Transcript
Page 1: Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing

Delta II 7925H - 10L Baseline workup

Launch Vehicle

Theirs Ours

• Delta II 7925H Launch Vehicle

• 10L Composite Fairing10L Stretch CompositePayload Fairing

Page 2: Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing

Delta II 7925H - 10L Baseline workup

Launch Vehicle Configuration

• 10L Composite Fairing

• Launch Volume (TMA-55 or 56)

• 6019 PAF

• 2nd Stage Engine

• 7925H LV

Ours Theirs

Page 3: Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing

Delta II 7925H - 10L Baseline workup

TMA-55 Launch configuration

10L fairing

Sun side envelope (270 deg)

TMA-55 OTA (Baffle removed)

Radiator side envelope (90 deg)

2nd stage engine

7925 Launch Vehicle

Page 4: Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing

Delta II 7925H - 10L Baseline workup

10L Composite Fairing

• 6019 PAF

• 2nd Stage Engine

Page 5: Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing

Delta II 7925H - 10L Baseline workup

TMA-55 Optics

Page 6: Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing

Delta II 7925H - 10L Baseline workup

TMA_56 Optics

Page 7: Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing

Delta II 7925H - 10L Baseline workup

TMA-55 and TMA-56 Comparisons

TMA-55

• Very thin Optical Bench Plate

• Cassegrain Focus is buried inside Primary

• Pickoffs not accessable

• Filter Wheel limits beam rotation

• Thick Optical Bench Plate (250mm)

• Room for detector mounts and shield

• Multiple Pickoffs

TMA-56

Page 8: Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing

Delta II 7925H - 10L Baseline workup

TMA-55 Rotated Beam

Page 9: Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing

Delta II 7925H - 10L Baseline workup

TMA-56 Optics with Gigacam. Configured for DeltaIV 4 meter fairing

Secondary Mirror

Primary Mirror

NIR Imager

CCD Imager

Tertiary Mirror

Radiators

Filter wheel

Star Trackers

Gyro

TTL Tracker

Optical and NIR spectrometers

Pickoff Assembly

Flat Folding Mirror


Top Related