works 1986 P. W. D. (Brunei) San Hin Welding & Construction
Shore Protection Works for Reclamation of Terumbu Pesek, Brunei
Shore Protection Works 1985 Jurong Town Council Boka-Ballast
Shore Protection Works for Reclamation of Pulau Sakra, Singapore
Shore Protection Works 1984 ~ 1985 Jurong Town Council Boka - Ballast
Shore Protection Works for Reclamation of Pulau Busing, Singapore
Shore Protection Works 1983 ~ 1984 Jurong Town Corporation
Boka - Ballast
Headland Construction at Pelompong Spit, Brunei
Headland Construction1982 P.W. D. (Brunei) Daito Kogyo Co Ltd
Page 11 of 34
* All Amounts are in SGD unless otherwise stated.
TITLEYENG TONG'S SCOPE OF
WORKSCONTRACT VALUE YEAR CLIENT MAIN CONTRACTOR
Proposed Construction and Completion of
Coastal Protection Works at Teluk Lipat,
Dungun, Terengganu Darul Iman
Shore Protection Works RM37,919,100.00July 2012 ~ Jan
2015
East Coast Economic
Region Development
Council (ECERDC)
Pembinaan Yeng Tong Sdn
Bhd
Proposed Construction and Completion of
Coastal Protection Works at Tanjung
Batu, Pekan, Pahang Darul Makmur
Shore Protection Works RM1,832,800.00Aug 2012 ~ Nov
2012
East Coast Economic
Region Development
Council (ECERDC)
Pembinaan Yeng Tong Sdn
Bhd
PJ104Shore Protection Work for Reclaimation
Work At RRM V/OReclamation works $1,936,651.00 Aug 2012~
Hyundai Engineering &
Construction Co. LtdJTC Corporation
PJ103 Reclamation of T-Bund at Jurong Island Reclamation works $10,820,626.00 May 2012 ~ Penta Ocean Construction
Pte Ltd
Koon Construction &
Transport Co. Pte Ltd.
PJ102Shore Protection Work for Reclaimation
Work At A2 - A3a Corner V/O
Reclaimation of Jurong
Island Phrase 4 % Tuas View
Extension Option 1-1
$2,534,575.00 Apr 2012 ~Hyundai Engineering &
Construction Co. LtdJTC Corporation
PJ101 Proposed Dredging of Benoi Basin Dredging Works $1,438,430.00Feb 2012~
Jun 2012JTC Corporation
Yeng Tong Construction
Pte Ltd
PJ100
Reclamation of Jurong Island PH4 & Tuas
View Extension Shore Protection Works
For New Yard Phase 2 V.O.
Shore Protection Works $8,935,140.00Sep 2011~
Mar 2012JTC Corporation
Hyundai Engineering &
Construction Co. Ltd
PJ099Reclamation of Jurong Island Phase 4 &
Tuas View Extension - Option 1-1
Shore Protection Works at
New Yard Phase 2$3,312,550.00
Sept 2011~
Feb 2012JTC Corporation
Hyundai Engineering &
Construction Co. Ltd
PJ098
Design and Reclamation at Ayer Merbau -
Phase 1 Part 2, Jurong Island - Sub
Contract for Removal of Existing
Revetment and Construction of New
Shore Protection
Revetment & Shore
Protection Works$11,000,000.00
Jul 2011~
Jun 2012JTC Corporation
Samsung C & T
Corporation
CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD
PJ097Project D2004-00903-120-Dredging
Works at CNB Ship BasinDredging Works $1,169,000.00
Jul 2011~
Dec 2011
Defence Science and
Technologh Agency
Yeng Tong Construction
Pte Ltd
PJ095
Proposed Pier on Lot 07442X PT (New Lot
8609WPT) MK05 To The Existing
Workshop At No. 15 Pandan Crescent On
Lot 04904K MK 05 (Clementi Planing
Area)
Dredging, Piling & RC
Works$2,967,835.00
Jun 2011~
Feb 2012
Tiong Woon Crane &
Transport Pte Ltd
Yeng Tong Construction
Pte Ltd
PJ094
Reclamation of Jurong Island PH4 & Tuas
View Extension Sandkey Dredging For
New Yard Phase 2 V/O
Dredging Works $4,232,300.00May 2011~
Aug 2011JTC Corporation
Hyundai Engineering &
Construction Co. Ltd
PJ093Revelopment of Sungei Buloh Wetland
Reserve (Phase 1)
Improved the tidal gates D6;
Restoration of existing sluice
gate A3; Toe-protection and
rstoration of the mangrove;
Constructon of an offshore
breakwater.
$5,765,055.75Apr 2011~
Apr 2012National Parks Board
Yeng Tong Construction
Pte Ltd
PJ092
Reclamation Of Jurong Island Phase 4 and
Tuas View Extension Option 1-1
- Rock Works Below Finger Pier
Rocks Works $3,139,695.96Sep 2010~
Feb 2011JTC Corporation
Hyundai Engineering &
Construction Co. Ltd
PJ091
Marine structures, current Training
Wall and other Acillary Works for
International Cruise Terminal at
Marina South
Supply & Place Stone
Revetment Incl Sand
Trimming & Geofabric
Works
$8,800,000.00 mar2010 ~ feb
2011
Ee Fong Construction
Pte Ltd
Penta-Ocean
Construction Co. Ltd
PJ090
Dredging Works at P01 to P09, P21 to
P26 and PSA defined area at Pasit Panjang
Terminal
Dredging Works $3,370,000.00Mar 2010 ~ Sept
2010PSA Corporation Ltd.
Yeng Tong Construction
Pte Ltd
PJ088
Dredging works for proposed additiona
and alterations to an existing jetty at an
existing workshop at No. 72, Loyang Way
Dredging Works $1,300,000.00Feb 2010 ~
May 2010
Technics Offshore
Engineering Pte. Ltd.
Oung Construction Pte.
Ltd.
PJ087
Reclamation Of Jurong Island Phase 4 and
Tuas View Extension Option 2-1
- Shore Protection At Area 3B5b and Area
4A
Shore Protection Works $4,204,260.00Dec 2009 ~
Oct 2010JTC Corporation PKDBH Joint Venture
PJ086Dredging Works At Jetty of Senoko Power
StationDredging Works $444,480.00
Apr 2009 ~
Aug 2009Senoko Power
Federal Resource Services
Pte Ltd
PJ084Upgrading of Berths K12, K13 & K14 At
Keppel Terminal And Dredging WorksDredging Works $2,921,414.74
Nov 2008 ~
Oct 2009PSA Corporation Limited
Muhibbah Engineering
(S'pore) Pte Ltd
PJ077Additional Reclamation at Pulau Ayer
Merbau
Stone Supply & Shore
Protetion Works$3,503,400.00
Oct 2008 ~
Feb 2009JTC Corporation
Hyundai Engineering and
Construction Limited
PJ082 Supply & Delivery of Sea Sand Supply & Delivery of Sea
Sand $250,250,000.00
Apr 2008 ~
Jan 2010JTC Corporation
Yeng Tong Construction
Pte Ltd
PJ081
Reclamation for Pasir Panjang Terminal
Phases 3 and 4
Contract No. 30/06.C08
Stone Supply $30,934,210.00Oct 2008 ~
Jun 2012
Maritime and Port
Authority of Singapore
Hyundai Engineering and
Construction Limited
PJ080Removal of Rock from the Seabed at Selat
Sengkir at SentosaDredging Works $356,000.00
Jun 2008 ~
Jul 2009
McConnell Dowell South
East Asia Pte Ltd
Yeng Tong Construction
Pte Ltd
PJ079Proposed Dredging work at Berth 4 &
Seawater Intake at PCS
Dredging & Sand Capping
Works$429,123.00
Jul 2008 ~
Aug 2008HSL Constructor Pte Ltd
Yeng Tong Construction
Pte Ltd
PJ078Reclamation of Jurong Island PH 4 & Tuas
View Extension
Sub-Contract for Shore
Protection Works in Area A2-
Megayard Phase 1 & Part of
2
$2,307,000.00Apr 2008 ~
Dec 2008JTC Corporation
Hyundai Engineering &
Construction Co. Ltd - Van
Oord ACZ - Ballast Nedam
JV
PJ077Reclamation of Pulau Ayer Merbau,
Jurong Island Phase 1
Removal of Existing Shore
Protection$136,750.00
Jan 2008 ~
Feb 2008JTC Corporation
Hyundai Engineering &
Construction Co. Ltd
PJ076Supply & Delivery of Sea Sand to
Singapore for JTC Corporation (JTC)Stevedoring S$1.30 per M3
Oct 2007 ~
May 2010JTC Corporation
Various Sea Sand
Suppliers
PJ075Dredging at Changi Creek Leading to /
from Changi Point Ferry TerminalDredging Works $456,877.00
Sep 2007 ~
Feb 2008
Maritime and Port
Authority of Singapore
Yeng Tong Construction
Pte Ltd
PJ074Sub-Contract for Removal of
Underground Obstruction at Marina BayWet Excavation Works $2,123,490.00
Aug 2007 ~
Aug 2008
Urban Redevelopment
Authority
Gammon Construction
Limited Singapore Branch
PJ073
Proposed Addition & Alteration and
Repair Works to Existing Jetty on Lot
07309W MK05 at No. 13 Pandan
Crescent
Repairs Jetty & Dredging
Works$2,210,525.00
Aug 2007 ~
Jul 2008
Tiong Woon Crane &
Transport Pte Ltd
Yeng Tong Construction
Pte Ltd
PJ072
Construction of Wharf and Ringer
Foundation at PPL Shipyard, 27 Tuas
Crescent
Wharf and ringer
foundation$2,100,825.00
May 2007 ~
Sep 2007PPL Shipyard Pte Ltd
Yeng Tong Construction
Pte Ltd
-
Proposed Widening of the Existing
Penang Bridge Low Level viaduct from
East Abutment to Pier 24E and from Pier
24W to Pier 69W - Optim3B (Marine)
Bored pile and pile cap
worksRM90,235,982.00
Feb 2007 ~
Mar 2009Penang Bridge Sdn Bhd
UEM Construction Sdn
Bhd & Biaxis Sdn Bhd
-Shuaibah Phase III IWPP Desalination
Plant (Civil Offshore Works)
Shoreline Protection and
Offshore WorksRM25,700,420.00
Oct 2006 ~
Nov 2007
Shuaibah Water and
Electricity Company
Zelan Construction Arabia
Co. Ltd & Pembinaan Yeng
Tong Sdn Bhd JV
Reclamation of Sakra Basin, Construction
of Roads, Drains, Sewers and ancillary
works off Sakra Road, Jurong Island
Shore protection works and
Dredging$1,893,000.00
Aug 2006 ~
Jun 2007Jurong Town Corporation
Hyundai Engineering and
Construction Limited
PJ071Beach Protection Works at Siloso Beach,
Sentosa
Sandy Beach & Headland
Construction$3,886,224.00
Feb 2006 ~
Oct 2006
Sentosa Development
Corporation
Yeng Tong Construction
Pte Ltd
PJ070Reclamation at Pulau Ubin and Pulau
Tekong (Part I)
Subcontract for Sandy Beach
Construction at Area A "D-A
/ D-B"
$2,193,984.00Jun 2005 ~
May 2006
Housing Development
Board, Singapore
Van Oord Dredging And
Marine Contractors B.V.
-
Cadangan Pembinaan Pelabuhan Tanjung
Pelepas Fasa 3 - The Construction,
completion and Maintenance of Wharves
Structures at Berth 9 & 10
Dredging and Arnour Rock
ProtectionRM9,386,500.00
May 2005 ~
May 2006
Tanjung Pelepas Port
Authority, Johor
Zelan Construction Sdn
Bhd & Omni-Kwang JV
-
Dredging and Armour Rock Works to
C.W Outfall and C.W Intake for Power
Plant at Tanjung Bin, Johor
Dredging and Arnour Rock
ProtectionRM9,095,030.00
Mar 2005 ~
Jun 2005
Tanjung Bin Power Plant
Sdn Bhd
Zelan Construction Sdn
Bhd & Omni-Kwang JV
PJ069Maintenance Dredging Works at Pasir
Panjang Terminal, Area A, B & C
Dredging at -15.0 and -
16.0 MCD and Rock
Rectification Works
$2,088,411.00Nov 2004 ~
Jul 2006PSA Corporation Limited
Yeng Tong Construction
Pte Ltd
PJ069Maintenance Dredging at Pasir Panjang
Terminal Area DDredging at -15.0 MCD $505,667.00
Nov 2004 ~
Jul 2005PSA Corporation Ltd
Yeng Tong Construction
Pte Ltd
PJ069Maintenance Dredging at Sembawang
WharvesDredging at -11.00 MCD $490,000.00
Nov 2004 ~
Jan 2005PSA Corporation Ltd
Yeng Tong Construction
Pte Ltd
PJ068Dredging Works at Pasir Panjang
WharvesDredging Works $350,000.00
Nov 2003 ~
Dec 2003PSA Corporation Ltd
Yeng Tong Construction
Pte Ltd
Seabed Preparation Pipeline Installation
and Rock Armour Protection Works in
Indonesian Waters
Reinstating Seabed and
Filling Trench over Gas
Pipeline
$220,000.00Jun 2003 ~
Aug 2003
PT. Perusahaan Gas
NegaraBoskalis-Idors J.O.
PJ066
PGN Offshore Pipeline Project at Kuala
Tunkal, Sumatra & Batam Island in
Indonesia
Placing Rock on Gas Pipeline
in Seabed$1,423,015.00
Jun 2003 ~
Jul 2003
PT. Perusahaan Gas
Negara
Hyundai Heavy Industries
Co. Ltd
PJ063Powergas / PMG Submarine Gas Pipeline
Project at Pulau SakraReinstatement of Revetment $321,000.00
Apr 2003 ~
Jun 2003Powergas Ltd JDN - Boskalis JV
Dredging at Tanjong Pagar Terminal to
Deepen Berth from -12.0m to -13.6m CDDredging Works $500,000.00
May 2003 ~
Jul 2003PSA Corporation Limited
Yeng Tong Construction
Pte Ltd
-Cadangan Pembangunan Pelabuhan
Tanjung Pelepas - Phase IIRock Revetment Work RM34,000,000.00
Oct 2003 ~
Jun 2004
Tanjung Pelepas Port
Authority, JohorInai Kiara Sdn Bhd
PJ057
Reclamation of Jurong Island Phase 4 &
Tuas View Extension - Shore Protection
Works
Shore Protection Works $15,500,581.00 2002 ~ 2005 Jurong Town Corporation
Hyundai Engineering &
Construction Co. Ltd &
Van Oord ACZ Ballast
Ham Rock Joint Venture
Removal and Reinstallation Of Revetment
At Pulau Sakra Landfall East And West
Natuna Pipeline
Removal and Reinstallation
of Revetment$332,839.00
Jun 2002 ~
Aug 2002Powergas Ltd
Jan De Nul - Boskalis Joint
Venture
Removal of 25 Nos. Mooring Piles From
Sentosa Cove Marina at Sentosa
Removing Steel Piles from
Seabed$39,583.33 Feb 2002
Sentosa Development
Corporation
Yeng Tong Construction
Pte Ltd
Proposed Redevelopment of Changi Point
Ferry Terminal - Dredging Works
Dredging Works and
Breaking underwater Rocks$1,000,000.00 2001 ~ 2002
Urban Redevelopment
Authority
Swee Hong Engineering
Construction Pte Ltd
Maintenance Dredging At Tanjong Pagar
Terminal, Keppel Terminal, Pasir Panjang
Terminal and Pasir Panjang Wharves
Dredging Works $700,000.00Oct 2001 ~
Jan 2002PSA Corporation Limited
Yeng Tong Construction
Pte Ltd
North Eastern Coast Reclamation Phase 4
Area At Punggol And Coney IslandTrimming Seabed to Profiles $125,000.00 Aug 2001 Government of Singapore Jan De Nul (S) Pte Ltd
Reclamation at Changi East - Area 'A'
North - Proposed Soil Improvement
Works at Asian Aerospace Site - Changi
East
Surcharge Removal Works $4,828,570.00 2001 - 2003Building Construction
Authority of Singapore
Hyundai - Koon - Boskalis
Joint Venture
Proposed Additional Changi East
Reclamation (Phase 1C) SingaporeShore Protection Works $750,000.00 May - Dec 2001 Government of Singapore
Hyundai - Koon - Boskalis
Joint Venture
Reclamation at Pulau Ubin and Pulau
Tekong (Part I)
Site Clearence and Removal
of Rock Headlands$1,630,000.00 2001
Housing Development
Board, Singapore
TOA-JDN (PUT) Joint
Venture
J130 - Seraya Project 2 (Civil Works For
Non-Revamp Area)
Shore Protection Works For
Cooling Water Outfall
Station
$420,000.00 2001 Ellba Eastern (Shell) Gammon Pte Ltd
Reclamation at Changi East Area "A"
(South) - Surcharge Removal Work in M-
1 Area (SPEC/QS/431/98)
Surcharge Remvoal Work $3,690,000.00 2001 Government of Singapore
Samsung Corporation
(Engineering &
Construction Group)
Proposed Additional Reclamation at
Southern Sentosa Cove
Reclamation / Dredging Soil
Improvement and
Revetment Works
$10,333,000.00 2000 ~ 2001Sentosa Development
Corporation
Yeng Tong Construction
Pte Ltd
Redevelopment of Colombo Port Dredging Works $2,200,000.00 1999 ~ 2001 Government of Sri LankaHyundai Engineering and
Construction Limited
Dredging Works at Berth K13-K14
Keppel TerminalDredging Works $68,000.00 1999 ~ 2000
Port of Singapore
Authority
Yeng Tong Construction
Pte Ltd
Proposed Changi East Reclamation (Phase
1C), Singapore
Revetment Construction
Works$26,228,327.00 1997 ~ 1999 Government of Singapore
Hyundai - Koon - Boskalis
Joint Venture
Proposed Design & Construction of Off-
Shore Islets at Siloso Beach, Sentosa,
Singapore
Reclamation / Dredging and
Beach Fromation Works$6,800,000.00 1997 ~ 1998
Sentosa Development
Corporation
Sing Lian Huat-Yeng Tong
Construction Pte Ltd
Construction of Two Breakwaters and
Other Facilities at Jerudong Beach, Brunei
Breakwater Construction
WorksB$ 62545657 1997 ~ 1998
Amedeo Development
Corporation Sdn Bhd
Hyundai Engineering &
Construction Co. Ltd
Construction of Marina Entrance and
Revetment Works, Singapore
Construction of Marina /
Dredging and Shore
Protection Works
$14,870,000.00 1997 ~ 1998Sentosa Development
Corporation
Sing Lian Huat - Yeng
Tong Construction Joint
Venture
Bridge at Marina Bay Project, Singapore Revetment Works $190,055.00 1997 Public Works Department Obayashi Corporation
Construction & Completion of Jetties,
Breakwater, Groyne, Dredging, Beach
Reclamation and Associated Marine
Works at Tanjong Leman & Pulau Sibu
Tengah, Mersing, Johor
Construction of Jetties,
Breakwater Groyne,
Dredging and Reclamation
RM8,800,000.00 1996 ~ 1997Kumpulan Penambang
(Johor) Sdn Bhd
Tidalmarine Engineering
Sdn Bhd
Proposed Demolition of Existing Ramp
and Construction of Revetment at Tanjong
Beach, Sentosa, Singapore
Construction Ramp
Construction and Revetment
Works
$121,234.00 1995 ~ 1996Sentosa Development
Corporation
Yeng Tong Construction
Pte Ltd
Modification to Shore Protection Works
Adjacent to Ramp at Shell Ferry Terminal,
Pasir Panjang, Singapore
Shore ProtectionWorks $60,000.00 1995Port of Singapore
Authority
Uninec Construction Pte
Ltd
Construction of Dredging Ditch and Slope
Protection Work at Western Catchment
Revervoirs, Singapore
Construction of Concrete
Drains and Slope Protection$350,000.00 1995 ~ 1996 Public Utilities Board
Yeng Tong Construction
Pte Ltd
Control of Beach Erosion of Coastline of
Berakas Camp Coastline Protection -
Brunei Darussalam.
Shore Protection Works B$ 6,500,000.00 1994 ~ 1995 Government of Singapore Daito Kogyo Co Ltd
Repairs to Existing Sunken Rockbunds
and Revetment at Southern Island,
Singapore
Repair and Construct New
Revetment$1,538,501.00 1993 ~ 1994
Sentosa Development
Corporation
Yeng Tong Construction
Pte Ltd
Repairs of Seawall at 30 Bukit Chermin
Road, SingaporeRepair Concrete Seawall $19,000.00 1993
Port of Singapore
Authority
Yeng Tong Construction
Pte Ltd
Reno Matters for Bedok Fifth Subsidiary
Drain, SingaporeConstruction of Drain $40,000.00 1993 Ministry of Environment
Swee Hong Engineering
Construction Pte Ltd
Proposed Revetment for KYC Machine
Industry (S) Pte Ltd, SingaporeRevetment Works $35,000.00 1993
KYC Machine Industry (S)
Pte Ltd
Yeng Tong Construction
Pte Ltd
Proposed Changi East Reclamation (Phase
1A), SingaporeShore Protection Works $37,525,624.60 1992 ~ 1996 Government of Singapore
Obayashi - Toyo Joint
Venture
Reconstruction of Granite - Block Stone &
Drain, SingaporeRubble Stone Drains $25,000.00 1992 Bukit Timah Turf Club
Uninec Construction Pte
Ltd
Proposed North Butterworth Container
Terminal, MalaysiaShore Protection Works RM10,502,175.00 1992
Penang Port
CommissionerIJM Corporation Bhd
- Subcontract for Rubble/Revetment
Wall ConstructionRubble / Revetment Wall $288,000.00 1991 P. W. D.
Obayashi - Toyo Joint
Venture
- Reconstruction of Tanjong Berlayer
Seawall, SingaporeConcrete Seawall $130,108.00 1992 ~ 1993 P. W. D.
Obayashi - Toyo Joint
Venture
Maintenance of Seawall at Raffles
Lighthouse, SingaporeRepair of Revetment $240,000.00 1991 ~ 1992
Port of Singapore
Authority
Uninec Construction Pte
Ltd
Proposed Dredging Work at Tiong Woon
Jetty, SingaporeDredging Works $50,000.00 1991
Tiong Woon Crane &
Transport Pte Ltd
Yeng Tong Construction
Pte Ltd
Proposed Dredging at Selat Samulun,
SingaporeDredging Works $300,000.00 1991 M.O.E. N. C. Senan & Sons Pte Ltd
-Proposed Johor - Singapore Ferry
Terminal, SingaporeDredging Works $500,000.00 1991 ~ 1992 J. K. R. Syarikat Sri Shah Sdn Bhd
Proposed Reconstruction of Outlet Drain
at Pioneer Sector, Singapore
Concrete Outfall Drain
Construction$178,000.00 1991 M.O.E.
Yeng Tong Construction
Pte Ltd
Proposed Extension of Workshop with
Additions and Alternations to Existing
Factory and Office on Plot 3181 Gul
Avenue, Jurong, Singapore
Structural Steel Workshop
Construction$1,250,600.00 1990 ~ 1991 Akitek Yeokhoo Degree Engineering Pte Ltd
Proposed Infrastructural Development at
Pulau Sudong, SingaporeInfrastructure $1,393,000.00 1990 ~ 1991 Mindef RSEA International Pte Ltd
Proposed Part 1 / Part 2 Storey Factory
With Ancillary Facilities on Plot A10593
MK 11 at Kranji Road, Singapore
Concrete / Steel Frame
Building for Factory$600,000.00 1990
Thiong Shen Auto Parts
TradingDegree Engineering Pte Ltd
Proposed Development at Sungei Berih,
SingaporeDredging Works $650,000.00 1990 ~ 1991 Mindef
Yeng Tong Construction
Pte Ltd
-Shore Protection Works at Pantai Mentiri
Gold Course, BruneiShore Protection Works B$ 2,700,000.00 1989 ~ 1990 P. W. D. (Brunei) Ted Sdn Bhd
Upgrading of Western Trainning Wall at
Muara, Brunei
Construction of Conrete
SeawallB$ 176,000.00 1989 P. W. D. (Brunei) Daito Kogyo Co Ltd
Stone Revetments & Seabed Protection
Works for Beach & Lagoon Improvements
for Sentosa, Singapore
Dredging and Revetment
Works$1,109,000.00 1988 ~ 1989
Sentosa Development
Corporation
Van Oord International /
RDC / Antara Koh J.V.
Stone Revetment Works at Penjuru Lane,
SingaporeRevetment Works $45,000.00 1988
Containerisation &
Packaging Industries Pte
Ltd
Koh Brothers Building &
Civil Engineering
Contractor Pte Ltd
Headlands Construction at Eastern End of
Pelompong Spit, Brunei
Granite Headland
ConstructionB$ 2,100,000.00 1987 ~ 1988 P. W. D. (Brunei) Daito Kogyo Co Ltd
Repairs & Pointing to Revetments at
Marina Park, Singapore
Repair & Cement Pointing of
Revetment$288,000.00 1987 ~ 1988 P. W. D.
Yeng Tong Construction
Pte Ltd
Rock Bund Construction for Dredging
and Reclamation Works at Muara
Harbour, Brunei
Rock Bund Construction B$ 500,000.00 1986 ~ 1987 P. W. D. (Brunei) Daito Kogyo Co Ltd
Rock Bund Construction for Yishun MRT
Contract 402, SingaporeRock Bund Construction $740,000.00 1986 ~ 1987 MRTC
GTM-SN Coignet
Contractors
Shore Protection Works for Fish Landing
Complex at Muara, BruneiShore Protection Works B$ 70,000.00 1986 P. W. D. (Brunei)
San Hin Welding &
Construction
Shore Protection Works for Reclamation
of Terumbu Pesek, BruneiShore Protection Works B$ 500,000.00 1985 Jurong Town Council Boka-Ballast
Shore Protection Works for Reclamation
of Pulau Sakra, SingaporeShore Protection Works B$ 2,200,000.00 1984 ~ 1985 Jurong Town Council Boka - Ballast
Shore Protection Works for Reclamation
of Pulau Busing, SingaporeShore Protection Works B$ 1,800,000.00 1983 ~ 1984 Jurong Town Corporation Boka - Ballast
Headland Construction at Pelompong
Spit, BruneiHeadland Construction B$ 1,500,000.00 1982 P.W. D. (Brunei) Daito Kogyo Co Ltd
* All Amounts are in SGD unless otherwise stated.
TITLEYENG TONG'S SCOPE OF
WORKSCONTRACT VALUE YEAR CLIENT MAIN CONTRACTOR
PJ105Maintenance dredging at tanjong pagar,
keppel and brani terminal defined areasDredging Works S$4865425.00
26/11/2012~
25/08/2013
PSA CORPORATION
LIMITED
Yeng Tong Construction
Pte Ltd
PJ104Shore Protection Work for Reclaimation
Work At RRM V/OReclamation works $1,936,651.00 Aug 2012~
Hyundai Engineering &
Construction Co. LtdJTC Corporation
PJ103 Reclamation of T-Bund at Jurong Island Reclamation works $10,820,626.00 May 2012 ~ Penta Ocean Construction
Pte Ltd
Koon Construction &
Transport Co. Pte Ltd.
PJ102Shore Protection Work for Reclaimation
Work At A2 - A3a Corner V/O
Reclaimation of Jurong
Island Phrase 4 % Tuas View
Extension Option 1-1
$2,534,575.00 Apr 2012 ~Hyundai Engineering &
Construction Co. LtdJTC Corporation
PJ101 Proposed Dredging of Benoi Basin Dredging Works $1,438,430.00Feb 2012~
Jun 2012JTC Corporation
Yeng Tong Construction
Pte Ltd
PJ100
Reclamation of Jurong Island PH4 & Tuas
View Extension Shore Protection Works
For New Yard Phase 2 V.O.
Shore Protection Works $8,935,140.00Sep 2011~
Mar 2012JTC Corporation
Hyundai Engineering &
Construction Co. Ltd
PJ099Reclamation of Jurong Island Phase 4 &
Tuas View Extension - Option 1-1
Shore Protection Works at
New Yard Phase 2$3,312,550.00
Sept 2011~
Feb 2012JTC Corporation
Hyundai Engineering &
Construction Co. Ltd
PJ098
Design and Reclamation at Ayer Merbau -
Phase 1 Part 2, Jurong Island - Sub
Contract for Removal of Existing
Revetment and Construction of New
Shore Protection
Revetment & Shore
Protection Works$11,000,000.00
Jul 2011~
Jun 2012JTC Corporation
Samsung C & T
Corporation
CONTRACTS EXECUTED BY YTC IN SINGAPORE
PJ097Project D2004-00903-120-Dredging
Works at CNB Ship BasinDredging Works $1,169,000.00
Jul 2011~
Dec 2011
Defence Science and
Technologh Agency
Yeng Tong Construction
Pte Ltd
PJ095
Proposed Pier on Lot 07442X PT (New Lot
8609WPT) MK05 To The Existing
Workshop At No. 15 Pandan Crescent On
Lot 04904K MK 05 (Clementi Planing
Area)
Dredging, Piling & RC
Works$2,967,835.00
Jun 2011~
Feb 2012
Tiong Woon Crane &
Transport Pte Ltd
Yeng Tong Construction
Pte Ltd
PJ094
Reclamation of Jurong Island PH4 & Tuas
View Extension Sandkey Dredging For
New Yard Phase 2 V/O
Dredging Works $4,232,300.00May 2011~
Aug 2011JTC Corporation
Hyundai Engineering &
Construction Co. Ltd
PJ093Revelopment of Sungei Buloh Wetland
Reserve (Phase 1)
Improved the tidal gates D6;
Restoration of existing sluice
gate A3; Toe-protection and
rstoration of the mangrove;
Constructon of an offshore
breakwater.
$5,765,055.75Apr 2011~
Apr 2012National Parks Board
Yeng Tong Construction
Pte Ltd
PJ092
Reclamation Of Jurong Island Phase 4 and
Tuas View Extension Option 1-1
- Rock Works Below Finger Pier
Rocks Works $3,139,695.96Sep 2010~
Feb 2011JTC Corporation
Hyundai Engineering &
Construction Co. Ltd
PJ091
Marine structures, current Training
Wall and other Acillary Works for
International Cruise Terminal at
Marina South
Supply & Place Stone
Revetment Incl Sand
Trimming & Geofabric
Works
$8,800,000.00 mar2010 ~ feb
2011
Ee Fong Construction
Pte Ltd
Penta-Ocean
Construction Co. Ltd
PJ090
Dredging Works at P01 to P09, P21 to
P26 and PSA defined area at Pasit Panjang
Terminal
Dredging Works $3,370,000.00Mar 2010 ~ Sept
2010PSA Corporation Ltd.
Yeng Tong Construction
Pte Ltd
PJ088
Dredging works for proposed additiona
and alterations to an existing jetty at an
existing workshop at No. 72, Loyang Way
Dredging Works $1,300,000.00Feb 2010 ~
May 2010
Technics Offshore
Engineering Pte. Ltd.
Oung Construction Pte.
Ltd.
PJ087
Reclamation Of Jurong Island Phase 4 and
Tuas View Extension Option 2-1
- Shore Protection At Area 3B5b and Area
4A
Shore Protection Works $4,204,260.00Dec 2009 ~
Oct 2010JTC Corporation PKDBH Joint Venture
PJ086Dredging Works At Jetty of Senoko Power
StationDredging Works $444,480.00
Apr 2009 ~
Aug 2009Senoko Power
Federal Resource Services
Pte Ltd
Proposed Nusajaya waterfront precinct on
Part of Lot PTD 141089 And Part of Lot
PTD141090, Mukim Pulai, Bandar
Nusajaya
Earthworks, Dredging
works , Relcamation RM$72,320,772.50
Mar 2009 ~ Jan
2010 UEM LAND
Yeng Tong Construction
Pte Ltd
PJ084Upgrading of Berths K12, K13 & K14 At
Keppel Terminal And Dredging WorksDredging Works $2,921,414.74
Nov 2008 ~
Oct 2009PSA Corporation Limited
Muhibbah Engineering
(S'pore) Pte Ltd
PJ077Additional Reclamation at Pulau Ayer
Merbau
Stone Supply & Shore
Protetion Works$3,503,400.00
Oct 2008 ~
Feb 2009JTC Corporation
Hyundai Engineering and
Construction Limited
PJ082 Supply & Delivery of Sea Sand Supply & Delivery of Sea
Sand $250,250,000.00
Apr 2008 ~
Jan 2010JTC Corporation
Yeng Tong Construction
Pte Ltd
PJ081
Reclamation for Pasir Panjang Terminal
Phases 3 and 4
Contract No. 30/06.C08
Stone Supply $30,934,210.00Oct 2008 ~
Jun 2012
Maritime and Port
Authority of Singapore
Hyundai Engineering and
Construction Limited
PJ080Removal of Rock from the Seabed at Selat
Sengkir at SentosaDredging Works $356,000.00
Jun 2008 ~
Jul 2009
McConnell Dowell South
East Asia Pte Ltd
Yeng Tong Construction
Pte Ltd
PJ079Proposed Dredging work at Berth 4 &
Seawater Intake at PCS
Dredging & Sand Capping
Works$429,123.00
Jul 2008 ~
Aug 2008HSL Constructor Pte Ltd
Yeng Tong Construction
Pte Ltd
PJ078Reclamation of Jurong Island PH 4 & Tuas
View Extension
Sub-Contract for Shore
Protection Works in Area A2-
Megayard Phase 1 & Part of
2
$2,307,000.00Apr 2008 ~
Dec 2008JTC Corporation
Hyundai Engineering &
Construction Co. Ltd - Van
Oord ACZ - Ballast Nedam
JV
PJ077Reclamation of Pulau Ayer Merbau,
Jurong Island Phase 1
Removal of Existing Shore
Protection$136,750.00
Jan 2008 ~
Feb 2008JTC Corporation
Hyundai Engineering &
Construction Co. Ltd
PJ076Supply & Delivery of Sea Sand to
Singapore for JTC Corporation (JTC)Stevedoring S$1.30 per M3
Oct 2007 ~
May 2010JTC Corporation
Various Sea Sand
Suppliers
PJ075Dredging at Changi Creek Leading to /
from Changi Point Ferry TerminalDredging Works $456,877.00
Sep 2007 ~
Feb 2008
Maritime and Port
Authority of Singapore
Yeng Tong Construction
Pte Ltd
PJ074Sub-Contract for Removal of
Underground Obstruction at Marina BayWet Excavation Works $2,123,490.00
Aug 2007 ~
Aug 2008
Urban Redevelopment
Authority
Gammon Construction
Limited Singapore Branch
PJ073
Proposed Addition & Alteration and
Repair Works to Existing Jetty on Lot
07309W MK05 at No. 13 Pandan
Crescent
Repairs Jetty & Dredging
Works$2,210,525.00
Aug 2007 ~
Jul 2008
Tiong Woon Crane &
Transport Pte Ltd
Yeng Tong Construction
Pte Ltd
PJ072
Construction of Wharf and Ringer
Foundation at PPL Shipyard, 27 Tuas
Crescent
Wharf and ringer
foundation$2,100,825.00
May 2007 ~
Sep 2007PPL Shipyard Pte Ltd
Yeng Tong Construction
Pte Ltd
Reclamation of Sakra Basin, Construction
of Roads, Drains, Sewers and ancillary
works off Sakra Road, Jurong Island
Shore protection works and
Dredging$1,893,000.00
Aug 2006 ~
Jun 2007Jurong Town Corporation
Hyundai Engineering and
Construction Limited
PJ071Beach Protection Works at Siloso Beach,
Sentosa
Sandy Beach & Headland
Construction$3,886,224.00
Feb 2006 ~
Oct 2006
Sentosa Development
Corporation
Yeng Tong Construction
Pte Ltd
PJ070Reclamation at Pulau Ubin and Pulau
Tekong (Part I)
Subcontract for Sandy Beach
Construction at Area A "D-A
/ D-B"
$2,193,984.00Jun 2005 ~
May 2006
Housing Development
Board, Singapore
Van Oord Dredging And
Marine Contractors B.V.
PJ069Maintenance Dredging Works at Pasir
Panjang Terminal, Area A, B & C
Dredging at -15.0 and -
16.0 MCD and Rock
Rectification Works
$2,088,411.00Nov 2004 ~
Jul 2006PSA Corporation Limited
Yeng Tong Construction
Pte Ltd
PJ069Maintenance Dredging at Pasir Panjang
Terminal Area DDredging at -15.0 MCD $505,667.00
Nov 2004 ~
Jul 2005PSA Corporation Ltd
Yeng Tong Construction
Pte Ltd
PJ069Maintenance Dredging at Sembawang
WharvesDredging at -11.00 MCD $490,000.00
Nov 2004 ~
Jan 2005PSA Corporation Ltd
Yeng Tong Construction
Pte Ltd
PJ068Dredging Works at Pasir Panjang
WharvesDredging Works $350,000.00
Nov 2003 ~
Dec 2003PSA Corporation Ltd
Yeng Tong Construction
Pte Ltd
Dredging at Tanjong Pagar Terminal to
Deepen Berth from -12.0m to -13.6m CDDredging Works $500,000.00
May 2003 ~
Jul 2003PSA Corporation Limited
Yeng Tong Construction
Pte Ltd
PJ057
Reclamation of Jurong Island Phase 4 &
Tuas View Extension - Shore Protection
Works
Shore Protection Works $15,500,581.00 2002 ~ 2005 Jurong Town Corporation
Hyundai Engineering &
Construction Co. Ltd &
Van Oord ACZ Ballast
Ham Rock Joint Venture
Removal of 25 Nos. Mooring Piles From
Sentosa Cove Marina at Sentosa
Removing Steel Piles from
Seabed$39,583.33 Feb 2002
Sentosa Development
Corporation
Yeng Tong Construction
Pte Ltd
Proposed Redevelopment of Changi Point
Ferry Terminal - Dredging Works
Dredging Works and
Breaking underwater Rocks$1,000,000.00 2001 ~ 2002
Urban Redevelopment
Authority
Swee Hong Engineering
Construction Pte Ltd
Maintenance Dredging At Tanjong Pagar
Terminal, Keppel Terminal, Pasir Panjang
Terminal and Pasir Panjang Wharves
Dredging Works $700,000.00Oct 2001 ~
Jan 2002PSA Corporation Limited
Yeng Tong Construction
Pte Ltd
North Eastern Coast Reclamation Phase 4
Area At Punggol And Coney IslandTrimming Seabed to Profiles $125,000.00 Aug 2001 Government of Singapore Jan De Nul (S) Pte Ltd
Reclamation at Changi East - Area 'A'
North - Proposed Soil Improvement
Works at Asian Aerospace Site - Changi
East
Surcharge Removal Works $4,828,570.00 2001 - 2003Building Construction
Authority of Singapore
Hyundai - Koon - Boskalis
Joint Venture
Proposed Additional Changi East
Reclamation (Phase 1C) SingaporeShore Protection Works $750,000.00 May - Dec 2001 Government of Singapore
Hyundai - Koon - Boskalis
Joint Venture
Reclamation at Pulau Ubin and Pulau
Tekong (Part I)
Site Clearence and Removal
of Rock Headlands$1,630,000.00 2001
Housing Development
Board, Singapore
TOA-JDN (PUT) Joint
Venture
Reclamation at Changi East Area "A"
(South) - Surcharge Removal Work in M-
1 Area (SPEC/QS/431/98)
Surcharge Remvoal Work $3,690,000.00 2001 Government of Singapore
Samsung Corporation
(Engineering &
Construction Group)
Proposed Additional Reclamation at
Southern Sentosa Cove
Reclamation / Dredging Soil
Improvement and
Revetment Works
$10,333,000.00 2000 ~ 2001Sentosa Development
Corporation
Yeng Tong Construction
Pte Ltd
Dredging Works at Berth K13-K14
Keppel TerminalDredging Works $68,000.00 1999 ~ 2000
Port of Singapore
Authority
Yeng Tong Construction
Pte Ltd
Proposed Changi East Reclamation (Phase
1C), Singapore
Revetment Construction
Works$26,228,327.00 1997 ~ 1999 Government of Singapore
Hyundai - Koon - Boskalis
Joint Venture
Proposed Design & Construction of Off-
Shore Islets at Siloso Beach, Sentosa,
Singapore
Reclamation / Dredging and
Beach Fromation Works$6,800,000.00 1997 ~ 1998
Sentosa Development
Corporation
Sing Lian Huat-Yeng Tong
Construction Pte Ltd
Construction of Marina Entrance and
Revetment Works, Singapore
Construction of Marina /
Dredging and Shore
Protection Works
$14,870,000.00 1997 ~ 1998Sentosa Development
Corporation
Sing Lian Huat - Yeng
Tong Construction Joint
Venture
Bridge at Marina Bay Project, Singapore Revetment Works $190,055.00 1997 Public Works Department Obayashi Corporation
Proposed Demolition of Existing Ramp
and Construction of Revetment at Tanjong
Beach, Sentosa, Singapore
Construction Ramp
Construction and Revetment
Works
$121,234.00 1995 ~ 1996Sentosa Development
Corporation
Yeng Tong Construction
Pte Ltd
Modification to Shore Protection Works
Adjacent to Ramp at Shell Ferry Terminal,
Pasir Panjang, Singapore
Shore ProtectionWorks $60,000.00 1995Port of Singapore
Authority
Uninec Construction Pte
Ltd
Construction of Dredging Ditch and Slope
Protection Work at Western Catchment
Revervoirs, Singapore
Construction of Concrete
Drains and Slope Protection$350,000.00 1995 ~ 1996 Public Utilities Board
Yeng Tong Construction
Pte Ltd
Repairs to Existing Sunken Rockbunds
and Revetment at Southern Island,
Singapore
Repair and Construct New
Revetment$1,538,501.00 1993 ~ 1994
Sentosa Development
Corporation
Yeng Tong Construction
Pte Ltd
Repairs of Seawall at 30 Bukit Chermin
Road, SingaporeRepair Concrete Seawall $19,000.00 1993
Port of Singapore
Authority
Yeng Tong Construction
Pte Ltd
Reno Matters for Bedok Fifth Subsidiary
Drain, SingaporeConstruction of Drain $40,000.00 1993 Ministry of Environment
Swee Hong Engineering
Construction Pte Ltd
Proposed Revetment for KYC Machine
Industry (S) Pte Ltd, SingaporeRevetment Works $35,000.00 1993
KYC Machine Industry (S)
Pte Ltd
Yeng Tong Construction
Pte Ltd
Proposed Changi East Reclamation (Phase
1A), SingaporeShore Protection Works $37,525,624.60 1992 ~ 1996 Government of Singapore
Obayashi - Toyo Joint
Venture
Reconstruction of Granite - Block Stone &
Drain, SingaporeRubble Stone Drains $25,000.00 1992 Bukit Timah Turf Club
Uninec Construction Pte
Ltd
- Reconstruction of Tanjong Berlayer
Seawall, SingaporeConcrete Seawall $130,108.00 1992 ~ 1993 P. W. D.
Obayashi - Toyo Joint
Venture
Maintenance of Seawall at Raffles
Lighthouse, SingaporeRepair of Revetment $240,000.00 1991 ~ 1992
Port of Singapore
Authority
Uninec Construction Pte
Ltd
Proposed Dredging Work at Tiong Woon
Jetty, SingaporeDredging Works $50,000.00 1991
Tiong Woon Crane &
Transport Pte Ltd
Yeng Tong Construction
Pte Ltd
Proposed Dredging at Selat Samulun,
SingaporeDredging Works $300,000.00 1991 M.O.E. N. C. Senan & Sons Pte Ltd
-Proposed Johor - Singapore Ferry
Terminal, SingaporeDredging Works $500,000.00 1991 ~ 1992 J. K. R. Syarikat Sri Shah Sdn Bhd
Proposed Reconstruction of Outlet Drain
at Pioneer Sector, Singapore
Concrete Outfall Drain
Construction$178,000.00 1991 M.O.E.
Yeng Tong Construction
Pte Ltd
Proposed Extension of Workshop with
Additions and Alternations to Existing
Factory and Office on Plot 3181 Gul
Avenue, Jurong, Singapore
Structural Steel Workshop
Construction$1,250,600.00 1990 ~ 1991 Akitek Yeokhoo Degree Engineering Pte Ltd
Proposed Infrastructural Development at
Pulau Sudong, SingaporeInfrastructure $1,393,000.00 1990 ~ 1991 Mindef RSEA International Pte Ltd
Proposed Part 1 / Part 2 Storey Factory
With Ancillary Facilities on Plot A10593
MK 11 at Kranji Road, Singapore
Concrete / Steel Frame
Building for Factory$600,000.00 1990
Thiong Shen Auto Parts
TradingDegree Engineering Pte Ltd
Proposed Development at Sungei Berih,
SingaporeDredging Works $650,000.00 1990 ~ 1991 Mindef
Yeng Tong Construction
Pte Ltd
Stone Revetments & Seabed Protection
Works for Beach & Lagoon Improvements
for Sentosa, Singapore
Dredging and Revetment
Works$1,109,000.00 1988 ~ 1989
Sentosa Development
Corporation
Van Oord International /
RDC / Antara Koh J.V.
Stone Revetment Works at Penjuru Lane,
SingaporeRevetment Works $45,000.00 1988
Containerisation &
Packaging Industries Pte
Ltd
Koh Brothers Building &
Civil Engineering
Contractor Pte Ltd
Repairs & Pointing to Revetments at
Marina Park, Singapore
Repair & Cement Pointing of
Revetment$288,000.00 1987 ~ 1988 P. W. D.
Yeng Tong Construction
Pte Ltd
Rock Bund Construction for Yishun MRT
Contract 402, SingaporeRock Bund Construction $740,000.00 1986 ~ 1987 MRTC
GTM-SN Coignet
Contractors
* All Amounts are in SGD unless otherwise stated.
TITLEYENG TONG'S SCOPE OF
WORKSCONTRACT VALUE YEAR CLIENT MAIN CONTRACTOR
Proposed Construction and Completion of
Coastal Protection Works at Teluk Lipat,
Dungun, Terengganu Darul Iman
Shore Protection Works RM37,919,100.00July 2012 ~ Jan
2015
East Coast Economic
Region Development
Council (ECERDC)
Pembinaan Yeng Tong Sdn
Bhd
Proposed Construction and Completion of
Coastal Protection Works at Tanjung
Batu, Pekan, Pahang Darul Makmur
Shore Protection Works RM1,832,800.00Aug 2012 ~ Nov
2012
East Coast Economic
Region Development
Council (ECERDC)
Pembinaan Yeng Tong Sdn
Bhd
-
Proposed Widening of the Existing
Penang Bridge Low Level viaduct from
East Abutment to Pier 24E and from Pier
24W to Pier 69W - Optim3B (Marine)
Bored pile and pile cap
worksRM90,235,982.00
Feb 2007 ~
Mar 2009Penang Bridge Sdn Bhd
UEM Construction Sdn
Bhd & Biaxis Sdn Bhd
-
Cadangan Pembinaan Pelabuhan Tanjung
Pelepas Fasa 3 - The Construction,
completion and Maintenance of Wharves
Structures at Berth 9 & 10
Dredging and Arnour Rock
ProtectionRM9,386,500.00
May 2005 ~
May 2006
Tanjung Pelepas Port
Authority, Johor
Zelan Construction Sdn
Bhd & Omni-Kwang JV
-
Dredging and Armour Rock Works to
C.W Outfall and C.W Intake for Power
Plant at Tanjung Bin, Johor
Dredging and Arnour Rock
ProtectionRM9,095,030.00
Mar 2005 ~
Jun 2005
Tanjung Bin Power Plant
Sdn Bhd
Zelan Construction Sdn
Bhd & Omni-Kwang JV
-Cadangan Pembangunan Pelabuhan
Tanjung Pelepas - Phase IIRock Revetment Work RM34,000,000.00
Oct 2003 ~
Jun 2004
Tanjung Pelepas Port
Authority, JohorInai Kiara Sdn Bhd
Construction & Completion of Jetties,
Breakwater, Groyne, Dredging, Beach
Reclamation and Associated Marine
Works at Tanjong Leman & Pulau Sibu
Tengah, Mersing, Johor
Construction of Jetties,
Breakwater Groyne,
Dredging and Reclamation
RM8,800,000.00 1996 ~ 1997Kumpulan Penambang
(Johor) Sdn Bhd
Tidalmarine Engineering
Sdn Bhd
CONTRACTS EXECUTED BY YTC ( IN MALAYSIA )
Proposed North Butterworth Container
Terminal, MalaysiaShore Protection Works RM10,502,175.00 1992
Penang Port
CommissionerIJM Corporation Bhd
* All Amounts are in SGD unless otherwise stated.
TITLEYENG TONG'S SCOPE OF
WORKSCONTRACT VALUE YEAR CLIENT MAIN CONTRACTOR
-Shuaibah Phase III IWPP Desalination
Plant (Civil Offshore Works)
Shoreline Protection and
Offshore WorksRM25,700,420.00
Oct 2006 ~
Nov 2007
Shuaibah Water and
Electricity Company
Zelan Construction Arabia
Co. Ltd & Pembinaan Yeng
Tong Sdn Bhd JV
Seabed Preparation Pipeline Installation
and Rock Armour Protection Works in
Indonesian Waters
Reinstating Seabed and
Filling Trench over Gas
Pipeline
$220,000.00Jun 2003 ~
Aug 2003
PT. Perusahaan Gas
NegaraBoskalis-Idors J.O.
PJ066
PGN Offshore Pipeline Project at Kuala
Tunkal, Sumatra & Batam Island in
Indonesia
Placing Rock on Gas Pipeline
in Seabed$1,423,015.00
Jun 2003 ~
Jul 2003
PT. Perusahaan Gas
Negara
Hyundai Heavy Industries
Co. Ltd
J130 - Seraya Project 2 (Civil Works For
Non-Revamp Area)
Shore Protection Works For
Cooling Water Outfall
Station
$420,000.00 2001 Ellba Eastern (Shell) Gammon Pte Ltd
Redevelopment of Colombo Port, Sri
Lanka Dredging Works $2,200,000.00 1999 ~ 2001 Government of Sri Lanka
Hyundai Engineering and
Construction Limited
- Subcontract for Rubble/Revetment
Wall ConstructionRubble / Revetment Wall $288,000.00 1991 P. W. D.
Obayashi - Toyo Joint
Venture
PJ063Powergas / PMG Submarine Gas Pipeline
Project at Pulau Sakra, BruneiReinstatement of Revetment $321,000.00
Apr 2003 ~
Jun 2003Powergas Ltd JDN - Boskalis JV
Removal and Reinstallation Of Revetment
At Pulau Sakra Landfall East And West
Natuna Pipeline, Brunei
Removal and Reinstallation
of Revetment$332,839.00
Jun 2002 ~
Aug 2002Powergas Ltd
Jan De Nul - Boskalis Joint
Venture
CONTRACTS EXECUTED BY YTC (Other Countries ) Indonesia, Brunei, Sri Lanka
Construction of Two Breakwaters and
Other Facilities at Jerudong Beach, Brunei
Breakwater Construction
WorksB$ 78,395,028.00 1997 ~ 1998
Amedeo Development
Corporation Sdn Bhd
Hyundai Engineering &
Construction Co. Ltd
Control of Beach Erosion of Coastline of
Berakas Camp Coastline Protection -
Brunei Darussalam.
Shore Protection Works B$ 6,500,000.00 1994 ~ 1995 Government of Singapore Daito Kogyo Co Ltd
-Shore Protection Works at Pantai Mentiri
Gold Course, BruneiShore Protection Works B$ 2,700,000.00 1989 ~ 1990 P. W. D. (Brunei) Ted Sdn Bhd
Upgrading of Western Trainning Wall at
Muara, Brunei
Construction of Conrete
SeawallB$ 176,000.00 1989 P. W. D. (Brunei) Daito Kogyo Co Ltd
Headlands Construction at Eastern End of
Pelompong Spit, Brunei
Granite Headland
ConstructionB$ 2,100,000.00 1987 ~ 1988 P. W. D. (Brunei) Daito Kogyo Co Ltd
-
Rock Bund Construction for Dredging
and Reclamation Works at Muara
Harbour, Brunei
Rock Bund Construction B$ 500,000.00 1986 ~ 1987 P. W. D. (Brunei) Daito Kogyo Co Ltd
Shore Protection Works for Fish Landing
Complex at Muara, BruneiShore Protection Works B$ 70,000.00 1986 P. W. D. (Brunei)
San Hin Welding &
Construction
Shore Protection Works for Reclamation
of Terumbu Pesek, BruneiShore Protection Works B$ 500,000.00 1985 Jurong Town Council Boka-Ballast
Shore Protection Works for Reclamation
of Pulau Sakra, BruneiShore Protection Works B$ 2,200,000.00 1984 ~ 1985 Jurong Town Council Boka - Ballast
Shore Protection Works for Reclamation
of Pulau Busing, BruneiShore Protection Works B$ 1,800,000.00 1983 ~ 1984 Jurong Town Corporation Boka - Ballast
Headland Construction at Pelompong
Spit, BruneiHeadland Construction B$ 1,500,000.00 1982 P.W. D. (Brunei) Daito Kogyo Co Ltd