• Early 2000 – Population Growth beyond service capability– Large residential development
• 5,000-6,000 new residents per month• Growth in the outlying areas• Extended response times with current resources• Tax base could not support without mandates
– Public Service –Customer Service• 100,000 – 500,000 tourist each day
Situation Overview
Rural Stations
Urban Stations
Quick Look at Statistics
• Population Served - *1,815,700• The number includes only the residents and is not
indicative of the actual population served. • Our community welcomes over 41 million visitors each
year. • This means that on average, the combined population of
Clark County, Las Vegas, North Las Vegas and Henderson nearly doubles its volume each month.
Quick Look at Statistics...
• Land Area Covered (in sq. miles)- 7,420
• Paid Fire Stations- 25 / Paid Firefighters- 614
• Volunteer Fire Stations- 13 / Volunteer Firefighters- 350
• Inspectors & Investigators- 58
• Support Employees- 50
• Total Incidents- 103,944
• Fire Incidents- 4,143
• Medical Incidents- 76,120
• Fire Prevention Inspections- 99,133
• Construction Plan Reviews - 8,538
Proposed Solution
• Need for fire and EMS service to keep outpacing growth
• Developer-based agreements– Large scale builders– Ensure emergency services not compromised
Thoughts Behind the Idea
• Builder making large profits• Builder needs planning and zoning permits• Fire department involved in inspections for permits• Builder would agree to build fire station • Builder agree to equip station with adequate resources
to service the population in the area– Based on stations in comparable areas of the county– Staffing to be absorbed by local tax base (new population of
residential)
• Station built at the same time as the building under construction
Influence with the Builders
• Used in residential sales approach
• Large parcels of land almost used up
• No more lots available by 2012
– Timing is everything
• Little impact in areas that are already developed
Las Vegas Strip Corridor
• 2-3 miles in length• Large scale impact on emergency service resources• Open land parcels in this area are significantly smaller• Older structures are being demolished to allow for newer innovative
structures• Three profit levels
– Residential– Retail– Convention space
• As many as 70 new structures planned to be built in this area• Scheduled to be completed by 2010
Significant Structures
• City Center – south of the Bellagio Hotel
• Twin 50-60 story high rise residential– 250,000 new residents in less than 1 square
mile
• Retail shops
Nuts and Bolts of Development Agreements
Using City Center (owned by MGM) as example:
• Anticipated emergency services problems due to highly congested area
• Fire department committee formed for collaboration– Administration– Fire prevention– Labor (Local 1908)
• Met with developers to discuss anticipated problems upon occupation
• MGM management understood the issue and agreed proposals were in best interest of workers now and occupants upon completion
• City Center coordinators agreed to – build a fire station – furnish all living standards– purchase a new engine and two rescue units to be housed at the station
• Station to be opened 12 months prior to certificate of occupancy
Considerations of Developer Agreements
• Legal consult from District Attorney
• Data– Response projections– Geographic boundaries– Estimated financial impacts (now and future)
• Planning and Zoning understanding of intent of agreements to assure longevity
• Political leaders who understand the intent and won’t back door you with the builders
• Financial representative to assist you with the numbers
• Qualified architect
• A fire department representative to assure fire station is located appropriately for accessibility in conjunction with the building
• Inspectors to check plans and to be dedicated on site to assure no lag time
Methods for Station Planning for New Property
• Baseline of 3,000 responses per year is the maximum a unit can handle and still comply with mandated training requirements and other required activities.
• Response projection for new property is based on 4 years of response data from comparable existing properties
Data Points Collected• Number of Annual Responses
• Types of Responses– Medical– Fire– Hazmat
• Type of units responding– Rescue– Engine– Truck– Special operations
• Number of units responding– Single unit response – medical, public assist– Two/three unit response – vehicle accident, elevator– Four or more unit response- fire, hazmat
Building Data Points
• Square Footage of convention space
• Square footage of retail space
• Number of rooms– Condo– Resort– Hotel
• Historical data for similar properties– Anticipated responses
Overhead Costs
• Estimated operating costs for suppression– Captain– Engineer– Firefighters– Etc…
• Support personnel– Training– Mechanics– Administrative staff
• Salary projection for 12 months from the opening date of the project
Facility Costs
• Assumptions:
– Typical fire station with 3 bays
– Single unit requires 1/3 fire station
Cost Projection Formula
• Example:– 1500 projected calls /3000 = 50%– 1 rescue unit needed at $806,140
• $806,140 x 50% = $403,170
– 1 fire engine at $1.3 million• $1.3 million x 50% = 650,000
– Fire station costs = $10.5 million• 2/3 of a station = $7 million• $7 million x 50% = $3.5 million
– Overhead Salary – 1 year/50% = $1.5 million• TOTAL = $6,053,170
Proposals
• Alexander Villas– Station – 5% contribution– Engine – 18% contribution– Personnel – 18% contribution (1 year)– Fire Inspector (24 months- construction
period)– Plans Checker (24 Months)– Fire Prevention vehicle and equipment– Total = $1,459,404
Proposals
• Gemstone– Station – 6% contribution– Engine – 21% contribution– Personnel – 21% contribution (1 year)– Fire Inspector (.83 for 24 months-
construction period)– Plans Checker (.24 for 24 Months)– Fire Prevention vehicle and equipment– Total = $1,595,416
Proposals
• Echelon Place– Station – 24% contribution– Rescue (EMS) Unit – 0%– Engine – 60% contribution– Truck – 60% contribution– Personnel – 0% contribution– Fire Inspector (2 for 24 months- construction period)– Plans Checker (1 for 24 Months)– Fire Prevention vehicle, equipment and support staff– Total = $5,225,019
Proposals
• Fontainebleau– Station – 50% contribution– Rescue (EMS) Unit – 0%– Engine – 50% contribution– Truck – 50% contribution– Personnel – 0% contribution– Fire Inspector - 0– Plans Checker -0– Fire Prevention vehicle, equipment -0– Total = $2,745,960
Proposals
• Las Palmas– Station – 34.4% contribution– Rescue (EMS) Unit – 0%– Engine – 22.9% contribution– Truck – 11.5% contribution– Personnel – 0% contribution– Fire Inspector - 0– Plans Checker -0– Fire Prevention vehicle, equipment -0– Total = $1,822,440
Proposals
• Sands Expo– Station – 4.3% contribution– Rescue (EMS) Unit – 0%– Engine – 2.9% contribution– Truck – 1.4% contribution– Personnel – 4.3% contribution– Fire Inspector - 0– Plans Checker -0– Fire Prevention vehicle, equipment -0– Total = $254,320