-
7/24/2019 DRACUT NED map shown on top of older USGS map
1/2
-
7/24/2019 DRACUT NED map shown on top of older USGS map
2/2
NED-N-0100
NED-N-0200
NED-N-0200 NED-TAR-N-0100
NED-TAR-N-0300
NED-TAR-N-0200
HILLSBOROUGHCOUNTY
ESSECOUN
MIDDLESEXCOUNTY
MASSACHUSETTS
NEW HAMPSHIRE
DRACUT
TEWKSB
URY
DRACUT
METHUEN
DRACUT
PELHAM
DRACU
T
LOWELL
TEWKSBURY
ANDOVER
BEGIN SEGMENT N
MP - 0.0
1.5
1.0
0.5
L A WR E N C E ,M A -
Q U A D
L O WE L L ,M A -Q
U A D
TENNESSEE GAS PIPELINE COMPANY, L.L.C.TENNESSEE GAS PIPELINE COMPANY, L.L.C.
NORTHEAST ENERGY DIRECT PROJECTNORTHEAST ENERGY DIRECT PROJECT
PAGE:
REVISION:
APPROVED B
REV. DATE:
10192015
-1117
-AMS
-000
DRAWN BY:
1:24,000ABSOLUTE SCALE:
1 IN = 2,000 FEETREFERENCE SCALE:
CHECKED BY
DESC:
150L ower Westfield Rd.Holyoke,MA 01040Ph: (413) 535-0135 Fax: (413) 535-0136
MIDDLESEX & ESSEX COUNTIES
MAP COMPILED USING THE MOST CURRENT QUADRANGLE MAP AVAILABLE FROM THE U.S GEOLOGICAL SURVEY (USGS).
MASSACHUSETTS
G:\KinderMorgan\339501_
NEDProject\DataProd\Work\GIS\MXD\FERC
_MAPBOOKS\November_2015_
Filing\Quad_
Mapbooks\NED_
LYNNF
IELD_
LATERAL_
QUAD_
MAPBOOK.mxd
2,000 0 2,000 4,0001,000FEET
SEGMENT NSEGMENT N/LYNNFIELD LATERAL QUAD MAPBOOKLYNNFIELD LATERAL QUAD MAPBOOK
") MILE POST
PROPOSED NORTHEAST ENERGY DIRECT
LYNNFIELD LATERAL - SEGMENT N CENTERLINE
PROPOSED NORTHEAST ENERGY DIRECT
PIPELINE CENTERLINE
PROPOSED ACCESS ROAD
NED: Proposed Access Road
EXISTING TGP PIPELINE
PROPOSED CONTRACTOR YARD
NED: Proposed Contractor Yard
MUNICIPALBOUNDARY
COUNTY BOUNDARY
STATE BOUNDARY
USGS QUADRANGLE BOUNDARY
1
SEE PAGE 2
*Temporary Access Roads are depicted to the edge of the temporary workspace which is not shown.When an access road meets up with a public right of way, it begins at the public roads easement .
*
Maritimes
TB-L-02
MLV-L-01
Haverhill Check
PR-K-01
MLV-K-01
PL-N-01
MLV-N-01
MLV-P-02
PB-P-01
MLV-P-01