DUBAI RAPID LINK CONSORTIUM
WS Atkins & Partners Overseas
Dubai Metro Project
Viaduct Superstructure – Calculations
Storage & Stacking of Standard Twin Track Segments
Submission of Calculations
July 2006
![Page 2: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/2.jpg)
![Page 3: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/3.jpg)
Dubai Metro Project – Viaduct Superstructure CalculationStorage & Stacking of Standard Twin Track Segments
WS ATKINS & PARTNERS OVERSEAS
Date: 03 July 2006Document No.: DM001-E-ACW-CVI-DR-DCC-318020
Rev: A1
Client:
JT Metro JV
Contract No. (if any):
Project Title:
Dubai Metro, UAEProject No.:
JRD4561
Document No.:
DM001-E-ACW-CVI-DR-DCC-318020 Controlled Copy No.:
Document Title:
Viaducts Superstructure – Calculations
Storage & Stacking of Standard Twin Track Segments
Covering Letter / Transmittal Ref. No.: Date of Issue:
03 July 2006
Revision, Review and Approval/Authorization Records
01 Issue to JVNigel Hewson03 July 2006
J. SundaramJuly 2006
Bruce ManeyJuly 2006
Revision DescriptionPrepared by /
dateReviewed by /
dateApp. or Auth.
by / date
Distribution (if insufficient space, please use separate paper)
Controlled Copy No. Issued to
1 JT Metro JV
2 Atkins (Office Copy)
Note: App. and Auth. mean “Approved” and “Authorized” respectively.
![Page 4: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/4.jpg)
Page 1
CONTENTS
1. INTRODUCTION ............................................................................................................ 2
2. DESIGN CHECK............................................................................................................. 2
3. RESULTS........................................................................................................................ 3
4. CONCLUSIONS.............................................................................................................. 4
APPENDICES
A. Layer storage of the segments
B. Segment stacking calcs carried out by Atkins (Dubai)
C. FE Models used in analysis and output of results
D. 20m span FE model deflections – for comparison
![Page 5: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/5.jpg)
Page 2
1. INTRODUCTION
The attached report provides the flexural stresses and permanent deformations in
the segments, for single-level stacking and for double stacking.
This report has to be read together with “Segment Stacking.pdf” previous
submitted and included in appendix B.
2. DESIGN CHECK
A FE analysis of the segments has been carried out in order to check the flexural
stresses and the permanent deformations.
Two different models have been analysed; the first model took into account a
typical mid-span segment of the simple span, the second one a typical pier
segment of the simple span. These models are shown in appendix B.
The disposition of the supports was in accordance with the sketches in the
“Segment Stacking.pdf” report, included in appendix A.
For each model two load-cases have been analysed:
Self-weight only (single level stacking)
Self-weight + concentrated loads due to the double stacking.
Appendix C shows the typical location of the supports and concentrated load
applied into the models.
The analysis has been carried out considering:
Concrete grade 30MPa
Concrete Unit weight 24.5kN/m3
Reinforcement yield strength 460MPa
Nominal cover to reinforcement 40mm
36m straight span cross sections
Thick shell surface mesh
Once obtained the stress and force distributions from Lusas then the values have
been compared with the BS5400 Part 4 stress limitation:
SLS
Reinforced concrete 0.5 fcu = 0.5 x 30MPa = 15MPa (compression)
0.56 fcu = 3.07Mpa (Tension)
Reinforcement 0.75 fy = 345MPa
Also, a bending moment capacity and crack check for the slab has been done
using SamLeap5 in order to check the maximum bending moments in the slab
obtained from the FE analysis.
![Page 6: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/6.jpg)
Page 3
The permanent deformations have been compared to those obtained for the 20, 28,
32 and 36m straight span analysis, and found to be similar. The plot of deflections
for the 20m span is given in appendix D.
3. RESULTS
See results in appendix C.
i) Deflections – single segment storage
Maximum deflections – 6.9mm in middle of slab for mid-span segment,
– 1.2mm in middle of slab for pier segment.
This is a short term deflection based on short term “E” value.
The segments could be stored for a 2 or 3 months and during this time it is
unlikely that more than 20% of the creep will occur, giving creep movements
approximately 1.5mm. All the stored field segments should creep a similar
amount and when erected this should not be a problem.
The pier segment deflection at the middle of the slab is approximately 5mm less
than the adjacent field segments. This is not a problem in the storage of the
segments but the joint may need to be aligned during the erection to match the
shear keys.
ii) Deflections – double stacking of segments
As the supports of the upper segment are always directly above the supports of the
lower segment then no additional deformations should be imposed on the lower
segment.
The analysis shows a slightly different deflection between the single stored
segment and the double stacked segments, and this is caused by the
approximations and simplifications for the supports and applied load.
iii) Stresses
The stresses set up in the segments due to storing a single segment or double
stacking are shown in the plots in appendix C.
These stresses are catered for in the bending and shear check and design.
iv) ULS shear check
Refer to previous calcs in appendix B.
v) Bending check
Transversely, the bending moments are similar to the dead load moments set up in
the permanent structure and the reinforcement provided will be adequate.
Along the edge-beams, the longitudinal tensile stresses generating from bending
will need to be catered for by the reinforcement present.
![Page 7: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/7.jpg)
Page 4
Considering the tensile stresses, maximum total tension force at the top of the
edge beam (hogging over the single support) the total tension force = 17.1 kN
(stress x area from stress plots) SLS
To limit crack widths, the stress in the reinforcement at SLS will be limited to 200
N/mm2.
Therefore required area of reinforcement = (17.1 x 103)/200 = 85.3mm
2
Considering tension in bottom of the edge beam (sagging between double
supports) the total tension force = 6.2 kN
Therefore required area of reinforcement = (6.2 x 103)/200 = 31mm
2
And considering only 2T12 (Area= 226.2mm2) as the minimum longitudinal bars
provided along the webs, the check is satisfactory.
4. CONCLUSIONS
The checks carried out suggest that the stacking arrangements as shown under
RFI No.: CIVIL/CS-RFI-112-06 is found to be acceptable based on a minimum
strength of 30MPa.
![Page 8: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/8.jpg)
APPENDIX A
Layer storage of the segments
![Page 9: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/9.jpg)
DE ECCHERRIZZANI
DUBAI METRO PROJECT
SUPERSTRUCTURE WORKS
![Page 10: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/10.jpg)
DE ECCHERRIZZANI
DUBAI METRO PROJECT
SUPERSTRUCTURE WORKS
![Page 11: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/11.jpg)
DE ECCHERRIZZANI
DUBAI METRO PROJECT
SUPERSTRUCTURE WORKS
![Page 12: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/12.jpg)
DE ECCHERRIZZANI
DUBAI METRO PROJECT
SUPERSTRUCTURE WORKS
![Page 13: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/13.jpg)
DE ECCHERRIZZANI
DUBAI METRO PROJECT
SUPERSTRUCTURE WORKS
![Page 14: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/14.jpg)
DE ECCHERRIZZANI
DUBAI METRO PROJECT
SUPERSTRUCTURE WORKS
![Page 15: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/15.jpg)
DE ECCHERRIZZANI
DUBAI METRO PROJECT
SUPERSTRUCTURE WORKS
![Page 16: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/16.jpg)
DE ECCHERRIZZANI
DUBAI METRO PROJECT
SUPERSTRUCTURE WORKS
![Page 17: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/17.jpg)
APPENDIX B
Segment stacking calcs carried out by Atkins (Dubai)
![Page 18: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/18.jpg)
![Page 19: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/19.jpg)
![Page 20: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/20.jpg)
![Page 21: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/21.jpg)
![Page 22: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/22.jpg)
APPENDIX C
FE Models used in analysis and output of results
![Page 23: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/23.jpg)
![Page 24: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/24.jpg)
![Page 25: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/25.jpg)
![Page 26: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/26.jpg)
![Page 27: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/27.jpg)
![Page 28: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/28.jpg)
![Page 29: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/29.jpg)
![Page 30: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/30.jpg)
![Page 31: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/31.jpg)
![Page 32: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/32.jpg)
![Page 33: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/33.jpg)
![Page 34: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/34.jpg)
![Page 35: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/35.jpg)
![Page 36: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/36.jpg)
![Page 37: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/37.jpg)
![Page 38: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/38.jpg)
![Page 39: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/39.jpg)
![Page 40: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/40.jpg)
![Page 41: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/41.jpg)
![Page 42: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/42.jpg)
![Page 43: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/43.jpg)
![Page 44: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/44.jpg)
![Page 45: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/45.jpg)
![Page 46: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/46.jpg)
![Page 47: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/47.jpg)
![Page 48: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/48.jpg)
![Page 49: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/49.jpg)
![Page 50: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/50.jpg)
APPENDIX D
20m span FE model deflections (for comparison)
![Page 51: Dubai Metro Project Viaduct Superstructure – …tumcivil.com/engfanatic/content/file/board/36736-dubai.pdfDubai Metro Project –Viaduct Superstructure Calculation Storage & Stacking](https://reader033.vdocuments.net/reader033/viewer/2022051509/5ae99c0a7f8b9a08779131fb/html5/thumbnails/51.jpg)