COST ESTIMATE DEVELOPMENT
SEQUENCEImplement A System
Adjust For Better Performance
![Page 2: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/2.jpg)
Your biggest challenges as a cost estimator:
![Page 3: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/3.jpg)
Your biggest challenges as a cost estimator:
■ Accurate and complete project information
![Page 4: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/4.jpg)
Your biggest challenges as a cost estimator:
■ Accurate and complete project information■ Access to cost data
![Page 5: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/5.jpg)
Your biggest challenges as a cost estimator:
■ Accurate and complete project information■ Access to cost data ■ Produce a cost estimate that meets the expectations of the review
team
![Page 6: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/6.jpg)
Your biggest challenges as a cost estimator:
■ Accurate and complete project information■ Access to cost data ■ Produce a cost estimate that meets the expectations of the review
team ■ Meet the deadline for cost estimate completion
![Page 7: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/7.jpg)
Your biggest challenges as a cost estimator:
■ Accurate and complete project information■ Access to cost data ■ Produce a cost estimate that meets the expectations of the review
team ■ Meet the deadline for cost estimate completion■ Validate the cost estimate
![Page 8: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/8.jpg)
You can overcome those challenges by…
![Page 9: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/9.jpg)
You can overcome those challenges by…■ Planning your cost estimating development activities
![Page 10: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/10.jpg)
You can overcome those challenges by…■ Planning your cost estimating development activities■ Measure your performance
![Page 11: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/11.jpg)
You can overcome those challenges by…■ Planning your cost estimating development activities■ Measure your performance■ Ask for feedback from the review team
![Page 12: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/12.jpg)
You can overcome those challenges by…■ Planning your cost estimating development activities■ Measure your performance■ Ask for feedback from the review team■ Adjust your plan for the next cost estimate
![Page 13: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/13.jpg)
You can overcome those challenges by…■ Planning your cost estimating development activities■ Measure your performance■ Ask for feedback from the review team■ Adjust your plan for the next cost estimate■ Rinse and repeat!
![Page 14: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/14.jpg)
So, here is my step-by-step strategy:Step 1
![Page 15: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/15.jpg)
Step 11. Review all available documents
![Page 16: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/16.jpg)
Step 11. Review all available documents
– Ask for clarifications
![Page 17: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/17.jpg)
Step 11. Review all available documents
– Ask for clarifications– Take notes on all missing/incomplete information
![Page 18: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/18.jpg)
Step 11. Review all available documents
– Ask for clarifications– Take notes on all missing/incomplete information– Set-up a request for clarification registry
![Page 19: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/19.jpg)
Step 11. Review all available documents
– Ask for clarifications– Take notes on all missing/incomplete information– Set-up a request for clarification registry – Set-up a risk/opportunity registry and add all relevant information
![Page 20: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/20.jpg)
Step 11. Review all available documents
– Ask for clarifications– Take notes on all missing/incomplete information– Set-up a request for clarification registry – Set-up a risk/opportunity registry and add all relevant information – Make a habit to review documents for all specifications which
might have an impact on cost
![Page 21: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/21.jpg)
Step 11. Review all available documents
– Ask for clarifications– Take notes on all missing/incomplete information– Set-up a request for clarification registry – Set-up a risk/opportunity registry and add all relevant information – Make a habit to review documents for all specifications which
might have an impact on cost– Build-up the project in your mind theatre and take the time to see
the big picture
![Page 22: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/22.jpg)
Step 2
![Page 23: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/23.jpg)
Step 22. Define the purpose of the cost estimate:
![Page 24: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/24.jpg)
Step 22. Define the purpose of the cost estimate:
– Is it a cost estimate for a tender submission?
![Page 25: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/25.jpg)
Step 22. Define the purpose of the cost estimate:
– Is it a cost estimate for a tender submission?– Or, is it a budget cost estimate for a client/owner/engineering
firm? If so, what is the expected accuracy?
![Page 26: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/26.jpg)
Step 3
![Page 27: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/27.jpg)
Step 33. Set-up the cost estimate development kick-off meeting
![Page 28: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/28.jpg)
Step 33. Set-up the cost estimate development kick-off meeting
– Invite all cost estimate review team members
![Page 29: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/29.jpg)
Step 33. Set-up the cost estimate development kick-off meeting
– Invite all cost estimate review team members– Feel free to invite construction professionals within the company
who might have a valuable input
![Page 30: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/30.jpg)
Step 33. Set-up the cost estimate development kick-off meeting
– Invite all cost estimate review team members– Feel free to invite construction professionals within the company
who might have a valuable input– Discuss:
![Page 31: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/31.jpg)
Step 33. Set-up the cost estimate development kick-off meeting
– Invite all cost estimate review team members– Feel free to invite construction professionals within the company
who might have a valuable input– Discuss:
■ Constructability methods
![Page 32: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/32.jpg)
Step 33. Set-up the cost estimate development kick-off meeting
– Invite all cost estimate review team members– Feel free to invite construction professionals within the company
who might have a valuable input– Discuss:
■ Constructability methods■ Price sourcing strategy
![Page 33: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/33.jpg)
Step 33. Set-up the cost estimate development kick-off meeting
– Invite all cost estimate review team members– Feel free to invite construction professionals within the company
who might have a valuable input– Discuss:
■ Constructability methods■ Price sourcing strategy
– What scope will be subcontracted?
![Page 34: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/34.jpg)
Step 33. Set-up the cost estimate development kick-off meeting
– Invite all cost estimate review team members– Feel free to invite construction professionals within the company
who might have a valuable input– Discuss:
■ Constructability methods■ Price sourcing strategy
– What scope will be subcontracted?– What scope will be self-performed?
![Page 35: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/35.jpg)
Step 33. Set-up the cost estimate development kick-off meeting
– Invite all cost estimate review team members– Feel free to invite construction professionals within the company
who might have a valuable input– Discuss:
■ Constructability methods■ Price sourcing strategy
– What scope will be subcontracted?– What scope will be self-performed?– How many quotations will be required to validate a price?
![Page 36: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/36.jpg)
Step 4
![Page 37: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/37.jpg)
Step 44. Develop the cost estimate schedule:
![Page 38: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/38.jpg)
Step 44. Develop the cost estimate schedule:
– List all activities needed to be performed to complete the cost estimate
![Page 39: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/39.jpg)
Step 44. Develop the cost estimate schedule:
– List all activities needed to be performed to complete the cost estimate
– Estimate the time required for each activity
![Page 40: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/40.jpg)
Step 44. Develop the cost estimate schedule:
– List all activities needed to be performed to complete the cost estimate
– Estimate the time required for each activity– Build the schedule logic and determine the milestones
![Page 41: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/41.jpg)
Step 44. Develop the cost estimate schedule:
– List all activities needed to be performed to complete the cost estimate
– Estimate the time required for each activity– Build the schedule logic and determine the milestones– Determine the resource required for cost estimate completion
![Page 42: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/42.jpg)
Step 44. Develop the cost estimate schedule:
– List all activities needed to be performed to complete the cost estimate
– Estimate the time required for each activity– Build the schedule logic and determine the milestones– Determine the resource required for cost estimate completion– Communicate with management regarding the resource
requirements
![Page 43: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/43.jpg)
Step 44. Develop the cost estimate schedule:
– List all activities needed to be performed to complete the cost estimate
– Estimate the time required for each activity– Build the schedule logic and determine the milestones– Determine the resource required for cost estimate completion– Communicate with management regarding the resource
requirements– Build-in time for unexpected activities: last minute take-off for
subcontractor price review and validation, changes to the project documents, etc.
![Page 44: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/44.jpg)
Step 44. Develop the cost estimate schedule:
– List all activities needed to be performed to complete the cost estimate
– Estimate the time required for each activity– Build the schedule logic and determine the milestones– Determine the resource required for cost estimate completion– Communicate with management regarding the resource requirements– Build-in time for unexpected activities: last minute take-off for
subcontractor price review and validation, changes to the project documents, etc.
– Build-in time for cost estimate reviews
![Page 45: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/45.jpg)
Step 5
![Page 46: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/46.jpg)
Step 55. Develop Work Breakdown Structure to meet the following
requirements:
![Page 47: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/47.jpg)
Step 55. Develop Work Breakdown Structure to meet the following
requirements:– Tender closing and submission
![Page 48: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/48.jpg)
Step 55. Develop Work Breakdown Structure to meet the following
requirements:– Tender closing and submission– Cost estimate review
![Page 49: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/49.jpg)
Step 55. Develop Work Breakdown Structure to meet the following
requirements:– Tender closing and submission– Cost estimate review– Price sourcing strategy
![Page 50: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/50.jpg)
Step 55. Develop Work Breakdown Structure to meet the following
requirements:– Tender closing and submission– Cost estimate review– Price sourcing strategy– Construction methodology
![Page 51: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/51.jpg)
Step 55. Develop Work Breakdown Structure to meet the following
requirements:– Tender closing and submission– Cost estimate review– Price sourcing strategy– Construction methodology– Estimate validation and benchmarking
![Page 52: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/52.jpg)
Step 55. Develop Work Breakdown Structure to meet the following
requirements:– Tender closing and submission– Cost estimate review– Price sourcing strategy– Construction methodology– Estimate validation and benchmarking– Internal database update
![Page 53: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/53.jpg)
Step 6
![Page 54: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/54.jpg)
Step 66. Develop the cost estimate:
![Page 55: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/55.jpg)
Step 66. Develop the cost estimate:
– Quantity take-offs based on WBS and price sourcing strategy
![Page 56: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/56.jpg)
Step 66. Develop the cost estimate:
– Quantity take-offs based on WBS and price sourcing strategy– Develop direct costs
![Page 57: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/57.jpg)
Step 66. Develop the cost estimate:
– Quantity take-offs based on WBS and price sourcing strategy– Develop direct costs– Develop indirect costs based on preliminary construction schedule
![Page 58: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/58.jpg)
Step 66. Develop the cost estimate:
– Quantity take-offs based on WBS and price sourcing strategy– Develop direct costs– Develop indirect costs based on preliminary construction schedule– Optimize resources
![Page 59: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/59.jpg)
Step 66. Develop the cost estimate:
– Quantity take-offs based on WBS and price sourcing strategy– Develop direct costs– Develop indirect costs based on preliminary construction schedule– Optimize resources– Update costs as they become available from
subcontractors/suppliers
![Page 60: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/60.jpg)
Step 66. Develop the cost estimate:
– Quantity take-offs based on WBS and price sourcing strategy– Develop direct costs– Develop indirect costs based on preliminary construction schedule– Optimize resources– Update costs as they become available from
subcontractors/suppliers– Incorporate all additional information if applicable (changes to the
project documents, clarifications, etc.)
![Page 61: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/61.jpg)
Step 66. Develop the cost estimate:
– Quantity take-offs based on WBS and price sourcing strategy– Develop direct costs– Develop indirect costs based on preliminary construction schedule– Optimize resources– Update costs as they become available from
subcontractors/suppliers– Incorporate all additional information if applicable (changes to the
project documents, clarifications, etc.)– Price and incorporate risk registry items as applicable
![Page 62: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/62.jpg)
Step 66. Develop the cost estimate:
– Quantity take-offs based on WBS and price sourcing strategy– Develop direct costs– Develop indirect costs based on preliminary construction schedule– Optimize resources– Update costs as they become available from
subcontractors/suppliers– Incorporate all additional information if applicable (changes to the
project documents, clarifications, etc.)– Price and incorporate risk registry items as applicable– Review cost estimate draft with the review team
![Page 63: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/63.jpg)
Step 66. Develop the cost estimate:
– Quantity take-offs based on WBS and price sourcing strategy– Develop direct costs– Develop indirect costs based on preliminary construction schedule– Optimize resources– Update costs as they become available from
subcontractors/suppliers– Incorporate all additional information if applicable (changes to the
project documents, clarifications, etc.)– Price and incorporate risk registry items as applicable– Review cost estimate draft with the review team– Update the cost estimate as per review notes
![Page 64: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/64.jpg)
Step 66. Develop the cost estimate:
– Quantity take-offs based on WBS and price sourcing strategy– Develop direct costs– Develop indirect costs based on preliminary construction schedule– Optimize resources– Update costs as they become available from
subcontractors/suppliers– Incorporate all additional information if applicable (changes to the
project documents, clarifications, etc.)– Price and incorporate risk registry items as applicable– Review cost estimate draft with the review team– Update the cost estimate as per review notes– Update costs as more information becomes available from
subcontractors/suppliers
![Page 65: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/65.jpg)
Step 66. Develop the cost estimate:
– Quantity take-offs based on WBS and price sourcing strategy– Develop direct costs– Develop indirect costs based on preliminary construction schedule– Optimize resources– Update costs as they become available from subcontractors/suppliers– Incorporate all additional information if applicable (changes to the
project documents, clarifications, etc.)– Price and incorporate risk registry items as applicable– Review cost estimate draft with the review team– Update the cost estimate as per review notes– Update costs as more information becomes available from
subcontractors/suppliers– Final cost estimate and tender submission review.
![Page 66: Cost Estimate Development Sequence](https://reader035.vdocuments.net/reader035/viewer/2022062523/58f9a841760da3da068b6242/html5/thumbnails/66.jpg)
Your turn now! What is your best strategy?Please leave your comments and share what works best for you. How do you manage to finish your cost estimates on time and have them pass the final review? Do you want to see what others are saying about the challenges they face as cost estimators? Take the survey, it is anonymous:https://goo.gl/forms/udLFq83q5Su7j5uY2
Thank you for clicking through the full slide deck!