Transcript
Page 1: Corporate Presentation CPFL Energia

São Paulo, 07 de março de 2012April 2014

Corporate Presentation

Page 2: Corporate Presentation CPFL Energia

2 Distribution

3 Generation

Competitive Power Supply and Services4

1 Corporate Overview

Agenda

Consolidated financial figures5

2

6 The Electric Sector

Page 3: Corporate Presentation CPFL Energia

2 Distribution

3 Generation

Competitive Power Supply and Services4

1 Corporate Overview

Agenda

Consolidated financial figures5

3

6 The Electric Sector

Page 4: Corporate Presentation CPFL Energia

4

• Largest private player in the Brazilian electricity sector

• Market cap of ≈ R$18 billion1, listed on BM&FBovespa Novo Mercado and on NYSE (ADR Level III)

• 2013 Adj. EBITDA2 of R$ 4.2 billion and Adj. Net Income2 of R$ 1.4 billion

• Differentiated Dividend Policy: >50% of net income, semi-annually. Payout ratio of ≈95% since IPO in 2004

• Presence concentrated in the most developed regions of Brazil

• Leadership in Distribution through 8 subsidiaries

• 2nd largest private Generator with an equivalent stake of 3,067 MW of installed capacity, more than 94% from renewable sources

• Leadership in Renewable Energy in Brazil

• 2nd largest player in Competitive Power Supply and a world-class provider of Value-Added Services1) On Mar 28, 2014; 2) IFRS (+) proportionate consolidation of minorities’ stakes at gencos (+) regulatory assets & liabilities (-)

non-recurring items.

Corporate overview – Highlights

Page 5: Corporate Presentation CPFL Energia

551) Termoparaíba and Termonordeste thermal power facilities; 2) CPFL Energia has a 58.8% indirect interest in CPFL Renováveis through CPFL Geração.

Free Float

DIS

TR

IBU

TIO

N

100%

100%

100%

100%

100%

100%

100%

100%

65%

25.01%

48.72%

52.75%

51%

GEN

ER

ATIO

N

100%

100%

99.95%

100%

CO

MM

ER

CIA

LIZ

ATIO

N100%

100%

REN

EW

AB

LES

59.93%

Investco5.94%

SER

VIC

ES 100%

100%

100%

58.8%2

100%

15.1% 30.5%

Nect Serviços100%

1

Corporate structure

24.4% 30.0%

Page 6: Corporate Presentation CPFL Energia

• Shares listed in differentiated segments:• BM&FBovespa Novo Mercado• NYSE (ADR Level III)

• Compliant with the Sarbanes-Oxley Act

• Board of Directors composed by 7 members:• 1 Independent Member• Advised by 3 Committees

• Self-Assessment for Board of Directors and Fiscal Council

• Enforcement of policies for disclosure of information and for prevention of insider trading by employees

• Dividend Policy:• Minimum of 50% of net income, semi-annually

World-Class Corporate Governance Practices

66

Corporate governance

Page 7: Corporate Presentation CPFL Energia

HPP Foz do Chapecó

HPP Barra Grande

HPP Castro Alves

HPP Monte Claro

HPP 14 de Julho

HPP Campos Novos

HPP Luis Eduardo

Magalhães

CPFL Piratining

a

HPPSerra da Mesa1

CPFLPaulista

RGE

19 SHPPs (CPFL

Renováveis)

1 TPP (Carioba)

CPFL Santa Cruz

CPFL Jaguari

CPFL Sul Paulista

CPFL Leste Paulista

CPFL Mococa

SHPP Rio do Peixe (I/II)

SHPP Macaco Branco

203620352032202820272015 …

CPFL Energia requested Aneel to renew the

expiring concessions

~3%CPFL

Energia's EBITDA

<1% CPFL

Energia's installed capacity

7

CPFL Energia enjoys long term concessions

1) Furnas has the concession for HPP Serra da Mesa. CPFL has the contractual right of 51.54% of the plant’s assured energy, according to the 30-year leasing contract, maturing in 2028.

DistributionGeneration

Page 8: Corporate Presentation CPFL Energia

3rd Tariff Review Cycle

CPFL Piratininga Oct-122

CPFL Santa Cruz

Feb-132

CPFL Leste Paulista

CPFL Jaguari

CPFL Sul Paulista

CPFL Mococa

CPFL Paulista Apr-13

RGE Jun-13

8

CPFL Energia – 2013 Adj. EBITDA Breakdown¹ | R$ million

CPFL Santa Cruz

CPFL Leste Paulista

CPFL JaguariCPFL Sul Paulista

CPFL Mococa

1) Adjusted by regulatory assets & liabilities and non-recurring items; does not consider the holding company; 2) 12 months retroactive effect; 3) Commercialization in the free market and Services

55%

16%

6%

23%

8

AlternativeEnergy

738

Conventional

1,271

CPFL Paulista

RGE

CPFL Piratininga

Competitive Supply and Services3

74

Generation2,008

CPFL Energia - Consolidated1 | 4,225

Distribution2,211

63%

37%

51%

47%

2%

Generation Segment

Distribution Segment

CPFL Energia | EBITDA breakdown

Page 9: Corporate Presentation CPFL Energia

9

Leadership among private companies in the electric sector,with a diversified portfolio in different businesses related to

Energy

99

COMPETITIVE SUPPLY

• Leadership in commercialization in the free market

• Maximization of profitability, through a best-in-class set of solutions

GENERATION

• Operational Excellence, presenting the highest margins of the sector

• Expansion of installed capacity in hydro and thermal with attractive returns

• Leadership in renewable sources (> 4 GW by 2020)

DISTRIBUTION

• Market leader, doubling the market share in Brazil

• Operational excellence through innovation and new technologies (smart grid)

SERVICES

• Largest services company in the power sector

• Strong growth of sales

CPFL Energia’s ambitions

Page 10: Corporate Presentation CPFL Energia

2 Distribution

3 Generation

Competitive Power Supply and Services4

1 Corporate Overview

Agenda

Consolidated financial figures5

10

6 The Electric Sector

Page 11: Corporate Presentation CPFL Energia

2009 2010 2011 2012 2013

6,568.0006,750.000

6,954.0007,176.000

7,386.705

Distribution Segment

• 7.4 million customers

• 569 municipalities

• Footprint: most developed regions

• High potential in per capita consumption

1º1º

Distribution LeaderMarket share: 13% Sales in the Concession Area (TWh)1

Industrial

Commercial

Residential

Others

Sales Breakdown | 2013

4.8 4.7

4.1 4.6

5.4 5.4

1) Excluding sales at CCEE; 2) Source: EPE.

Number of Consumers | # Thousands

11

Sales CAGR - by Region2 |2009 - 2013

2009 2010 2011 2012 2013

37,821.0 39,250.0 39,917.0 40,683.0 41,148.4

10,978.013,138.0 14,674.0 15,999.1 17,314.4

Captive TUSD

52.448.8

56.7 58.5

CAGR 2008-133.6%

54.6

26% 43%

16%14%

Page 12: Corporate Presentation CPFL Energia

Brazilian economy and market performance

Real wage bill1 and CPFL’s residential consumption | %YoY growth

2006 2007 2008 2009 2010 2011 2012 2013

5.9 5.9 6.1

3.9

7.3

4.5

6.6

2.9

4.5

6.9 6.86.0

5.2 4.9

6.95.9

Real wage bill

Retail sales2 and CPFL’s commercial consumption3 | %YoY growth

2006 2007 2008 2009 2010 2011 2012 2013

6.2

9.7 9.1

5.9

10.9

6.78.5

5.45.57.7

5.6 5.2 6.0 6.6 6.8

3.6

Industrial production2 and CPFL’s industrial consumption3 | %YoY growth

2006 2007 2008 2009 2010 2011 2012 2013

2.86.0

3.1

-7.4

10.5

0.4

-2.7 -3.0

3.36.1

2.9

-6.7

9.3

3.90.7 2.0

Industrial production

1) Source: IBGE/LCA. 2) Source: IBGE. 3) Take into account changes in billing calendar for free consumers.

Other variables influencing energy consumption

• Population growth• Migration• Credit• Household appliances • Temperature• Rainfalls• Public investments

12

Page 13: Corporate Presentation CPFL Energia

Southeast:CPFL Paulista, CPFL Piratininga, CPFL Santa Cruz,

CPFL Leste Paulista, CPFL Jaguari, CPFL Sul Paulista,

CPFL Mococa

South: RGE

Footprint in the most developed regions of Brazil

131313

Distribution business

• 8 distribution companies;• 13% of market share;• 7.4 million customers;• 569 municipalities;• 2013 sales of 58,462 GWh | 04-13 CAGR of 5.4%

Leadership in the distribution segment

2006 20071912

Discos’ Acquisitions | Key dates

1997-2001

Start Up

1

1

1) Acquired by VBC (one of CPFL Paulista’s controlling shareholder at the time) and PSEG in 1997, during the privatization process, and incorporated by CPFL Energia in 2001 (67,03%). In 2006, CPFL Energia acquired the additional stake (32.67%).

Page 14: Corporate Presentation CPFL Energia

Ele

trop

au

lo

CPFL

Pir

ati

nin

ga

CPFL

Pau

lista

CPFL

Moco

ca

Ele

ktr

o

Coelc

e

CPFL

Lest

e P

au

l...

Ban

deir

an

te

Esc

els

a

Cem

ig

CPFL

Jag

uari

CPFL

Su

l Pau

lista

CPFL

San

ta C

ruz

Celp

e

Lig

ht

Cose

rn

Coelb

a

RG

E

Am

pla

Cele

sc

Cem

ar

CEEE

4.2 4.6 4.7 4.7 5.3 5.4 5.7 5.8 6.0 6.4 6.6 7.0 7.98.1 8.4 8.9 8.9 9.0 9.110.911.8

13.0

CPFL

Moco

ca

CPFL

Lest

e P

au

l...

CPFL

San

ta C

ruz

CPFL

Pau

lista

CPFL

Pir

ati

nin

ga

CPFL

Jag

uari

Ele

trop

au

lo

Ban

deir

an

te

Ele

ktr

o

CPFL

Su

l Pau

lista

Coelc

e

Esc

els

a

Cem

ig

Cose

rn

Cele

sc

RG

E

Lig

ht

Cem

ar

Am

pla

Celp

e

Coelb

a

CEEE

4.55.3 5.7 5.8 7.5 8.1 8.3 8.4 9.4 9.8 9.910.814.514.6

14.716.516.918.219.3

19.420.021.6

14

Avg. Frequency of Power Outages per Consumer per Year – FEC2013 (# occurrences)

Avg. Length of Power Outages per Consumer per Year - DEC2013 (hours)

Distribution: best-in-class operational efficiency

Page 15: Corporate Presentation CPFL Energia

Zero-Base Budget

Inefficiencies from past budgets are not carried over to the next periods

Tauron Program

Introduction of the smart grid technology in the distribution network

Corporate Services Center

Implementation of a back-office services provider to increase

operating productivity and efficiency

Corporate Level

• Optimization of inspections (loss prevention), process review, and improvement in assertiveness: reduction of ≈17%

• Metering and delivery of bills - online billing (email), changes in layout/type of paper, alignment of bank fees for all Discos: reduction of ≈11%

Operational Level

Value Initiatives

• Reduction of consulting services and “insourcing” of activities: reduction of ≈47%

• Standardization of outsourced labor: reduction of ≈52%

• Improved management of travel expenses: reduction of ≈18%

• Consumption of paper and office supplies: reduction of ≈66%

15

Cost-cutting Initiatives

Cost-cutting Initiatives Total (2015 x 2011): ≈R$ 320 million

Cost-cutting already performed (2013 x 2011)1: ≈R$ 236 million

1) Constant value of Dec/13.

Page 16: Corporate Presentation CPFL Energia

EBITDA acumulado até setembro: R$ 24 milhões16

• Automated dispatch + tablets deployed in ~35% of all teams (RGE and CPFL Piratininga)

• 15,556 smart meters already installed as of Mar-14 (62%) – (Target: 25,000 large consumers)

• Implementation of RF Mesh Telecom Network already concludedEBITDA 2013: R$ 52,4 million

Achievements

Telemetering – Large Consumers

• Real-time consumption readings

• Analysis of consumer load curve

• Real-time fraud detection

• Real-time power outage detection

Mobile Workforce Management

Optimized logistics for field teams (georeferenced maps)

• Faster power restoration

• Savings with optimized routes

Tablets for real-time communication

• Dynamic dispatch of teams

• Automated routing of teams

• On-line update of field services’ progress

Projeto Tauron – smart grid

Page 17: Corporate Presentation CPFL Energia

Distribution | Key financial figures

Net revenues1 – Adjusted2

EBITDA – Adjusted2 Net income – Adjusted2

2010 2011 2012 2013

9,432 9,794 10,830 10,716

2010 2011 2012 2013

2,267 2,351 2,655

2,236

2010 2011 2012 2013

1,309 1,235

1,356

1,068

1) Excludes construction revenue; 2) Adjusted by non-recurring items and regulatory assets & liabilities.

CAGR = +4.3%-1.0%

CAGR = -0.5%-15.8%

CAGR = -6.6% -21.2%

Sales in the Captive Market (TWh)

2010 2011 2012 2013

39.3

39.9

40.741.1

+1.1%CAGR = +1.6%

17

Page 18: Corporate Presentation CPFL Energia

2 Distribution

3 Generation

Competitive Power Supply and Services4

1 Corporate Overview

Agenda

Consolidated financial figures5

18

6 The Electric Sector

Page 19: Corporate Presentation CPFL Energia

• Long Term Concessions

• Brazil’s largest Portfolio in Alternative Energy

• Renewable Sources: higher than 93%

2º2º

2nd Largest Private Generation Company

Market share: 2.3%

Hydro power 60%

Thermal6%

SHPP7%

Wind20%

Biomass7%

Solar0%

Portfolio by source – 2018(e)

34%

Generation Segment

1) Considering 58.8% stake at CPFL Renováveis, since its creation.

Installed Capacity1 (MW) | Estimated growth

CAGR 2000-18e = 19% a.a.

Semesa Baesa

Enercan Ceran

Foz Chapecó

EpasaBaldin

Creation ofCPFL

Renováveis

19

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014(e)

2015(e)

2016(e)

2017(e)

2018(e)

2019(e)

- 657 657 657 657 660 747 751 931 1,047 1,055 1,055

-

143

801 812 812 854 915 1,072

1,5881,7041,7372,203

2,6172,9122,9883,1133,1133,2623,2623,292

0

Privatization assets Brownfield

Page 20: Corporate Presentation CPFL Energia

Serra da Mesa

Monte Claro

Barra Grande

CamposNovos Lajeado Castro

Alves 14 de Julho

Foz do Chapecó Epasa

Commercial Startup

1998 2004 2005 2007 2007 2008 2008 2010 2010-11

Installed Capacity(MW)

1,275.0 130.0 690.0 880.0 902.5 130.0 100.0 855.0 341.6

Assured Energy (MWavg)

671.0 59.0 380.6 377.9 526.6 64.0 50.0 432.0 247.6

CPFL Stake 51.54% 65.00% 25.01% 48.72% 6.93% 65.00% 65.00% 51.00% 52.75%

Installed Capacity CPFL (MW)

657.1 84.5 172.5 428.7 62.5 84.5 65.0 436.1 180.2

Assured Energy CPFL (MWavg)

345.8 38.4 95.2 184.1 36.5 41.6 32.5 220.3 130.6

Flooded area (km2)

1.784 1.4 95.0 32.9 630 5.0 5.0 80.0 -

(MW/km2) 0.7 92.9 7.3 26.7 1.4 26.0 20.0 10.7 -

Concession terms 2028 2036 2036 2035 2032 2036 2036 2036 2042

Conventional generation | 2,234 MW1 of installed capacity

CPFL Energia’s power plants – state-of-the-art environmental efficiency

201) Equivalent stake, including 38MW of small plants at CPFL Geração and 24MW of SHPP embedded in the distribution companies.

Page 22: Corporate Presentation CPFL Energia

DESA is one of the main independent renewable energy companies in Brazil,with total contracted capacity of 331 MW

CPFL Renováveis | Partnership with Dobrevê Energia

22

3

2

5

1

4

1) DESA holds 60% of SHPP Ludesa. 2) The PPAs are based on January 2014 (average values when there is more than one PPA). 3) On December 31, 2013, DESA presented a consolidated net debt of R$ 656 million (preliminary value, subject to audit and, therefore, eventual changes) to be added after December 31, 2013 in approximately R$ 200 million.

Commercial Start Up

Installed capacity

Capacity factor

PPA2

R$/MWh

1 SHPP Ludesa(1)

São Domingos (SC) Jul-07 30.0 MW 70.7% 202

2 SHPP FigueirópolisIndiavaí (MT) Nov-10 19.4 MW 64.9% 201

3 SHPP Novo HorizonteCampina Grande (PR)

Jun-11 23.0 MW 45.2% 136

4 Morro dos VentosJoão Câmara (RN) Jul-12 145.2 MW 45.5% 186

4 EurusJoão Câmara (RN) Sep-13 60.0 MW 49.2% 150

4 Morro dos Ventos IIJoão Câmara (RN)

1Q16 29.2 MW 51.8% 124

5 SHPP Mata VelhaUnaí (MG) 2Q16 24.0 MW 52.1% 131Portfolio of Projects in the Partnership

(MW)Operation Construction  Total

CPFL Renováveis 1,416.8 383.5 1,800.3

DESA 277.6 53.2 330.8

CPFL Renováveis After-Partnership 1,694.4 436.7 2,131.1

SHPPWind

Hydro

Wind

Biomass

Solar

Page 23: Corporate Presentation CPFL Energia

CPFL Renováveis | Corporate structure after the joint venture

5.61% 5.49% 7.12% 2.97% 1.93% 1.47%58.84% 9.32%

Market

7.24% 0.00%

4.90% 4.80% 6.22% 2.59% 1.68% 1.29%51.41% 8.14%

Market

6.33% 12.63%(1)

(ARROW)

(ARROW)

(2)

(2)

1) Shareholders’ stake may suffer adjustments arising from the due diligence. 2) Through CPFL Geração.

Pre-operation

Post-operation

23

Page 24: Corporate Presentation CPFL Energia

242424

• Selective high quality project development• Wind projects certified by industry leaders• Backed by high quality equipment suppliers• Long term O&M contracts• Energy generation monitoring and optimization

High Quality Development, Construction and Operation

Complementarity of Sources Mitigating Risks

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecWind (Generation - MWavg)Reservoir Storage

• Reservoir storage at high levels in the first semester while wind energy generation is concentrated in the second semester of the year

CPFL Renováveis benefits from the complementarity of sources

Wind PortfolioAttractive location

due to high wind speeds

SHPP PortfolioExposure to

abundant hydro resources

Installed Capacity1

Total: 1,800 MW

Solar

18%

61%

21%0%

SHPP

Wind

Biomass Solar

Operating:

HydroWind

Biomass

Under Construction:HydroWind SHPP Potential (Southeast and Midwest Regions)

Wind Potential (Northeast and South Regions)

Biomass Portfolio

Proximity to sugarcane production centers

Biomass

Region MW

NE 1,023

CW/SE 506

SO 271

Rese

rvoir

Sto

rag

e

(%)

Win

d G

en

era

tion

MW

Diversified and high quality portfolio, delivering superior performance, mitigating risks, ensuring reliable load factors and providing capacity to grow

with different sources

CPFL Renováveis | High quality and diversified portfolio

1) To be fully operational by 2018

Page 25: Corporate Presentation CPFL Energia

25

Technology Has Shown Great Improvements in Recent Years | Recently developed technology for wind power plants allows greater load factors

Europe United States Brazil (NE)

Area89%

Area95%

Fre

qu

en

cy

Wind Speed (m/s)

Fre

qu

en

cy

Wind Speed (m/s)

Fre

qu

en

cy

Wind Speed (m/s)Ideal Wind Speed

Ideal Wind Speed

Area99%

Ideal Wind Speed

1.500kW

1.800kW80m

3.000kW

100m

70m

750kW50m

30m

300kW

75kW

17m

1980 -1990

1990 -1995

1995 -2000

2000 -2005

2000 -2005

20100

20

40

60

80

100

120

140

160

180

Rotor Diameter (m) Rating (kW)

Alt

ura

(m)

1.500kW

1.800kW80m

3.000kW

100m

70m

750kW50m

30m

300kW

75kW

17m

1980 -1990

1990 -1995

1995 -2000

2000 -2005

2000 -2005

20100

20

40

60

80

100

120

140

160

180

Rotor Diameter (m) Rating (kW)

Alt

ura

(m)

BrazilEurope and EUA

Improved availabilit

y

Greater efficiency

Reduced generation losses

Wind Features in Brazil are the Most Adequate for Power Generation | The average wind in Brazil (Northeast) has a similar intensity with less variability

CPFL Renováveis | Unparalleled wind conditions combined with top technology

Page 26: Corporate Presentation CPFL Energia

26

Operating (Mar-14)

Under

construction

End of2018

Under development

Total Portfolio

100% with PPA

1,800

5,567

PossibleProbableHighly Confident

3,767

Small Hydro

• 35 operating: 327MW

• Under construction: -

• Under development: 626MW

Total: 953MW

Biomass

• 8 operating: 370MW

• Under construction: -

• Under development: -

Total: 370MW

• 22 operating: 719MW

• 15 under construction: 384MW

• Under development: 3,141MWTotal: 4,244MW

Wind

• 66 operating: 1,417MW1

• 15 under construction: 384MW

• Under development: 3,767MWTotal: 5,567MW1

Total

1) Including Tanquinho solar power plant – 1MWp of installed capacity

1,417

WindSHPP – Small HydroBiomass

384

2,214

1,077

476

4,244

953

370

719

370327

1,103

370327

CPFL Renováveis | Installed capacity (MW)

Page 27: Corporate Presentation CPFL Energia

Commercial start-up / Acquisition

Installed Capacity (MW)

Assured Energy (MWavg)

PPA Comments

CPFL Renováveis (Aug-11)

652 314

Bio Ipê TPP 2Q12 25 8 Free market -

Bio Pedra TPP 2Q12 70 24Reserve auction(R$170.91/MWh)

Revenue(e): R$ 20 million/year

Bons Ventos Wind Farms 2Q12 158 63PROINFA (R$ 331.11/MWh)

Acquisition price: R$ 1,062 million

Santa Clara Wind Farms 3Q12 188 76Reserve auction(R$ 184.71/MWh)

Revenue(e): R$ 115 million/year

Ester TPP 4Q12 40 11Alt. sources auction (64%) and free market (36%)

Acquisition price: R$ 111.5 million

Tanquinho Solar PP 4Q12 1 1 Free market -

Salto Góes SHPP 4Q12 20 11Alternative sources auction (R$176.71/MWh)

Revenue(e): R$ 112 million/year

TPP Coopcana 3Q13 50 18 Free marketRevenue(e): R$ 22.6 million/year

Campo dos Ventos II Wind Farm 4Q13 30 15Reserve auction(R$ 151,21/MWh)

Revenue(e): R$ 18.5 million/year

TPP Alvorada 4Q13 50 18 Free marketRevenue(e): R$ 22.6 million/year

Rosa dos Ventos Wind Farms 1Q14 14 5PROINFA (R$ 338.41/MWh)

Acquisition price: R$ 103.4 million

Atlântica Wind Farms 1Q14 120 53Alternative sources auction (R$154.81/MWh)

Revenue(e): R$ 76.7 million/year

Current portfolio (Mar-14)

1,417 617

1) Constant currency (Dec-13)27

CPFL Renováveis | Track record

Page 28: Corporate Presentation CPFL Energia

1) Macacos, Pedra Preta, Costa Branca and Juremas; 2) Campo dos Ventos I, III, V; 3) Ventos de São Benedito, Ventos de Santo Dimas, Santa Mônica, Santa Úrsula São Domingos and Ventos de São Martinho; 4) Pedra Cheirosa I and II; 5) Considering the start-up of the first farm in the complex; 6) Projects with energy sold to the free market in the long term, with contract for the supply of equipment and awaiting connection definition to start construction. 7) Constant currency (Dec/13).

28

Commercial start-up (e)

Installed capacity (MW)

Assured Energy (MWavg)

PPA Status

Macacos I Wind Farms1 2Q145 78.2 37.5

R$ 160.17

20 years

Final stages of assembly (20 wind turbines and 14 towers assembled)

Campo dos Ventos Wind Farms2,6

1H16 82.0 40.2ACL19 years

Contract to supply wind turbines signed; executive projects in progress

São Benedito Wind Farms3,6 2H16 172.0 89.0

ACL19 years

Contract to supply wind turbines signed; executive projects in progress

Pedra Cheirosa Wind Farms4 1Q18 51.3 26.1

A-5 2013

Negotiation of wind turbines supply in progress

Commercial start-up 2013-2018(e) | 384 MW / 193 MWaverage

Complexo Macacos I

CPFL Renováveis | Power plants under construction

Page 29: Corporate Presentation CPFL Energia

Conventional and Alternative Energy | Key financial figures

Net Revenues (R$ million) - Adjusted1 EBITDA (R$ million) - Adjusted1

Net Income (R$ million) - Adjusted1

1) Adjusted by proportional consolidation and non-recurring items.

2010 2011 2012 2013

1,1211,520

2,350

2,817CAGR 2010-13 = +35.9%

+19.9%

2010 2011 2012 2013

810

1,181

1,6721,907CAGR 2010-13 = +33.0%

+14.0%

2010 2011 2012 2013

262

778

384 410

+6.7%

EBITDA Margin - Adjusted1

2010 2011 2012 2013

72.3%77.7%

71.2% 67.7%

29

CAGR 2010-13 = +16.1%

Page 30: Corporate Presentation CPFL Energia

2 Distribution

3 Generation

Competitive Power Supply and Services4

1 Corporate Overview

Agenda

Consolidated financial figures5

30

6 The Electric Sector

Page 31: Corporate Presentation CPFL Energia

Competitive power supply| Regulated vs. free market

  Regulated market Free market

Energy supplier No choice - distribution company Free choice

Tariff of the use of distribution system (TUSD) Distribution company Distribution company

Energy prices Regulated by ANEEL Free negotiation

Consumer Capacity Connection date Voltage Energy source

Free > 3,000 kW

after July, 1995 any any

before July, 1995> 69 kV any

< 69 kV incentivized

Special500-3,000 kW - Group A incentivized

units totaling 500 kW - Group A incentivized

31 1) Source: EPE (full year 2013)

Main differences

Advantages

Who can join

Lower prices

Free choice from energy supplier

Better predictability of energy expenses

Customization according to consumer

seasonality

27%

73%

Free Market1

Regulated Market

Page 32: Corporate Presentation CPFL Energia

• 284 free consumers

• Nationwide outreach

• Value-added product portfolio

• Synergy with CPFL Renováveis

Number of Consumers (#) | CPFL Brasil

1º1º Market share: 9%

2008 2009 2010 2011 2012 2013

80 74

129 141

231

284CAGR = 30%

Portfolio (Free Consumers)

179

52

Inside the concession area

Outside the concession

area

Current: 11.5 GW avgPotential: +7.1 GW avg

Free Market in Brazil

210

74

Competitive power supply

32

• CPFL Brasil was the winner of Exame Magazine’s 2013 Best and Largest Companies (category Energy)

• The Company was selected among gencos, discos, transcos and other players in the electric sector throughout Brazil2010 | 2011 | 2013

2nd Largest Player

Page 33: Corporate Presentation CPFL Energia

33

Dec/09 Dec/10 Dec/11 Dec/12 Dec/13

221

221 587

985 1,142

Dec/09 Dec/10 Dec/11 Dec/12 Dec/13

445 485 514 592 613

Current: 9.6 GWavgPotential: +2.1 GWavg

Current: 1.9 GWavgPotential: +5.0 GWavg

Competitive advantages of CPFL: market leadership, expertise and synergies with CPFL Renováveis

Source: ANEEL and CCEE

# of competitive customers – larger than 3 MW

# of special customers – from 0.5 to 3 MW

Number of free clients in Brazil

CAGR=8.3% CAGR=50.8%

Competitive power supply | Opportunities

Page 34: Corporate Presentation CPFL Energia

Transmission networks

Self-generation networks

Distributionnetworks

Recovery of equipment

Services Segment | CPFL Serviços

34

• Foundation: 2006

• Core Business: offers a wide range of value-added services, ranging from engineering projects to maintenance and recovery of equipment. These services are designed to help consumers improve the efficiency, cost and reliability of their electric equipment

• Type of services: construction of transmission and distribution networks; maintenance and recovery of equipment; self-generation networks (cogeneration, energy-efficiency projects and distributed generation arrays – solar energy)

Page 35: Corporate Presentation CPFL Energia

Services Segment | CPFL Total and CPFL Atende

35

• CPFL Total offers collection services with an established authorized network; capacity to collect utility bills, such as water, energy, telephone, and cable TV.

• Capability of cross-sale with other service providers, enabling the collection via energy bills.

• Foundation: 2008

• Core Business: provider of contact center and customer relationship services to other utility companies

• Services: face-to-face attendance, back-office, credit recovery, toll-free customer support, ombudsman, service desk and sales

Page 36: Corporate Presentation CPFL Energia

Net revenues EBITDA Net income

2010 2011 2012 2013

1,909

1,699

2,031 2,031

2010 2011 2012 2013

303278 287

74

2010 2011 2012 2013

201

164

127

52

Competitive power supply and Services | Financials1

1) Pro forma36

Page 37: Corporate Presentation CPFL Energia

2 Distribution

3 Generation

Competitive Power Supply and Services4

1 Corporate Overview

Agenda

Consolidated financial figures5

37

6 The Electric Sector

Page 38: Corporate Presentation CPFL Energia

38

2009 2010 2011 2012 2013

10,566 10,962 11,47613,487 14,009

CPFL Energia | Key financial figures – Sales

381) Disregarding CCEE and intercompany sales. 2) 100% - IFRS criteria. 3) Incl. provision adjustments of 88 GWh in 9M12 and equivalent stakes at Foz do Chapecó, Baesa, Enercan and Epasa. 4) Take into account changes in billing calendar for permissionaires in RGE in 2Q12. 5) Adjusted by generation proportionate consolidation (IFRS 11), regulatory assets & liabilities, non-recurring items and ex-construction revenues.

Net revenues (R$ million) – adjusted5

CAGR 2009-13

7.3%

3.9%

37,821 39,250 39,917 40,683 41,148

13,269 13,132 12,489 14,278 15,205

445.752 2,167 3,501

51,090 52,382 52,85157,128 59,854

Total energy sales1 (GWh)

CAGR 2009-13

4.0%

4.8%

CPFL Renováveis2 Commercialization + Conventional generation3

Captive market4

20132012201120102009

Page 39: Corporate Presentation CPFL Energia

2009 2010 2011 2012 2013

2,7623,320

3,770

4,6054,225

2009 2010 2011 2012 2013

1,2861,544 1,560 1,645

1,358

CPFL Energia | Key financial figures EBITDA and net income

EBITDA (R$ million) | Adjusted1

Net Income (R$ million) | Adjusted1

1) Adjusted by generation proportionate consolidation (IFRS 11), regulatory assets & liabilities and non-recurring items39

26.1%

30.3%

32.9%

34.1%

30.2%

11.7%

14.6%

13.6%

12.5% 10.1

%

EBITDA

EBITDA Margin

Net Income

Net Margin

-8.3%

-17.4%

CAGR 2009-13

11.2%

CAGR 2009-13

1.4%

Page 40: Corporate Presentation CPFL Energia

40

CPFL Energia | Key financial figures – Dividends

2S04

1H05

2H05

1H06

2H06

1H07

2H07

1H08

2H08

1H09

2H09

1H10

2H10

1H11

2H11

1H12

2H12

1H13

2H13

140

401498

612722

842719

602 606 572655

774

486

748 758640

456363

568

3.7%

6.5%

9.1% 8.7%9.6%

10.9%9.7%

7.6% 7.3% 7.6% 7.9%8.6%

6.9%6.0%

7.1%6.1%

4.6%3.9%

4.8%

8.29 9.4311.67

15.0214.1315.8717.9918.0516.6915.7716.5118.4420.1822.0521.95

26.3022.9521.1119.80

CPFL has presented payout ration close to 100% since its IPO, reaching the markof R$ 11.2 billion distributed. Declaration of dividend for 2H13: R$ 568 million | 0.59/share

Dividend Yield 1 (LTM) Declared dividends2 (R$ Mi) CPFL average price (R$/ORD)3

1) Considering last two half years’ dividend yield. 2) Refers to declared dividend. Payment in the next half year. 3) Considers share price adjusted for reversal stock split and simultaneous split of shares on June 29, 2011 (not adjusted per dividends).

Page 41: Corporate Presentation CPFL Energia

41

Capex(e) 2014-2018

1,5531,239 1,235

1) Constant currency Dec/13. Take into account 100% interest on CPFL Renováveis and Ceran (IFRS)2) Constant currency Dec/13. Considers the proportional stake in the generation projects 3) Conventional + Renewable

1,8421,505

1,230 1,226

Total:R$ 7,739 million1 (IFRS)R$ 7,213 million2 (Pro-forma)

Distribution: R$ 5,826 million

Generation3:R$ 1,425 million (IFRS)R$ 899 million (Pro-forma)

Commercialization and Services:R$ 488 million

2013 actual (cash flow)

2014 2015 2016 2017 2018

845 8751,316 1,342 1,153 1,140

513 392

390 8019 18

53 144

13683

58 68

845 8751,316 1,342 1,153 1,140

837 603

637129

28 27

53 144

136

8358 68

1,735 1,622

2,089

IFR

SPro

-form

a 1,410 1,410

Page 42: Corporate Presentation CPFL Energia

42

CPFL Energia | Indebtedness and leverage

2012 1Q13 2Q13 3Q13 4Q13

12.6 12.5 12.6 12.2 12.2Leverage1 | R$ billion

Adjusted net debt1/Adjusted EBITDA2

4,377 4,111 3,676 3,466 3,399Adjusted EBITDA2

R$ million

62%

3%7%

28%

CDI

Prefixed (PSI)

IGP

TJLP

Gross debt breakdown3Gross debt cost3 | LTM

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

9.4%7.9%

9.9%7.3% 7.1%

4.9% 4.4% 4.3%3.0% 2.4%

17.7%

13.9% 13.4%12.1%

13.4%

9.4% 10.5% 11.1%9.0% 8.4%

Nominal

Real

1) Financial covenants criteria. 2) LTM recurring EBITDA (covenants criteria). 3) Financial debt (+) private pension fund (-) hedge (considering proportional consolidation).

2.89 3.03 3.42 3.53 3.59

Page 43: Corporate Presentation CPFL Energia

43

CPFL Energia | Strong and robust liquidity

Cash Short term

2015 2016 2017 2018 2019 2020+

4,206

1,549

3,304

2,0602,206

2,926

1,645

2,923

Debt amortization schedule1,2 (Dec/13) | R$ million

Cash coverage:

2.7x short-term amortization (12M)

1) Disregard financial charges (ST = R$ 288 million; LT = R$ 76 million), hedge (net positive effect of R$ 316 million) and MTM (R$ 44 million). 2) IFRS consolidation criteria.

Average tenor: 4.01 yearsShort-term (12M): 11.0% of total

Page 44: Corporate Presentation CPFL Energia

2 Distribution

3 Generation

Competitive Power Supply and Services4

1 Corporate Overview

Agenda

Consolidated financial figures5

44

6 The Electric Sector

Page 45: Corporate Presentation CPFL Energia

Energy sector in Brazil: business segments

Consumers

1) Source: ANEEL - March 31, 2014; 2) Source: EPE and CCEE 3) Source : ONS and Ministry of Mines and Energy (MME) – January 31, 2014

Free Market

Captive Market

74.8 million consumers

1,755 Consumers126 TWh of billed

energy2

74.8 million Consumers337 TWh of billed

energy2

Transmission

• 104 Companies³

• 117,637 km of transmission lines³

• Eletrobrás: ~55% of total assets

Distribution

• 63 Companies

• 464 TWh of billed energy2

• Top 5: ~46% of the market

Competitive Power Supply

Generation

• 128 GW of installed capacity1

• 78.7% Renewable energy1

• Eletrobrás: ~31% of total assets

45

Page 46: Corporate Presentation CPFL Energia

Brazilian electricity matrix

1) Source: EPE - National Energy Balance 2013 and 10-year Energy Plan 2013-2022; 2) Others: considers coal, oil, diesel and process gas.

Brazil’s electricity matrix is predominantly renewable, with hydro installed capacity totaling 69% of the total supply, while biomass, wind and SHPPs account for 14%. In

the next years, it is expected that other sources will grow, mainly wind, reaching 10% of total installed capacity in 2022.

Brazilian Electricity Matrix

Hydro 69%

Nuclear2%

SHPP4%

Wind3%

Biomass7%

Natural gas9%

Others7%

129 GW 153 GW 183 GW

2013 2017 2022

Evolution of Installed Capacity (GW) 2013-20221

2

46

Hydro 67%

Nuclear1%

SHPP4%

Wind8%

Biomass6%

Natural gas8%

Others6%

2

Hydro 65%

Nuclear2%

SHPP4%

Wind10%

Biomass8%

Natural gas8%

Others5%

2

Page 47: Corporate Presentation CPFL Energia

2013 2014 2015 2016 2017 2018

Reserve Energy Auction - LER:Discos are not required to declare contracting needs and generation costs are covered through sector

charges

Discos must purchase electric energy to supply their captive market, five years in advance,in public auctions (Regulated Market – ACR)

Discos

Gencos

Mechanics of regulated auctions

A-5 Auction

A-3 Auction

A-1 Auction

• New Energy: Initial supply 5 years after the auction• Term of contract: 15-30 years• Objective: Cover discos market growth and finance new

generation • Energy contract limit: no limit

• “Old” or Existing Energy: Initial supply in the following year• Term of contract: 1-15 years• Objective: Replace old contracts, maintaining the discos’

contracting level • Energy contract limit: 96% to 100% of the Replacement Amount

(MR)

• “New” Energy: Initial supply 3 years after the auction• Term of contract: 15-30 years• Objective: Adjust discos’ contracted energy levels• Energy contract limit: 2% of the load

47

Page 48: Corporate Presentation CPFL Energia

481) Potential: PDE 2022; Installed Capacity : BIG - ANEEL december, 2013 + A-5 Auction (2) Includes estimates of energy imported from Itaipu HPP, wich is not consumed by Paraguay Electric System 3) Considers the export of 2/3 of energy produced by the Company;

Unrealized Potential to be Explored in Brazil

Evolution of Brazilian Installed Capacity by Source | GWh

Highly Fragmented Market | Renewables Market Share in Brazil based on contracted energy (26GW)

Wind Potential: 143GW Installed capacity: 2.0GW

1%

SHPP Potential: 17.5GW Installed capacity: 5.0GW

29%

Biomass Potential: 17.2GW¹ Installed capacity: 8.9GW

52%

Potential Realized

83

11710

13

9

16

14

36Renewables

Other

Natural Gas

Hydro

2022A2012E

4.4% p.a.183

120

CAGR

2.3%

9.5%

3.5%

3.4%

Renewables in Brazil are expected to grow at a CAGR of 9.5%, from 16 GW in 2012 to 36 GW in 2021 and still a highly fragmented market

World’s most attractive alternative energy market

RenovaEn-

ergimpQGERBrook-fieldCosanEletrosul

GestampElecnor

Other

8.2%

1.3% 6.9%7.5%

3.6%2.9%2.5%2.4%2.0%1,8%

1,6%67,6%

²

3

Page 49: Corporate Presentation CPFL Energia

Description Sustainability

49

Natural consequence of projects with lower environmental impact

Environmental & Streamlined Implementation

Process

Faster and simpler environmental process

Faster construction cycle

Annual auctions to match growth in energy consumption

Price of energy at the captive market structurally higher than at the free market given regulatory charges

Access to Multiple Sales Channels

Regulated energy auctions and the free market

Long term inflation protected/linked PPA (average 20-30 years)

Special niche in the free market for “special client” (demand between 0.5-3.0MW)

Current special free market of 2.7% (1.6GW) to potential of 9.6% (5.8GW)

Not a sector specific benefit BNDES has been providing support for the

sector for many years

Dedicated Sovereign

Funding Conditions

BNDES Financing Low Cost – average interest rate of 7.0% Long-term funding of 16 years Attractive capital structure

Policies in place since 1996 Not a direct government expenditure/tax break Not applicable for regulated auctions

Discounts on Transmission

Charges Discount of at least 50% (TUST and

TUSD)

Tax regime for small enterprises (annual revenues below R$78 mm), which is not sector specific

REIDI is applicable for all infrastructure projects ICMS/IPI1: discussions on expanding tax

incentives to SHPPs

Favorable Tax Regime and

Fiscal Incentives

“Lucro Presumido” with reduction in the effective tax rate to 5% - 15% from 34%

REIDI (special program of incentives for infrastructure development) - exemption of PIS/COFINS,

Exemption of ICMS (movement tax) and IPI (production tax)

Source: Company ; 1) Tax on revenues

Stable and solid regulatory framework

Page 50: Corporate Presentation CPFL Energia

Top Related