Download - DECANTER CENTRIFUGES ECO-Jet Weir Plates
DECANTER CENTRIFUGES & PLANTS FOR SOLID/LIQUID SEPARATION
HILLER separation & process has developed a system that helps you to save up to 30% of the energy consumption of your decanter.
With the HILLER ECO-Jet Weir Plates you save cash, plain and simple - within just a short time this investment will have paid for itself. Installing these weir plates does not result in any loss of performance at all.
nRapid amortisation nConsiderable reduction in energy consumptionnProblem-free integration into standard HILLER decanters nCan be used in different applications nQuick and simple installation nNo power loss in the system
MAIN BENEFITS OF ECO-JetCOST SAVINGS
ECO-Jet Weir Plates – for greater energy efficiency in your decanter
ECO-Jet Weir Plate
HILLER GmbH . Schwalbenholzstraße 2 . 84137 Vilsbiburg, Germany . Tel +49 8741 48-0 . [email protected] . www.hillerzentri.de
YOUR POTENTIAL SAVINGS SAVING ECO-Jet Weir Plates compared to standard weir plates
ECO-Jet Weir Plates when INSTALLED
We would be delighted to calculate the savings you could achieve with your system, and the amortisation period for your process! Naturally this calculation is free of charge and non-binding for you. Please get in touch.
Or calculate your personal ECO saving potential at eco-jet.de
HILLER ECO-Jet Weir Plates are shaped to provide targeted deflection of escaping centrate water and pass the energy saved directly back to the main drive. In the proc-ess, the main drive consumes up to 30% less drive energy - the level of potential savings depends on the throughput and the decanter size.HILLER ECO-Jet Weir Plates can be in-stalled in standard HILLER decanters at minimal cost. The optimisation makes financial sense and protects the environ-ment!
HEAD OF AFTER-SALES: Bernd RamsauerEMAIL: [email protected]: +49 16 22 91 46 44 BACKOFFICE: +49 8741 48-175FAX: +49 8741 48-740
HILLER SERVICE
Bow
l driv
e ou
tput
[kW
]
0
10
DP484 DP54 DP66
20
30
40
50
60
70
20% Saving * 2700 € / year
20% Saving * 4050 € / year
20% Saving * 6300 € / year
* Example calculation at an assumed runtime of 3000 operating hours per year with an electricity price of 0.15 euro/kWh
n Standard weir platesn ECO-Jet Weir Platesn Saving