Highlights of Heavy Haul Railway Line Construction in Arid Regions
Saudi Railway (SAR) Projects
Saudi Railway (SAR) ProjectsCTW 100 & CTW110
CTW110
CTW100
Introduction
North–South Railway (NSR) Project connects Qurayyat / Al Jalamid in the North of the Kingdom with Ras Al Khair in the East via Hail and Az Zabirah through a single-track railway line.The main aim of this project is to transport Phosphate ore from the mines situated in the North and Bauxite ore from Az Zabirah to the industrial complex in the East (Ras Al Khair).
Saudi Railway (SAR) Projects
CTW 100
CTW 110 The main aim of this project is to connect Ras al Khair to Jubail Industrial City.
Description CTW 100 CTW 110
Track Length 741.672 km 90.685 km
Earthwork – Railways (Cut & Fill)
42.048 million m3
08.049 million m3
Earthwork – Roads 6.822 million m3 02.907 million m3
Subgrade 3.502 million m3 0.943 million m3
Subballast 2.002 million m3 0.328 million m3
Ballast 1.705 million m3
0.209 million m3
Concrete Sleepers 1,236,367 Nos. 174,774 Nos.
Culverts (Box & Pipe) 594 Nos. 62 Nos.
Bridges (UR) 15 Nos. 05 Nos.
Camel Crossings 11 Nos. 01 Nos.
Projects Overview
Saudi Railway (SAR) Projects
CTW-110 Project is very unique in terms of 104 Interface Utilities to be dealt with before Track Laying.
Saudi Binladin Group Experience
Saudi Railway (SAR) Projects
Logistics
Saudi Railway (SAR) Projects
LogisticsRail Transportation & Storage Ballast Transportation
Ballast Transportation by Train
Saudi Railway (SAR) Projects
Km000Zabirah
570 kms, 09 Camps
km38
Sub Camp Zabirah
km110
Sub Camp Samuda
km283
Sub Camp Hira
km349
Sub CampSaeriyah
km501
Sub CampTrack Works
km244
Sub CampStructures
km487
Sub Camp Naeriyah
km559
Sub Camp MBLC
km188
Main Camp
Km570
Saudi Railway (SAR) ProjectCTW 100
Dedicated Communication System
Km000Zabirah
Km555Ras Al Khair
88 110 152188
225 288311
344 368 404 439492
Km570
Saudi Railway (SAR) ProjectCTW 100
Thank you for your attention!
Saudi Railway (SAR) ProjectCTW 110
80 kms, 03 Camps
Earthwork
Saudi Railway (SAR) Projects
Rock BlastingRemoval of Cut Material
Embankment Work
Saudi Railway (SAR) Projects
Saudi Railway (SAR) Projects
Removal of Cut Material
Thank you for your attention!
Saudi Railway (SAR) Projects
Deep Sabkha Treatment by Dynamic Replacement Method
Subballast Subballast Placement by CMI Auto Graders
Saudi Railway (SAR) Projects
Structures
Saudi Railway (SAR) Projects
CULVERTS
Saudi Railway (SAR) Projects
CULVERTS
Saudi Railway (SAR) Projects
Km000Zabirah
Km555Ras Az Zawr
Km570
CTW 100 Bridges & Camel Crossings
UR2158+795
UR1 110+953
UR3188+354
UR5A244+292
UR6A 282+656
UR7A 317+142
UR12342+721
UR 4368+957
UR 8A374+428
UR 13 405+502
UR 6475+520
UR 14499+750
UR 9514+391
UR 10528+342UR 11A
435+887
Bridges15 Nos.
CC1 06+140
CC2 36+900
CC3 72+325
CC4 129+150 CC5
222+935 CC6 265+525
CC7 297+100
CC8 362+750 CC9
381+000 CC10 428+500 CC11
453+375
Camel Crossings11 Nos.
Saudi Railway (SAR) ProjectCTW 100
BRIDGE Pile Works
Saudi Railway (SAR) Projects
BRIDGES
Saudi Railway (SAR) Projects
Camel Crossings
Saudi Railway (SAR) Project
Track Works
Saudi Railway (SAR) Projects
Sleeper Production Facility
Saudi Railway (SAR) Projects
Track yard
Track Storage yard / Welding yard Turnout Assembly
Saudi Railway (SAR) Projects
Track Laying by CPG500 Machine
Track Laying
Saudi Railway (SAR) Projects
Track laying at Night
Saudi Railway (SAR) Projects
Tracks in Marshalling yard
Saudi Railway (SAR) Projects
Siding Tracks
Saudi Railway (SAR) Projects
Fencing
Saudi Railway (SAR) Projects
Challenges
Saudi Railway (SAR) Projects
High Fill i.e upto 33 meters
Construction of High Embankment
Saudi Railway (SAR) Projects
INTERFACE ISSUE – Multiple High Tension Lines Electric with Short Distances
Saudi Railway (SAR) Projects
INTERFACE ISSUE – 16 ARAMCO Pipe Lines in 400m (Sabkha Location-1)
Saudi Railway (SAR) Projects
INTERFACE ISSUE – 06 ARAMCO Pipe Lines in 85m Length (Sabkha Location-2)
Saudi Railway (SAR) Projects
INTERFACE ISSUE – 03 SWCC Pipe Lines in 25m
Saudi Railway (SAR) Projects
26 km Deep Sabkha Areas at CTW-110
Saudi Railway (SAR) Projects
Inclement Weather / Sand Storm
Saudi Railway (SAR) Projects
Saudi Railway (SAR) Projects
Wind Blown Sand – Impact on Train Operation
Saudi Railway (SAR) Projects
Passing through Moving Sand Dune Areas
Braving the Elements
Saudi Railway (SAR) Projects
Broom Cleaning the Track
Saudi Railway (SAR) Projects
Sand Protection Solutions – Barrier Fence
Saudi Railway (SAR) Projects
Sand Cleaning between the tracks by Sand Removal Machine
Saudi Railway (SAR) Projects
Sand Removal from Slopes
Saudi Railway (SAR) Projects
Construction of Dikes to Mitigate Sand Encroachment
Saudi Railway (SAR) Projects
Sand Mitigation in CUT area through Dikes behind the back slopes
Saudi Railway (SAR) Projects
Thank you for your attention!
Saudi Railway (SAR) Projects
Walk Through Inspection of Embankment !
Track Inspection !
Saudi Railway (SAR) Projects
TRACK IN USE
Saudi Railway (SAR) Projects
SAR Mineral Train at Fuel Station
Saudi Railway (SAR) Projects
SAR Mineral Train Passing under UR Bridge
Saudi Railway (SAR) Projects
SAR Mineral Train Approaching High Embankment area
Saudi Railway (SAR) Projects
SAR Mineral Train on High Embankment area
Saudi Railway (SAR) Projects
SAR Mineral Train passing through Sand Dune Area
Saudi Railway (SAR) Projects
SAR Mineral Train on Curve
Saudi Railway (SAR) Projects
SAR Mineral Train on the Way to Ras Al Khair
Saudi Railway (SAR) Projects
SAR Phosphate Wagons near the Phosphate Unloading Hoppers
Saudi Railway (SAR) Projects
Thank you for your attention!
Saudi Railway (SAR) Projects
Thank You