1 © Life Cycle Engineering 2013
Troy G Schwartz, PE, CQE, CRE, CSP, CSSBB, CCMP, PMP Session: 05D - Topics on R&M Management and Risk Analysis Date: Tuesday, 28 January 2014, 0800-1000
Critical Asset Performance Standards (CAPS) Development
for Offshore Reliability
2
Outline
• Background • Process Overview • Analyzing Safety-Critical Elements • Applying CAPS • Conclusions • Next Steps
3
Background & Process Overview
4
Phase 1: Analyzing SCEs Step 1 Identify Major Accident Events (MAEs)
5
Phase 1: Analyzing SCEs (cont.) Step 2 Develop the Safety Case
6
Phase 1: Analyzing SCEs (cont.) Step 3 Identify Safety-Critical Elements (SCEs)
MODU = Mobile Offshore Drilling Unit
7
Phase 1: Analyzing SCEs (cont.) Step 3 Identify Safety-Critical Elements (SCEs)
8
Phase 2: Applying CAPS Step 4 Develop Performance Standards
9
Phase 2: Applying CAPS (cont.) Step 5 Identify Trendable Data and Thresholds
10
Phase 2: Applying CAPS (cont.) Step 6 Create SCE and non-SCE Maintenance Tasks
11
Conclusion
• At the end of the CAPS development process, the following information will be available: – Comprehensive list of the critical assets and an
understanding of their relationship to MAEs – Well-defined performance-based standards – Metrics for trending and continuous improvement – Documented maintenance tasks for critical assets
Leveraging CAPS within a Risk-Based Asset Management strategy provides the framework for
effectively managing critical asset reliability.
12
Next Steps
• Leverage Real-Time Data Integration • Perform Strategic Reliability Analysis
– Individual Asset Level – System Level Analysis
• Fixed Rig Platforms (Manned or Unmanned) • MODUs (i.e. Drill Ships, Jack-ups,
Semisubmersibles, etc.)