Page 1: Cost Estimation

S.No. Item

Land cost

1 Materials

i) Civil

Piling Construction

Pile Caps / Footing

Columns

Beams

Slabs

Page 2: Cost Estimation

Staircase

Water Storage tank

Septic Tank

Water Treatment Plant

Wall Finishing

Door Work

Window Work

Page 3: Cost Estimation

Flooring

Ceiling

Brickwork

Landscaping

Facilities

ii) Electrical

2 Machinery

Page 4: Cost Estimation

4 Labour

TOTAL

Page 5: Cost Estimation

Sub-items Quantity

Boundary Wall construction

Bricks

Cement

Sand

Earth work and land filling

Cement

Sand

Coarse Aggregate

TMT steel reinforcement

Binding wires

Bricks (simple flyash bricks)

Cement

Sand

Coarse Aggregate

TMT steel reinforcement

Binding wires

Bricks (simple flyash bricks)

Cement

Sand

Coarse Aggregate

TMT steel reinforcement

Binding wires

Bricks (simple flyash bricks)

Cement

Sand

Coarse Aggregate

TMT steel reinforcement

Binding wires

Bricks (simple flyash bricks)

Cement

Sand

Coarse Aggregate

TMT steel reinforcement

Binding wires

Bricks (simple flyash bricks)

Page 6: Cost Estimation

Cement

Sand

Coarse Aggregate

TMT steel reinforcement

Binding wires

Bricks (simple flyash bricks)

Cement

Sand

Coarse Aggregate

TMT steel reinforcement

Binding wires

Water Tank

Bricks (simple flyash bricks)

Cement

Sand

Coarse Aggregate

TMT steel reinforcement

Binding wires

Septic Tank

Bricks (simple flyash bricks)

Cement

Sand

Coarse Aggregate

TMT steel reinforcement

Binding wires

Water Treatment Plant

Bricks (simple flyash bricks)

Inside Plaster

Inside Putty

Inside Painting

Inside Labor Work

Outside Plaster

Outside Painting

Outside Putty

Outside Labor Work

Door Panel

Door Framing

Door Locks and Accessories

Labor Work

Window Panels

Page 7: Cost Estimation

Window Frame

Window Lock and Accessories

Labor Work

Floor Screeding

Tiles

Labor Work

Ceiling Cement Finish

Putty Work

Bricks

Cement

Sand

Labor Work

Grills

Floor tiles with flooring work

Woodwork

Door/window handles and other fixtures

Glasswork with aluminium frames for windows

Plumbing & water supply arrangements

Sanitary ware

Kitchen sink

Fire exinguisher

Electrical Equipment

Construction cost(including roads, garden)

RO Purifier 400 LPH

Generator

Transformenr

Wifi

Lift

Club house construction

Gym equip

TT table

Swimming Pool

Depatmental Store

Bus

500 KVA Transformer

Concrete batch mixing Plant

Excavator

Page 8: Cost Estimation

Roller

Formwork/Shuttering

Internal and external Vibrator

Hoists/crane

Dumper

Concrete pump

Transportation and fuel

Labour associated with construction

Electric fittings

Manpower for handling and maintenance of Equipments

Page 9: Cost Estimation

Rate1(MRP) Rate2(Bulk price)

12,500,000.00 12,500,000.00

bricks Rs. 7.00 Rs. 5.00

bags Rs. 330 Rs. 280

cubic metres Rs. 1,300 Rs. 1,100

Rs. 2,200,000 Rs. 2,000,000

bags Rs. 330 Rs. 280

cubic metres Rs. 400 Rs. 300

cubic metres Rs. 1,300 Rs. 1,100

metric tonnes Rs. 48,000 Rs. 42,000

metric tonnes Rs. 44,000 Rs. 40,000

bricks Rs. 7.00 Rs. 5.00

bags Rs. 330 Rs. 280

cubic metres Rs. 400 Rs. 300

cubic metres Rs. 1,300 Rs. 1,100

metric tonnes Rs. 48,000 Rs. 42,000

metric tonnes Rs. 44,000 Rs. 40,000

bricks Rs. 7.00 Rs. 5.00

bags Rs. 330 Rs. 280

cubic metres Rs. 400 Rs. 300

cubic metres Rs. 1,300 Rs. 1,100

metric tonnes Rs. 48,000 Rs. 42,000

metric tonnes Rs. 44,000 Rs. 40,000

bricks Rs. 7.00 Rs. 5.00

bags Rs. 330 Rs. 280

cubic metres Rs. 400 Rs. 300

cubic metres Rs. 1,300 Rs. 1,100

metric tonnes Rs. 48,000 Rs. 42,000

metric tonnes Rs. 44,000 Rs. 40,000

bricks Rs. 7.00 Rs. 5.00

bags Rs. 330 Rs. 280

cubic metres Rs. 400 Rs. 300

cubic metres Rs. 1,300 Rs. 1,100

metric tonnes Rs. 48,000 Rs. 42,000

metric tonnes Rs. 44,000 Rs. 40,000

bricks Rs. 7.00 Rs. 5.00

Page 10: Cost Estimation

bags Rs. 330 Rs. 280

cubic metres Rs. 400 Rs. 300

cubic metres Rs. 1,300 Rs. 1,100

metric tonnes Rs. 48,000 Rs. 42,000

metric tonnes Rs. 44,000 Rs. 40,000

bricks Rs. 7.00 Rs. 5.00

bags Rs. 330 Rs. 280

cubic metres Rs. 400 Rs. 300

cubic metres Rs. 1,300 Rs. 1,100

metric tonnes Rs. 48,000 Rs. 42,000

metric tonnes Rs. 44,000 Rs. 40,000

Rs. 216,000 Rs. 190,300

bricks Rs. 7.00 Rs. 5.00

bags Rs. 330 Rs. 280

cubic metres Rs. 400 Rs. 300

cubic metres Rs. 1,300 Rs. 1,100

metric tonnes Rs. 48,000 Rs. 42,000

metric tonnes Rs. 44,000 Rs. 40,000

cubic ft Rs. 448,000 Rs. 398,000

bricks Rs. 7.00 Rs. 5.00

bags Rs. 330 Rs. 280

cubic metres Rs. 400 Rs. 300

cubic metres Rs. 1,300 Rs. 1,100

metric tonnes Rs. 48,000 Rs. 42,000

metric tonnes Rs. 44,000 Rs. 40,000

bricks Rs. 7.00 Rs. 5.00

Page 11: Cost Estimation

cubic metre Rs. 286,524 Rs. 268,350

sq. feet Rs. 55 Rs. 42

cubic feet Rs. 2,800 Rs. 2,300

apartments 1,200.00 1,100.00

sq. feet Rs. 350 Rs. 250

apartments Rs. 25,000 Rs. 23,000

apartments Rs. 44,000 Rs. 39,000

apartments Rs. 10,000 Rs. 8,000

required 12,000.00 Rs. 10,500

apartments 7,985.00 Rs. 9,000

Rs. 1,800,000 Rs. 1,700,000

unit 250,000.00 200,000.00

units 2,000.00 1,700.00

8 PAX 900,000.00 500,000.00

1,500,000.00 1,000,000.00

400,000.00 300,000.00

27,000.00 25,000.00

800,000.00 650,000.00

1,500,000.00 1,200,000.00

1,000,000.00 800,000.00

Rs. 260,000 Rs. 230,000

49,000.00 45,000.00

Page 12: Cost Estimation

sft 375.00 362.00

1,450.00 1,400.00

65,000.00 62,000.00

140,000.00 135,000.00

31,023.75 23,851.44

sq. feet construction area Rs. 180 Rs. 160

Sqft Rs. 18 Rs. 12

Page 13: Cost Estimation

Cost 1(Rs.) Cost 2

12,500,000.00 12500000

per brick - -

per bag - -

per cubic metre - -

2,200,000 2,000,000

per bag - -

per cubic metre - -

per cubic metre - -

per metric tonne - -

per metric tonne - -

per brick - -

per bag - -

per cubic metre - -

per cubic metre - -

per metric tonne - -

per metric tonne - -

per brick - -

per bag - -

per cubic metre - -

per cubic metre - -

per metric tonne - -

per metric tonne - -

per brick - -

per bag - -

per cubic metre - -

per cubic metre - -

per metric tonne - -

per metric tonne - -

per brick - -

per bag - -

per cubic metre - -

per cubic metre - -

per metric tonne - -

per metric tonne - -

per brick - -

Page 14: Cost Estimation

per bag - -

per cubic metre - -

per cubic metre - -

per metric tonne - -

per metric tonne - -

per brick - -

per bag - -

per cubic metre - -

per cubic metre - -

per metric tonne - -

per metric tonne - -

per Tank 216,000 190,300

per brick - -

per bag - -

per cubic metre - -

per cubic metre - -

per metric tonne - -

per metric tonne - -

per Tank 448,000 398,000

per brick - -

per bag - -

per cubic metre - -

per cubic metre - -

per metric tonne - -

per metric tonne - -

per brick - -

Page 15: Cost Estimation

per cubic metre - -

per sq. feet - -

per cubic metre (Teak wood) - -

per unit - -

per sq. metre (6mm thick) - -

per apartment - -

per apartment - -

- -

per set - -

per apartment - -

1,800,000 1,700,000

per unit - -

per unit - -

per set - -

per unit - 1,000,000

per unit 400,000 300,000

per unit 27,000 25,000

per unit 800,000 800,000

per unit 1,500,000 1,500,000

per unit 1,000,000 800,000

per transformer 60,000 -

machine 49,000 45,000

Page 16: Cost Estimation

per kg - -

1,450 1,400

65,000 62,000

140,000 135,000

31,024 23,851

3,600,000 3,600,000

per sq. feet - -

Per sqft - -

in lakhs 248.37 250.81

per flat 3.88 3.92

Contigency 0.20 0.20

Net Cost 4.66 4.70

proposed cost 6.19 6.25