Plans 2013/2014
2013April: Poseidon cruise, Med. outflow, ADCP test arrayone 150 kHz and two 75 kHz instruments+ Anderaa Current Meters (RCM 11)
Summer: Charter cruise for servicing DS-2 – probably canceledExchange 75 kHz at DS-2 with 150 kHz instrument? Wait for 75 kHz ADCP solutionHedinn/Steingrimur could you service DS-2?
Who will help Laura deploy the Reykjanes Rige Moorings?
August: Meteor cruise, upwelling filaments off Namibia (new project)3 ADCPs needed for moorings until May 2014
Plans 2013/2014
Extension of Denmark Strait Array towards the Greenland Shelf
Plans 2013/2014
Two additional ADCP moorings on the shallower Greenland side of the Strait, one additional RCM mooring on the Icelandic side-> Input needed on the design of the frames (Svein)
Plans 2013/2014
2014May: Meteor cruise off Namibia, recovery of ADCP moorings
Summer: Poseidon cruise for servicing DS-2, deployment of extra DS moorings with trawl resistant frames (design of frames still open)
2015 (not yet proposed)Recovery cruise for DS moorings neededNew mixing array experiment?
Plans 2013/2014
Poseidon cruise in 2014
Plans 2013/2014
ADCP deployment planning…..
Exchange of DS-2 75 kHz ADCP with 150 kHz depending on RDI
SN currently frequency Apr 2013 Aug 2013 2014 2015
7955 HH 150 kHz Poseidon test DS-2 or Namibia DS-2 DS-2
16430 DS-2 75 kHz DS-2 HH
13287 HH 75 kHz Poseidon test Namibia DS-3
13288 HH 75 kHz Poseidon test Namibia DS-4
13486 Faroe 75 kHz recovery May Namibia
8552 Faroe 75 kHz recovery May
13175 Flemish Pass 75 kHz ? ? ? ?
The research leading to these results has received funding from the European Union 7th Framework Programme (FP7 2007-2013), under grant agreement n.308299NACLIM www.naclim.eu