DATA SHEETWaste Water

Treatment Plants

Dayliff WWP Waste Water Plants are specially designed to treat organic waste water sources to acceptable open discharge quality. They breakdown organic wastes including, sewage and light paper whilst reducing associated odours and insects. The five stage treatment process works on the extended aeration Biodigester principal with accelerated organic decomposition through aeration followed by filtration and chlorination.

Plant chambers are constructed from reinforced masonry either by the client with Davis & Shirtliff supplying the chambers design and a complete package of all necessary equipment and fittings or alternatively as a complete turnkey project. Preferably they are installed in-ground to minimize visual impact, though an above ground option is available. The treatment process is as follows:-

l Stage 1 - Waste water is collected in a Stabilisation Chamber where specially bred bacteria are introduced to begin the biodigestion process.

l Stage 2 - The water passes into the Aerated Bioreactor into which air is pumped to accelerate the bacterial action that degrades the solids into a clear effluent and a non toxic sludge.

l Stage 3 - Aerated water flows into a Sedimentation/Recirculation Chamber where the sludge settles and is then re-circulated back to the Stabilisation Chamber for further processing.

l Stage 4 - Clarified water is collected in a Clarification Chamber from which it is pumped through a mixed bed sand/activated carbon filter to remove remaining particles and odour.

l Stage 5 - The treated water is Chlorinated to neutralise any remaining bacteria and is then suitable for open discharge.

Dayliff WWP Waste Water Plants use proven effective technology and due to their simple design are reliable, efficient and easy to operate. Six sizes are offered as standard, though the plants can be up scaled to provide sizes suitable for site requirements.

Page 2: DATA SHEET Waste Water - Davis & Shirtliff · DATA SHEET Waste Water ... turnkey project. ... DAYLIFF MAPRO CL50HS 1.5kW, 3PH DAYLIFF MAPRO CL60HS 3kW, 3PH DAYLIFF MAPRO 2No CL520HS

Typical Plant Flow Layout

Equipment Specification

FLOW35m /day

WWP5310m /day

WWP10320m /day

WWP20340m /day

WWP40360m /day

WWP603100m /day

WWP100

Peak Flow Design

Population Equivalents

BOD Capacity

31m /hr 32m /hr 34m /hr 38m /hr312m /hr 320m /hr

30 Head 60 Head 110 Head 220 Head 330 Head 560 Head

2kg

33m /10hrs

310m /40hrs

340m /hrsDAYLIFF MAPRO

CL40HS1.1kW, 3PH

DAYLIFF DWXV07A, 0.37kW,

1PH

DAYLIFF DWXV07A, 0.37kW,

1PH

DAYLIFF DWXV07A, 0.75kW,

1PH

DAYLIFF DWXV07A, 0.75kW,

1PH

DAYLIFF DWXV15A, 1.1kW,

1PH

Pedrollo TopMulti

0.55kW

Dayliff QP30.6kW

Dayliff QP30.6kW

Dayliff QP40.75kW

Dayliff QP40.75kW

Dayliff QP61.1kW

Dayliff QP81.5kW

Pedrollo TopMulti

0.55kW

Pedrollo TopMulti

0.55kW

Pedrollo Dm300.75kW

Pedrollo Dm300.75kW

Pedrollo VXCm15/45

1.1kW, 1ph

32m /10hrs

3m

3m

35m /13hrs

320m /40hrs

380m /hrs

34m /10hrs

3m

3m

310m /12hrs

340m /40hrs

3160m /hrs

310m /10hrs

4m

3m

320m /11hrs

370m /40hrs

3300m /hrs

310m /10hrs

4m

3m

330m /10hrs

3110m /40hrs

3500m /hrs

320m /10hrs

5m

3m

340m /9hrs

3190m /40hrs

3800m /hrs

330m /10hrs

6m

4m

4kg 9kg 18kg 27kg 44kg

Stabilization Chambervolume & RetentionTimeAerated BioreactorVolume & RetentionTimeSedimentation ChamberVolume & Retention Time

Daily Air Demand

Air Pump

Sludge Pump

Clarified Water Pump

Backwash Pump

5m 6m 9m 15m 18m 19,mLength

Width

Depth

MODEL

DT193B-08/14

OPERATING PARAMETERSRetention Time: 2.5 day at rated flowTreated Water Quality: BOD of 20 mg/l, Suspended Solids of 30mg/l, Ammoniacal Nitrogen (as N) of 20mg/l

DAYLIFF CXD300

DAYLIFF CX300

DAYLIFF CXD300

DAYLIFF CX300

DAYLIFF CXD600

DAYLIFF CX600

DAYLIFF CXD600

DAYLIFF CX600

DAYLIFF CXD900

DAYLIFF CX900 2 x CXD 900

Activated Carbon Filter

Sand Filter

Chlorinator Klorman Unit Klorman Unit Klorman Unit Bucaneer Unit Bucaneer Unit Bucaneer Unit

2 x CXD 900

DAYLIFF DWXV15A, 1.1kW,

1PH

DAYLIFF MAPROCL50HS

1.5kW, 3PH

DAYLIFF MAPROCL60HS

3kW, 3PH

DAYLIFF MAPRO2No CL520HS

3kW, 3PH

DAYLIFF MAPRO2No CL720HS

4.3kW, 3PH

DAYLIFF MAPRO4No CL720HS

4.3kW, 3PH

ZAMBIALusaka - Main OfficeTel: (260 211) 288010/1d&[email protected]

NdolaTel: (260 212) 610936/7d&[email protected]

KitweTel: (260 212) 221747/67d&[email protected]

LivingstoneTel: (260 213) 320002/234d&[email protected]

SolweziTel: (260 218) 821822d&[email protected]

KENYANairobi - Head OfficeTel: (254 20) [email protected]

Nairobi - WestlandsTel: (254 20) 4446011/6 west [email protected]

Nairobi - DowntownTel: (254 20) 3340102 [email protected]

Nairobi - KarenTel: (254 20) [email protected]

KiambuTel: (254 66) [email protected]

ThikaTel: (254 67) [email protected]

KitengelaTel: (254 45) [email protected]

MachakosTel: (254 44) [email protected]

MeruTel: (254 64) [email protected]

GarissaTel: (254 46) [email protected]

NaivashaTel: (254 50) [email protected]

LodwarTel: (254 724) [email protected]

UGANDAKampala - Main Office Tel: (256 414) 346337/8d&[email protected]

Kampala - NakaseroTel: (256 392) 734633d&[email protected]

Kampala - Shauri YakoTel: (256 414) 660 [email protected]

GuluTel: (256 471) 433041d&[email protected]

MbararaTel: (256 753) 940 080d&[email protected]

© Davis & Shirtliff 2015. Contents herein are not warranted. The right is reserved to amend specifications without notice. www.davisandshirtliff.com

EldoretTel: (254 53) 2061306 [email protected]

NakuruTel: (254 51) 2213248 [email protected]

KakamegaTel: (254 56) [email protected]

KisumuTel: (254 57) 2024763 [email protected]

KisiiTel: (254 58) 2030949 [email protected]

KENYA COAST

Mombasa - Main OfficeTel: (254 20) 2040432 [email protected]

MalindiTel: (254 42) 2120425 [email protected]

DianiTel: (254 40) 3202181 [email protected]

LamuTel: (254 20) 2651052/[email protected]

NyaliTel: (254 20) [email protected]

VoiTel: (254 20) [email protected]

TANZANIADar es Salaam - Main OfficeTel: (255 22) 2112515/6d&[email protected]

Dar es Salaam - KariakooTel: 2184867d&[email protected]

ArushaTel: (255 27) 2547317/[email protected]

ZanzibarTel: (255 24) 2234660/[email protected]

MwanzaTel: (255 28) 2541971/2d&[email protected]

RWANDAKigaliMuhima RoadTel: (250) 252 [email protected]

RubavuPoint Lourd RoadTel: (243) 814 [email protected]

SOUTH SUDANJubaTel: (211 956 ) 397 [email protected]

ETHIOPIA Addis AbabaTel: (251 11) 5159341/44d&[email protected]


Top Related