CrossrailMOVING LONDON FORWARD
Crossrail – enabling London to grow
£14.8bncost
£42bnnet benefit
118 kmlength
40 (10 new)stations
24Trains/hour
200mjourneys pa
High Capacity Metro Railway
Project progress
Tunnelling complete
Project progress
New track New track
Tottenham Court Road Farringdon
Video – project update
Tottenham Court Road
We all have the right to go home unharmed everyday
We believe all harm is preventable
We must all work together to achieve this
Target Zero and the golden rules
Health and Safety Performance Indicators
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
P05 P07 P09 P11 P13 P02 P04 P06 P08 P10 P12 P01 P03 P05 P07 P09 P11 P13 P02 P04 P06 P08 P10 P12 P01
2013/14 2014/15 2015/16 2016/17 2017/18
RIDDOR
HSPI
Developed from Olympics
Project Director level strategy planning
Working groups develop cross programmeapproach
Agreed ‘rules’ for programme
Site hosted visits, with Tier 2/3 input to meetings
Safety and Health Leadership Team (SHELT)
A twice yearly event, used to highlight different aspects
Held at site level, local control around core themes
External speakers, equipment demos, experiences
Day, night, weekends
Stepping up Week
2019 – Elizabeth line opens fully
December 2019: Elizabeth line fully open. Services run between Reading and Heathrow in the west and
Abbey Wood and Shenfield in the east. Peak time services shown above.
12 TPH
12 TPH +
4 TPH (Liv St High Level)24 TPH
6 TPH
4 TPH
2 TPH4 tph
2 tph
24 tph
12 tph
16 tph
12 tph
2 tph
4 tph
Reduction in journey times
Current journey time Crossrail journey time
Canary Wharf to Liverpool
Street
22 minutes 6 minutes
Paddington to Whitechapel 27 minutes 13 minutes
Ealing Broadway to
Farringdon
39 minutes 16 minutes
Tottenham Court Road to
Woolwich
42 minutes 20 minutes
All figures are running totals bar ‘employed on project’
Social sustainability - skills
Crossrail skills strategy
Maintaining safety
Inspiring future talent
Supporting local labour
Revitalising the skills base
Sept 2017
704 Apprentices
15,000 enrolled at TUCA
27% of apprentice intake in last 12 months female
4,544 jobs for local people
National Colleges for High Speed Rail
• Colleges in Birmingham and
Doncaster
• To focus on engineering, design,
planning, manufacturing and
construction
• At full capacity, colleges will train 1,200
people every year
• Cutting edge technology with virtual
and augmented reality training rooms
classrooms
Property impacts
£10.6bn (previously £5.5bn) additional residential and commercial property value by 2021
Support 90,000 (previously 55,000) new homes by 2021
4.4m (previously 3.25m) square feet of commercial office floor space by 2021
Between 2008 and 2016, 48% of planning applications within 1 km of stations make a direct reference to Crossrail supporting their proposals
Environmental sustainability
Lo
nd
on B
use
s
Lo
nd
on U
nd
erg
rou
nd
Dockla
nd
s L
igh
t R
ailw
ay
Tra
mlin
k
Lo
nd
on
Ove
rgro
un
d
Eliz
ab
eth
lin
e(p
rovis
ional)
CO2 emissions per
passenger km
75g 64g 57g 49g 43g 35-40g
Wallasea Island
Questions