Spokane County Department of Public Works
Engineering Division 2014 - 2019 Six Year Transportation Improvement Program
2014 Amended Construction Program
SUMMARY ROAD CONSTRUCTION PROGRAM2014 AMENDED
Major Construction Project Summary 2014Project AmountPrimary SourceFrom To
1 Farwell Road Reconstruction Project $876,000STP(U)Cherry Street Market Street
2 Country Homes Stormwater Project $2,000,000Other State3 Market Street Reconstruction Project $257,000UAPParksmith Drive Farwell Road4 Spokane Reg Wayfinding & Gateways: Signage $280,000STP(U)5 Wellesley Avenue Sidewalk Project $283,000SPHaravrd Road Arden Road6 Seven Mile Road Bridge #1602 Replacement Pr $266,000BRBr 1602 Over Coulee Cre7 Elliot Road Culvert Replacement $650,000Countyat MP 0.0058 Bruce Road Bridge No. 3604 $2,020,000BR9 Bigelow Gulch/Forker Connector - Project 4 $519,000RAPOld Argonne Road Forker Road
10 Bigelow Gulch / Forker Road Interchange $531,000RAP11 Bruce Road Bridge Approaches $700,000CountyMP 1.59 on Bruce Road MP 1,83 on Bruce Road12 Jackson Road Culvert Replacement Project $265,000CountyMP 2.35 Oclair Creek
The CONSTRUCTION PROGRAM is responsible for the improvement of the County Transportation System. ANNUAL and SIX YEAR CONSTRUCTION PROGRAMS are prepared and updated each year. Priority programming is used to select both Urban and Rural projects for improvement. Funds
ANNUAL ROAD CONSTRUCTION PROGRAM come from the following sources:2014for the
County (Includes PWTF Funds) $3,322
Federal $3,731State $3,260Assessment $122Other $614
Total Construction $11,049
Note: For each COUNTY dollar spent, a total oof CONSTRUCTION will be accomplished.
Amount (1000's)Source
$3.33
Program- Day Labor vs. Contract ProjectsSummary 2014
Category PE RW CN TOTAL UAP UCP RAP OTHER STATE
STP(E)STP(U) STP(R) BR STP(S) PWTFFED OTHER
OTHER RID BOND
COUNTY TOTALCAPP FMSIBSP
Project Funds by SourceAnnual Program
(in thousands)
2014 Program Summary
CMAQ
Bridge Construction 3,101284 27 2,790 1,0551,846 3,101200
Pathway Construction 82878 27 723 280211 828337
Road Improvement Districts 163163 0 0 41122 163
Rural Construction 2,765844 781 1,140 1,30435173 2,765951 148 154
Traffic Safety Improvement 4125 5 402 88 324 412
Urban Construction 3,780568 166 3,046 318181,037 614272 3,780211,500
11,0491,942 1,006 8,101 88 3,322531,037 614951 122Program Totals 2,019211272 11,0491691,700337 154
1,806185 2,35201,7000 0125 88758 8,016Program Contract Totals 010,9491,927 1,006 8,016
85 85Program County Force Totals 1008515 0
5/9/2014Printed: A3
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
Urban Construction1 Farwell Road Reconstruction Project 3024 I 03 S TCGPWS
14 Farwell Road Cherry Street Market Street 01323 0.75
118UAP 1180 0 118C758STP(U) 7580 0 758C
8760 0 876
Construction
Construct a 3-lane roadway with curb, swales and separated sidewalks from Cherry Street (east end of NSC Construction) to Market Street, transition and connect to existing 2-lane at Myrtle Street.
2 Country Homes Stormwater Project SWN2 I 06 S TCGPWS
1,500Other State 1,5000 0 1,500C500Other 5000 0 500C
2,0000 0 2,000
Construction
This project will install pipes for the stormwater flow in the asphalt ditch on Country Homes Blvd., landscaping and other improvements.
3 Bigelow Gulch/ Forker Rd - ROW Mitigation - Urban 3148 I 06 S
104County 1040 104 0C
1040 104 0
Right-of-Way
Mitigate ROW issues in accordance with rules & regulations.
1
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
4 Market Street Reconstruction Project 3177 I 03 S TCGPWS14 Market Street Parksmith Drive Farwell Road 03114 1.01
103County 10382 21 0C154UAP 154123 31 0C
257205 52 0
Prelim. Engineering, Right-of-Way
The project will reconstruct Market St. between Farwell Rd. and the railroad tracks north of Parksmith. Where there is sidewalk missing there will be new curb and sidewalk added except south of Grace Ave. on the east side of market where curb only is proposed. The ro section will provide a 43' wide paved surface that will contain two 11' travel lanes and a two way left turn lane with 5' bike lanes on each side. A fiber optic cable will be installed in an existing conduit which will connect the Farwell & Market signal with the Spokane Regional Transportation Management Center for monitoring and control of the signal. Stormwater treatment will be added where Spokane County standards require treatment.
5 South Hill Park & Ride Study 3129 I 06 S Ttcgpws
1County 11 0 0C18Other Fed 1818 0 0C
1Other 11 0 0C
2020 0 0
Prelim. Engineering
This project is a cooperative planning and design project between Spokane County and Spokane Transit Authority. The project objective is to study and review the size, type, and location for a Transit Park and Ride and supportive infrastructure. The concept of this project is to provide a park and ride lot in the study area that will allow a shorter distance to travel in single occupant vehicles to access transit.
6 Thomas Mallen TIF Project 3117 I 04 S TCGPWS0.00
65Other 650 0 65C
650 0 65
Construction
This project is being set up to track costs associated with the Thomas Mallen TIF project which plans to widen and improve Thomas Mallen Road for the Aircraft Museum.
2
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
7 Liberty Lake TIF & LIFT 3130 I 01 S
10Other 1010 0 0C
1010 0 0
Administration
This CRP is established to administer Spokane County Engineering's responsibilities associated with terms of the Liberty Lake TIF & LIFT(Spokane County River District Revenue Development Area at Liberty Lake).
9 Harvard Road Reconstruction 3078 I 03 S14 Harvard Rd Euclid Avenue SR 290 01741 1.60
6County 66 0 0C37STP(U) 3737 0 0C
4343 0 0
Prelim. Engineering
Reconstruct and widen roadway.
10 Spokane Reg Wayfinding & Gateways: Signage & Impro 3172 I 06 S
242STP(U) 242242 0 0C38Other 3838 0 0C
280280 0 0
Prelim. Engineering
Achieve a fully comprehennsive wayfinding signage system to aid visitors and residents alike in experiencing all that the Spokane region has to offer.
11 Argonne Road Reconstruction Project 3112 I 03 S TCGPWS14 Argonne Road Wellesley Ave. Bigelow Gulch Road 00091 1.69
4County 40 0 4C21STP(R) 210 0 21C
250 0 25
Close project
This project proposes to reconstruct approximately 1.64 miles of roadway from the Urban Boundary to Wellesley Ave. with 4" of HMA and 10" of cement modified soil. Minor drainage improvements will be included in the contract. Striping and signage for bicycles will be added as well as 962' of sidewalk on the east side of Argonne Road.
3
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
12 Minor Urban Projects I 06 S
100County 10010 10 80C
10010 10 80
Prelim. Engineering, Right-of-Way, Construction
Minor improvements at various locations.
ProjectsUrban Construction Total: 3186141,7721,076 3,046568 166 3,780
4
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
Pathway Construction13 Wellesley Avenue Sidewalk Project 3154 I 01 S TCGPW
14 Wellesley Avenue Haravrd Road Arden Road 05250 0.14
108County 1088 27 73C175SP 17518 0 157C
28326 27 230
Prelim. Engineering, Right-of-Way, Construction
Construct Sidewalks from Harvard Road to Arden Road on Wellesley Ave. in front of Otis Orchards School, add curb, widen pavement and provide drainage swales.
14 Whitworth Drive Sidewalks 3127 I 01 S TCGPWSWhitworth Drive 770'E of Waikiki Rd. College Entrance Ro 05285 0.29
72County 729 0 63C162SP 1620 0 162C
2349 0 225
Prelim. Engineering, Construction
Construct cement concrete sidewalks along the North side of Whitworth Drive.
15 Centennial Trail at Argonnne Road 3122 I 01 S
26STP(E) 2626 0 0C
2626 0 0
Prelim. Engineering
Grade separate trail at Argonne Road by going under the north abutment of the Argonne Road bridge.
5
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
16 Wandermere Road Pathway 3097 I 01 S TCGPWS07 Wandermere Road Children of Sun Crossin Dartford Drive 05199 0.56
17 Dardford Drive 00823 0.12
60County 6012 0 48C185STP(E) 1850 0 185C
24512 0 233
Prelim. Engineering, Construction
This project will construct a ten foot wide separated shared use pedestrian pathway along the east side of Wandermere Road from Farwell Road to the intersection of Dartford/Wandermere Rd. and on the north side of Dartford Road from Wandermere Rd to the Mill Rd/Dartford/Little Spokane intersection.
17 Arterial Sidewalks & Pathways I 06 S
40County 405 0 35C
405 0 35
Prelim. Engineering, Construction
Construct sidewalks along various arterials
ProjectsPathway Construction Total: 280337211 72378 27 828
6
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
Road Improvement Districts18 Greenwood 2012 R 183 I 01 S TCGP
09 Greenwood Rd Flint Road Grove Road 01566 2.06
7County 77 0 0C37RID Bonds 3737 0 0C
4444 0 0
Administration/PE
Improvement to be within the existing roadway footprint. Goal is to achieve a 24 foot pavement width plus gravel shoulders throught a majority of the project. Pave with 2" HMAS atop 2' CSTC to finsih width of at least 22' with (2) 1 foot gravel shoulders. Pave residential driveway approaches with HMA to approximate ROW / property line.
19 Chase Road RID R 181 I 06 S TCGP09 Chase Rd Mission Ave North End of Road 00643 0.41
19County 1919 0 0C
1919 0 0
Administration
Improve Chase Road from Mission to the public cul-de-sac by paving a 26' strip with gravel shoulders with minimum 2" HMA over 2" CSBC. Pave driveway approaches to the right-of-way line. Two new approaches need to be built if owner obtains approach permit, provides culvert if needed, roughs in driveway on the property, and executes an agreement to allow work on private property to construct the approach. Paved approach from north end of cul-de-sac onto Chase Lane is needed. Stabilization of embankment at south end and west side of project will be necessary.
20 Various RID Projects I 03 SVarious roads 0.00
15County 1515 0 0C85RID Bonds 8585 0 0C
100100 0 0
Prelim. Engineering, Construction
Reconstruct gravel roads.
7
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
ProjectsRoad Improvement Districts Total: 41122 0163 0 163
8
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
Traffic Safety Improvements21 Hangman Valley Road Safety Improvement Project 3158 I 03 S TCP
08 Hangman Valley Rd MP 2.76 MP 3.31 1717 0.55
26STP(S) 260 0 26C
260 0 26
Construction
This project will replace non-standard guardrail and improve the roadway signage and delineation of hangman Valley Road from MP 2.76 to MP 3.31
22 Madison Road Safety Improvement Project 3159 I 01 S TCP08 Madison Road MP 4.06 MP 4.59 02923 0.51
17STP(S) 170 0 17C
170 0 17
Construction close out
This project will install guardrail, signage improvements and add delineation on Madison Road between MP 4.08 and MP 4.59 just south of Dishman Mica Road.
23 Magnesium Road Safety Improvements Project 3160 I 01 S TCGPWS16 Magnesium Road 1,600 East of Crestline Regal Street 02934 0.36
14STP(S) 140 0 14C
140 0 14
Construction
This project will install standard guardrail and improve the roadway signage and delineation on Magnesium Road from 1,600 feet east of Crestline to Regal Street.
24 Wellesley Ave. Safety Project - Murray Rd to Starr 3161 I 06 S TCGPWS16 Wellesley Ave. Muray Road Starr Road 05250 0.24
31STP(S) 310 0 31C
310 0 31
Construction
This project will construct widening on Wellesley Ave. from Murray Rd. to Starr Rd. to allow for a two-way-left-turn lane. Roadway section will include 2 - 11' through lanes, an 11' two-way-left-turn lane and 6' paved shoulders. Appropriate signing and pavement markings will be installed.
9
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
25 Linwood ADA Ramp Improvements 3176A I 03 SVarious 0.00
152County 1520 0 152C
1520 0 152
Construction
Construct new or improve existing curb ramps to current ADA standards at various locations.
26 ADA Ramps on 57th Avenue & Mill Road 3176B I 03 S16 57th Avenue Perry Palouse Highway 06002 1.76
16 Mill Road Hastings Road Addison Street 03036 1.05
152County 1520 0 152C
1520 0 152
Construction
Reconstruct ADA ramps to current standard.
27 Safety Improvement Projects I 12 SVarious roads
20County 205 5 10C
205 5 10
Prelim. Engineering, Right-of-Way, Construction
Minor traffic safety improvements at various locations.
ProjectsTraffic Safety Improvements Total: 32488 4025 5 412
10
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
Bridge Construction28 Seven Mile Road Bridge #1602 Replacement Project 3164 I 09 S T
07 Seven Mile Road Br 1602 Over Coulee Cr 04444 0.07
53County 5348 5 0C213BR 213211 2 0C
266259 7 0
Prelim. Engineering, Right-of-Way
This project will construct a new prestressed concrete bridge in the footprint of the existing bridge. The new bridge will be approximately 40 ft. wide and 70 feet long with no major changes in the existing alignment.
29 Elliot Road Culvert Replacement 3169 I 03 S TGP09 Elliot Road at MP 0.005 01140 0.00
450County 4505 0 445C200Other State 2000 0 200C
6505 0 645
Prelim. Engineering, Construction
Replace failed 6 foot diameter culvert carrying DeadmanCreek under Elliot Road at Mt. Spokane Park Drive (SR 206) with the most cost effective structure meeting environmental requirements.
30 Bruce Road Bridge No. 3604 3126 I 03 S
404County 4040 0 404C1,616BR 1,6160 0 1,616C
2,0200 0 2,020
Construction
Proposed is a new prestressed concrete bridge approximately 100 feet long and 40 feet wide. The existing will be removed and the new constructed in it's footprint. No horizontal alignment change is anticipated. The vertical alignment will be studied.
11
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
31 Shady Slope Bridge #3710 Scour Mitigation 3181 I 06 S TGPO
100County 10015 0 85F
10015 0 85
Prelim. Engineering, Construction
Stabilize the existing bridge foundation by pressure grouting the void under the footing to restore bearing. This will be followed by placing rip rap in the channel bottom. The wingwall at the NW corner will be removed and replaced. The wing wall at the SE corner will be stabilized.
32 Christensen Road Bridge No. 1507 3155 I 03 S T
20County 200 20 0C
200 20 0
Right-of-Way
Replace bridge.
33 Little Spokane Bridge #3602 3085 I 03 S16 Little Spokane Drive Little Spokane River Cro 02570 0.01
3County 30 0 3C17BR 170 0 17C
200 0 20
Close project
Replace existing bridge.
34 Small Bridge Improvements I 11 SVarious roads.
25County 255 0 20C
255 0 20
Prelim. Engineering, Construction
Bridge improvements at various locations.
12
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
ProjectsBridge Construction Total: 1,0552001,846 2,790284 27 3,101
13
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
Rural Construction35 Old Trails/Inland Road Gravel Road Reconstruction 3149 I 03 S
07 Inland Road MP 0.39 Old Trail Road 02035 0.10
07 Old Trails Rd Inland Road Marchand Lane 3522 1.51
24County 2424 0 0C154CMAQ 154154 0 0C
178178 0 0
Prelim. Engineering
Reconstruct and widen to 36 feet from MP 0.39 to Marchand Lane.
36 Bigelow Gulch/Forker Connector - Project 2 2620 I 03 S PT07 Bigelow Gulch Road Urban Boundary East Weile Road 00263 1.32
1STP(R) 11 0 0C9RAP 99 0 0C
1010 0 0
Prelim. Engineering
Reconstruct and widen to four lanes with shoulders.
37 Bigelow Gulch/Forker Connector - Project 3 2924 I 03 S PT07 Bigelow Gulch Road E. Weile Road Jensen Road 00263 1.20
5County 55 0 0C
55 0 0
Prelim. Engineering
Reconstruct roadway and widen to four lanes with shoulders.
14
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
38 Bigelow Gulch/Forker Connector - Project 4 2989 I 03 S TGP07 Bigelow Gulch Road Old Argonne Road Forker Road 00263 2.91
52County 5227 25 0C467RAP 467242 225 0C
519269 250 0
Prelim. Engineering, Right-of-Way
Reconstruct and widen to a 4-lane road with 8-foot shoulders and a 12 foot median.
39 Bigelow Gulch / Forker Road Interchange 2989A I 03 S TCGP
56County 5631 25 0C475RAP 475225 250 0C
531256 275 0
Prelim. Engineering, Right-of-Way
This project will construct a portion of the Bigelow Gulch project at the existing Forker intersection. A structure will be constructed for Bigelow traffic to pass over Forker traffic to eliminate left turning traffic on Bigelow Gulch Road. Connections to existing Bigelow Gulch Road west near Evergreen Road and east of Forker will be made to provide a driveable link.
40 Bigelow Gulch/Forker Rd - ROW Mitigation - Rural 3147 I 06 S
246County 2460 246 0C
2460 246 0
Right-of-Way
Mitigate ROW issues in accordance with rules & regulations.
15
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
41 Appleway Avenue & Spokane Bridge Road Trailhead 3171 I 01 S
6County 66 0 0C35Other Fed 3535 0 0C
4141 0 0
Prelim. Engineering
Provide a new access to the trailhead parking area and Pave additional parking area for a total of 30 parking spaces and pave walkway. Provide bicycle parking, bollards, landscaping and traffic calming.
42 Bruce Road Bridge Approaches 3153 I 09 S G07 Bruce Road MP 1.59 on Bruce Road MP 1,83 on Bruce Ro 00481 0.24
527County 5270 0 527C173BR 1730 0 173C
7000 0 700
Prelim. Engineering, Right-of-Way, Construction
Construct approach for Bruce road Bridge #3604 including the realignment of Bruce Road both horizontally and vertically. Typical cross section includes two 12 fot lanes and 8 foot shoulders along Bruce Road.
43 Bigelow Gulch EA Reevaluation 3178 I 13 S
7County 77 0 0C43STP(R) 4343 0 0C
5050 0 0
Prelim. Engineering
Perform required reevaluation.
44 Jackson Road Culvert Replacement Project I 03 SJackson Road MP 2.35 Oclair Creek 02103 0.00
265County 26525 0 240C
26525 0 240Replaced damaged culvert.
16
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
45 Bruce Road - Stoneman Road to Peone Road 3165 I 06 S TCGP07 Bruce Road Stoneman Road Peone Road 00481 0.76
5County 50 0 5C35STP(R) 350 0 35C
400 0 40
Close project
This project will grind the existing asphalt and reuse the grindings in a 10" CTB and resurface the roadway with 4" of HMA.
46 Bruce Road - Peone Road to Day Mt Spokane Road 3168 I 06 S TCP07 Bruce Road Peone Road Day Mt Spokane Roa 00481 2.51
11County 110 0 11C69STP(R) 690 0 69C
800 0 80
Close project
This project will construct a cold in place recycle for the travel lanes and place a 4" HMA overlay over the total roadway including the shoulder areas.
47 Minor Rural Projects I 03 SVarious roads 0.00
100County 10010 10 80C
10010 10 80
Prelim. Engineering, Right-of-Way, Construction
Minor improvements at various locations.
ProjectsRural Construction Total: 1,304951510 1,140844 781 2,765
17
Func Class
Program Item
Project Name Road Names Work Scope
Status Proj #Envir
Len(mi)Work Type
CO
FundStat
TotalP.E. R.W. ConstFed
FundsState Funds
Other Funds
County Funds
Division of EngineeringDepartment of Public Works
Six Year Transportation Improvement Program
Dollars in thousands
Road # From To Fund Source WorkMet
2014 Construction Program
Fund Sec
Amended
Hearing Date: 5/13/2014 Adoption Date: 5/13/2014
Env. Assess. Date Resolution No. 14-0418
2014 2019-
Total Program for 2014 3,3227363,2603,731 8,1011,942 1,006 11,049
18