PROFILE
An engaged and committed team-player with over 18 years’ experience in maintenance and electrical environments. I have extensive experience working within deadlines, risk assessment and response adherence, with a strong background in Industrial, Commercial, Hospitality and Domestic sectors. I have extensive knowledge of working with facility systems within a procedure driven environment.
PROFESSIONAL EXPERIENCE SUMMARY
Below is an overview of projects that I have worked on during my career, to date:
Industrial Intel Ireland, Leixlip Mullingar Hospital ESB Power Station, Poolbeg Metro Media, Citywest Business Campus Vodafone, Sandyford Industrial Estate
Commercial Bridgewater Shopping Centre, Arklow Liffey Valley Shopping Centre Charleville Shopping Centre, Cork
Hospitality Ritz Carlton Hotel, Powerscourt Clarion Hotel, Dublin Grand Canal Square Hotel, Dublin
Docklands Bank of Ireland Museum, Dublin
Domestic Rewire and additional work to existing
homes in south county Dublin
QUALIFICATIONS
National Craft Certificate – Electrician, D.I.T Kevin Street
Thermographer - FLIR Level 1
FAS “Safe Pass” - Reg.No.SP1/46/1954293/0117
Manual Handling Training -July 2013.
WORK HISTORY
DPS Services.
DPS delivers Full Service Engineering with a ‘client first’ mentality and personal touch across a range of market sectors: Project and Programme Management, Procurement, Design, Construction Management, Health & Safety Management, Commissioning, Qualification and Start-up.
April 2013- Present Electrical QAQC Coordinator – Based at Intel Ireland
Oversaw Electrical QA/QC issues on the F24 project,and on the Model (BIM).Navis Works.
Operated site Lock out / Tag out system and site work permit system
Executed Electrical Install and De Install procedures
Implemented Emergency Procedures Coordinated and undertook testing of Control and Safety equipment
5 4 P R O S P E C T V I E W , P R O S P E C T M A N O R , R A T H F A R N H A M , D U B L I N 1 6 M O B I L E : 0 8 6 2 4 2 0 4 7 9 E - M A I L : F R A N K M A C A R T H Y @ G M A I L . C O M
F R A N K M C C A R T H Y
F.S.T Technical Services
June 2008- March 2010 Electrical QAQC Coordinator – Based at Intel Ireland
FST Technical Services provides third party QA/QC to the semiconductor microelectronics and biopharmaceutical industries.
FST’s complete scope of services includes augmenting a customer’s workforce with industry specific experience.
Oversaw Electrical QA/QC testing on the F10C & F14D projects
Executed Electrical Install and De Install procedures
Implemented Emergency Procedures Coordinated and undertook testing of Control and Safety equipment
Hosted Twice-weekly team meetings
Implemented company quality & safety policies and procedures
Operated site Lock out / Tag out system and site work permit system
Trained and Certified as a Level 1 Thermographer in Preventive Maintenance Infra Red Scanning of Electrical Control panels and Motors
Mercury Engineering Ltd, Dublin
August 1996 – June 2008 Foreman/Charge Hand Electrician
During the 12 years with Mercury Engineering my role involved the coordination of electrical installation and testing to
certification standards on various projects in Ireland. For the majority of my time with Mercury, I worked within a clean room
environment at Intel Ireland Ltd, but was also involved in the build of two hotels, two shopping centers, and a hospital:
Intel Ireland, Leixlip
Role involved installing and de-installing ‘tool sets’,
electrical plant and equipment (main boards and sub
boards), AHU’s, Motors and Pumps for Heating Cooling
systems.
Ritz Carlton Hotel, Powerscourt
(Nov 2006 - Sept 2007). My main body of work was
in the Spa, Gym, Pool, Ballroom, Main Electrical
Switch Room, Plant room fit out, 2nd Fix of rooms,
Connection of Pods/Toilets. I undertook the
installation, testing and certification of M&E. I also
oversaw the handover to the client – carrying out a
walk through on-site explaining how to use the
procedures and the use of all equipment.
Bridgewater Shopping Centre, Arklow Charleville Shopping Centre, Cork
Mullingar Hospital Grand Canal Square Hotel, Dublin Docklands
5 4 P R O S P E C T V I E W , P R O S P E C T M A N O R , R A T H F A R N H A M , D U B L I N 1 6 M O B I L E : 0 8 6 2 4 2 0 4 7 9 E - M A I L : F R A N K M A C A R T H Y @ G M A I L . C O M
F R A N K M C C A R T H Y
Kirby Electrical Ltd, Dublin
May 1998 – August 1999 Electrician
Kirby Electrical are mainly involved in Industrial Electrical Installation. I was involved in the following list of projects whilst in
their employment:
ESB, Poolbeg – gas turbine installation: On loan to ESB for General Maintenance on this project.
Panasonic, Dundalk, - hard disk drive manufacturers
Liffey Valley Shopping Complex.
EDUCATION
1995 DIT Kevin St. – Senior Trade Certificate1993 DIT Kevin St. – Junior Trade Certificate1990 Ballinteer Community School – Leaving Certificate