Download - East River Waterfront Esplanade Package 4
-
7/28/2019 East River Waterfront Esplanade Package 4
1/44
MAY, 2013
tillotson designassociates40 Worth St. Suite 703
NY NY 10013
EAST RIVER
WATERFRONT
ESPLANADE //PKG 4MANHATTAN
FINAL DESIGNMAY 2013
New York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
2/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
EAST RIVER
WATERFRONT
ESPLANADESUB-PROJECTSNew York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
3/44
-
7/28/2019 East River Waterfront Esplanade Package 4
4/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
S UST.
M
OLD
.
WA
S .
AID
NLN
U
T
N
P
CKS
IP
RKTST.
IK
/AL
N
G
I
.
I
.
.
UTHS .
.
IER17
PIER16
IER11
I E R 6
A A
PIER 35ESPLANADE
PACKAGE 3
RUTGERS SLIP
PAVILIONLOCATION
ESPLANADE
PACKAGE 4 UNDER CONSTRUCTION
UNDER CONSTRUCTION
01 RENDERING: ESPLANADE PKG 3 02 RENDERING: ESPLANADE PKG 3 & PIER 35 03 RENDERING: PIER 35
ERWE SUB-PROJECTS //NORTH
New York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
5/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
STANDARDPROJECT
COMPONENTSNew York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
6/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
TRANSITION
TRANSITION
TYPICAL HANDRAIL
LEANING LEDGE
BAR SEATING
5
3
4
2
1
01 ESPLANADE RAILING SYSTEM 02 EXISTING PHOTOS FROM PILOT
ESPLANADE COMPONENTS //UNDULATING RAILINGNew York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
7/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4ESPLANADE COMPONENTS //UNDULATING RAILING
01 ESPLANADE RAILING SYSTEM PLAN // SCALE: 1/4 = 1-0
02 LEAN-OUT SECTION, TYP.SCALE: 1/2 = 1-0
03 STRAIGHT SECTION, TYPSCALE: 1/2 = 1-0
04 LEAN-IN SECTION, TYPSCALE: 1/2 = 1-0
02 03
04CONTINOUS HARDWOOD PLANK
ROUTERED WITH BULL NOSE, TYPICAL
FOR EACH RAILING SEGMENT
INTERMEDIATE STIFFENERS
SPACED AS REQUIRED
1/8 JOINT BETWEEN HARDWOOD
PLANKS
TD LED VERTICAL
LINEAR LIGHTING 7-6 O.C.
TYP.
EDGE OF CONCRETE CURB BELOW7-6 TYP.
1 1/2 THICK PLANK
ROUTERED WITH 7/8
RADIUS BULL NOSE.
INFILL PLANEL ASSEMBLEY:
GALVANIZED STEEL WELDED
WIRE MESH IN 2x 1
STEEL TUBE FRAME.
TD VERTICAL LINEAR
LIGHTING 7-6 O.C.
HEX PAVERS INSTALLED
FLUSH TO CONCRETE CAP.
NEW TOPPING SLAB AT
RAILING POSTS
*ALL STEEL TO BE
HOT DIPPED GALVANIZED
3-6TYP.
1-1 7 1-7
3-6TYP.
3-6TYP.
New York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
8/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
01 PAVING PATTERN CONCEPT
ESPLANADE COMPONENTS //PAVINGNew York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
9/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
01 PRE-CAST CONCRETE PLANTER WALL
02 PRE-CAST CONCRETE PLANTER WALL WITH LIGHT COVE
LIGHT COVE WITH
TYPICAL TS FIXTURE
ESPLANADE COMPONENTS //PLANTER WALLS
1 WIDE RAISED
SKATE DETERRENTS
SPACED 2-8 O.C.
1 WIDE RAISED
SKATE DETERRENTS
SPACED 2-8 O.C.
8-0
16
2-0
8-0
New York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
10/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
02CONVERSATION BENCH SEATING
03 BAR SEATING
ESPLANADE COMPONENTS //SEATING
01 PLANTER WALL SEATING & LOUNGE
04 PICNIC TABLES // GAME TABLES
New York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
11/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4ESPLANADE COMPONENTS //SEATING
02 GAME TABLE
01 TYPICAL SEATING (3) SEAT BENCH
03 BAR SEATING 04 (2) SEAT CONVERSATION BENCH 05 (2) SEAT PLANTER WALL BENCH
SEAT BACK WOOD SLATS:
5 1/2 x 1 1/2
2 1/2 x 1 1/2
1 x 1 1/2
2 1/2 x 1 1/2
WOOD SLATS AT S EAT
ARE CONTINUOUS OVER
ENTIRE LENGTH OF BENCH.
GALVANIZED STEEL SUPPORTS
AND ARM REST(S).
DUCTAL CONCRETE BASE
WITH ACID WASHED FINISH.
New York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
12/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
01 NATIVE PLANTINGS THAT EVOKE A NORTHEAST DUNESCAPE
ESPLANADE COMPONENTS //PLANTINGNew York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
13/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
02 VIEW FROM PIER 15 // ESPLANADE RAILING LIGHTING
ESPLANADE COMPONENTS //LIGHTING
01 VIEW FROM ESPLANADE // FDR GIRDER & PLANTER WALL LIGHTING
03 VIEW FROM LOOKOUT // LOOKOUT LIGHTING
04 VIEW UNDER FDR // FDR UNDERBELLY LIGHTING
05 VIEW FROM ESPLANADE // PLANTER UP-LIGHTING
New York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
14/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
ESPLANADE
PKG 4
S UST.
M
OLD
.
WA
ST.
AID
NLN
U
T
N
P
CK
SLIP
KTST.
.
KE/ALLEN
R
TGE
I
N
I.
.UTHS ..
IER17
PIER16
IER11
I E R 6
IER 6IER42
A A
New York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
15/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
EXISTING
CONDITIONSNew York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
16/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
MANHATTANBRIDGE
CATHERINESLIP
M A R K E T
S L I P
SOUTH STREET
P I K E
S L I P
SOUTH STREET
00 KEY PLAN
01 PANORAMA // VIEW FROM CATHERINE SLIP
02 VIEW SOUTH 03 VIEW NORTH 04 VIEW SOUTH
EXISTING CONDITIONSNew York City EconomicDevelopment Corporation
1
222 3
4
-
7/28/2019 East River Waterfront Esplanade Package 4
17/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
MANHATTANBRIDGE
CATHERINESLIP
M A R K E T
S L I P
SOUTH STREET
P I K E
S L I P
SOUTH STREET
EXISTING CONDITIONS
00 KEY PLAN
01 PANORAMA // VIEW UNDER FDR DRIVE @ MARKET STREET
02 VIEW SOUTH WEST 03 VIEW NORTH 04 VIEW SOUTH WEST
222
3
41
New York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
18/44
-
7/28/2019 East River Waterfront Esplanade Package 4
19/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
PROPOSED
DESIGNNew York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
20/44
T
-
7/28/2019 East River Waterfront Esplanade Package 4
21/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
KEY ACTIVITIES
OUTDOOR EXERCISE EQUIPMENTFISHING //GET-OUT
WATERFRONTGLIDERS
SKATEEQUIPMENT
0 10 20 40 80
New York City EconomicDevelopment Corporation ACTIVITIES PLAN //CATHERINE TO MARKET SLIP
56 64 80
70
12
16 1
5
19
21
BIKE LANESOUTH STREET
MARKET
SLIP
C A
TH
ER
INE
S L
IP
6
13
13
FISHING GET-OUT,
TYP.
WATERFRONT
GLIDERS
ELEVATED EXERCISE
PLATFORM
SKATE EQUIPMENT
T
-
7/28/2019 East River Waterfront Esplanade Package 4
22/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
CONVERSATIONSEATING
BAR SEATING SEAT WALL BENCH ANDCHAISE LOUNGE
PICNIC TABLESBLEACHER SEATING
0 10 20 40 80
BIKE LANE
New York City EconomicDevelopment Corporation SEATING PLAN //CATHERINE TO MARKET SLIP
56 64 80
70
12
16 1
5
19
21
6
13
13
BLEACHER
SEATING
WATERFRONT
BLEACHERS
BAR SEATING SEAT WALLBENCH
BENCH
SEATING
PICNIC
TABLES
WATERFRONT
BLEACHERS
CONVERSATION
SEATING
BAR SEATING
SOUTH STREET
MARKET
SLIP
C A
TH
ER
INE
S L
IP
-
7/28/2019 East River Waterfront Esplanade Package 4
23/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4MATERIALS DETAIL PLAN SOUTH//CATHERINE TO MARKET SLIP
SS CABLERAILING
GALVANIZEDSTEEL
DARK CONCRETEGALVANIZEDBAR GRATING
HEX PAVERS WARNINGPAVERS
RECLAIMEDWOOD(RIKIO)
ASPHALT
01 2 4 8 16 32
New York City EconomicDevelopment Corporation
56 64
70
12
12
16
21
PRE-CAST CONCRETE BLEACHER
SS CABLE RAILING
GALVANIZED OPEN BAR GRATING
HEX PAVERS
BIKE LANE
FDR ABOVE
BAR SEATING
SKATE ELEMENTS
WARNING PAVERS
BIKE LANE WARNING PAVERS
BENCH SEATING
WOOD + GALVANIZEDSTEEL RAILING
GALVANIZED WIDE-FLANGE STEEL
CAST IN PLACEDARK CONCRETE
BIKE RACKS
CONCRETECURB
NEW ASPHALT
PAVEMENT
SOUTH STREET
-
7/28/2019 East River Waterfront Esplanade Package 4
24/44
-
7/28/2019 East River Waterfront Esplanade Package 4
25/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4PROPOSED DESIGN //SECTIONS
A
20100 5
20100 5
B
New York City EconomicDevelopment Corporation
02 SECTION B
01 SECTION A
KEY PLAN
BIKELANE
BIKELANE
NEW ASPHALT
SKATE ELEMENTS
SKATE ELEMENTS
NEW ASPHALT
WATERFRONT GLIDERS
EXISTING FDR DRIVESTRUCTURE, TYP.
EXISTING FDR DRIVESTRUCTURE, TYP.
PRECAST CONCRETEPAVERS TYP.
PRECAST CONCRETEPAVERS TYP.
FISH OUT CANTILEVEREDPLATFORM
FISH OUT CANTILEVEREDPLATFORM
WATERFRONT BLEACHERS
DETECTABLE WARNINGPAVER TYPE 3
BLEACHER SEATING
ESPLANADE RAILING
FIXED SEATING BEYOND
EAST RIVER
EAST RIVER
BIKE LANE
BIKE LANE
SOUTH STREET
SOUTH STREET
FREE SKATE AREA
FREE SKATE AREA
WATERFRONT GLIDER
WATERFRONT BLEACHER
ESPLANADE
ESPLANADE
FISH OUT
FISH OUT
+/- 4-0
+/- 4-0
10-0
10-0
+/- 8-0
+/- 9-0
28-0 (VARIES)
22-0 (VARIES)
12-0
16-0 (VARIES)
1
5-0
+/- 22-0 (15-0 MIN CLEAR)
+/- 23-0 (15-0 MIN CLEAR)
12-0
12-0
0 1 2 4 8 16
0 1 2 4 8 16
-
7/28/2019 East River Waterfront Esplanade Package 4
26/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
01 TYPICAL ESPLANADE LIGHTING SECTION
03 PLANTER WALL LIGHTING02 FDR GIRDER LIGHTING
ESPLANADE COMPONENTS //LIGHTING
PLANTING
PRECAST CONCRETE PLANTER
WALL
SS EDGE ANGLE
LED RECESSED LIGHT FIXTURE
HEX PAVERS
FLUORESCENT LIGHTFIXTURE
FDR GIRDER PAINTEDPURPLE (EXISTING)
FDR DRIVESTRUCTURE
New York City EconomicDevelopment Corporation
ESPLANADE RAILINGLED LIGHT (PROJECTSTANDARD)
TS FLUORESCENT UP-LIGHTS IN CANOPY.
FDR GIRDER LIGHTING(PROJECT STANDARD)
COMPACT FLUORESCENTDOWN LIGHTS(PROJECT STANDARD)
0 1 2 4 8 16
-
7/28/2019 East River Waterfront Esplanade Package 4
27/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4ESPLANADE COMPONENTS //FISHING GET-OUTNew York City EconomicDevelopment Corporation
01 FISHING GET-OUT // AXO 02 FISHING GET-OUT // SECTION
SS CABLERAILING (PROJECTSTANDARD)
GALVANIZED STEELGRATING OPEN TOWATER BELOW
GALVANIZED STEELCANTILEVERED
STRUCTURE
FDR DRIVE
EXISTING BULKHEADLINE
12-0
3-6
0 1 2 4
-
7/28/2019 East River Waterfront Esplanade Package 4
28/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
ESPLANADE COMPONENTS //
URBAN GLIDERSNew York City EconomicDevelopment Corporation
01 URBAN GLIDERS // AXO
03 URBAN GLIDERS // SECTION02 MATERIAL // RED PLASTIC LUMBER
12-0
15-0
URBAN GLIDER WITH
GALVANIZED STEELFRAME AND WOOD
SEAT TO MATCH TYP.
FURNITURE
GALVANIZED STEEL
SUPPORT STRUCTURE
RED PLASTIC LUMBERCANOPY
FDR DRIVE BEYOND
18
18 DARK CONCRETE
HEX PAVERS
6 GLIDER
MOVEMENT
ZONE
0 1 2 4
-
7/28/2019 East River Waterfront Esplanade Package 4
29/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4ESPLANADE COMPONENTS //BLEACHER SEATING
01 BLEACHER // PERSPECTIVE W/ KEY DIMENSIONS
03 BLEACHER // SECTION
New York City EconomicDevelopment Corporation
16-0
ESPLANADE
14
PRECAST CONCRETEBLEACHER SEATING
FDR DRIVE COLUMNBEYOND
14
14
PLANTER SEAT WALLFURNITURE
HEX PAVERS
ESPLANADE RAILING
42
42
-
7/28/2019 East River Waterfront Esplanade Package 4
30/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4ESPLANADE COMPONENTS //EXERCISE EQUIPMENTNew York City EconomicDevelopment Corporation
DOUBLE HIPFLEXER
BODY ROW ROWINGMACHINE
ELLIPTICAL BENCH DIPSTATION
LEG PRESS CHESTPRESS
DOUBLESTRIDER
CARDIOWALKER
8-0, TYP
PICNIC TABLES RAMP @ 1:12
6-0 CLEAR ZONES
02 PROPOSED EXERCISE EQUIPMENT
01 RAISED EXERCISE PLATFORM
-
7/28/2019 East River Waterfront Esplanade Package 4
31/44
-
7/28/2019 East River Waterfront Esplanade Package 4
32/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
MANHAT T A
NBRIDGE
CATHERINESLIP
MA
RKE
TS
LIP
SOUTH STREET
PIKE
SL
IP
SOUTH STREET
New York City EconomicDevelopment Corporation
RENDERING //
VIEW LOOKING NORTH
-
7/28/2019 East River Waterfront Esplanade Package 4
33/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
MANHAT T A
NBRIDGE
CATHERINESLIP
MA
RKE
TS
LIP
SOUTH STREET
PIKE
SL
IP
SOUTH STREET
New York City EconomicDevelopment Corporation
RENDERING //VIEW LOOKING SOUTH
ET
N
-
7/28/2019 East River Waterfront Esplanade Package 4
34/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
KEY ACTIVITIES
TABLE TENNISWATERFRONTGLIDERS
SYNTHETIC TURFPLAY FIELD
New York City EconomicDevelopment Corporation
ACTIVITIES PLAN //MARKET SLIP TO PIKE ALLEN
5672
150
12
30
16
8
16
35
26
WATERFRONT BLEACHERS TABLE TENNISWATERFRONT GLIDERS SYNTHETIC TURF FIELD
0 10 20 40 80
SOUTH STREET
MARKE
SLIP
PIK
EA
LL
EN
S LI P
ET
PN
-
7/28/2019 East River Waterfront Esplanade Package 4
35/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
CONVERSATIONSEATING
BAR SEATINGPLANTER WALL SEATINGAND LOUNGE
PICNIC TABLESBLEACHERSEATING
0 10 20 40 80
New York City EconomicDevelopment Corporation
SEATING PLAN //MARKET SLIP TO PIKE ALLEN
5672
150
12
30
16
8
16
35
26
WATERFRONT BLEACHERS BAR SEATINGPICNIC TABLES PICNIC
TABLES
CONVERSATION SEATING
BAR SEATINGBAR SEATING
BENCH SEATINGPLANTER WALL SEATINGAND LOUNGE
SOUTH STREET
MARKE
SLIP
PIK
EA
LL
E
S LI P
-
7/28/2019 East River Waterfront Esplanade Package 4
36/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
MATERIAL PLAN DETAIL SOUTH //MARKET SLIP TO PIKE ALLEN
GALVANIZEDSTEEL
DARK CONCRETE HEX PAVERS RECLAIMEDWOOD(RIKIO)
PLANTINGWARNINGPAVERS
01 2 4 8 16 32
ASPHALT
New York City EconomicDevelopment Corporation
56
72
12
30
26
16
8
16
GALVANIZED WIDE-FLANGE STEEL
WOOD + GALVANIZEDSTEEL RAILING
TABLE TENNIS
WARNINGPAVERS
PICNICTABLES
HEX PAVERS
NEW ASPHALTPAVEMENT
BIKE PATH
BAR SEATING
CAST IN PLACE
DARK CONCRETE
ESPLANADE FURNITURE ONCONC PLANTER WALL
PRE-CAST
CONCRETEBLEACHER
SOUTH STREET
-
7/28/2019 East River Waterfront Esplanade Package 4
37/44
-
7/28/2019 East River Waterfront Esplanade Package 4
38/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
C D
02 SECTION D
01 SECTION C
KEY PLAN
0 1 2 4 8 16
0 1 2 4 8 16
New York City EconomicDevelopment Corporation
PROPOSED DESIGN //SECTIONS
PRECAST CONCRETEPAVERS TYP.
EAST RIVER
EAST RIVER
PRECAST CONCRETEPAVERS TYP.
PRECAST CONCRETEPLANTER WALLS
LEAN IN BAR RAILING
SS EXTEND MESH & GALVANIZEDSTEEL FENCE
SYNTHETIC TURF
EXISTING FDR DRIVESTRUCTURE, TYP.
EXISTING FDR DRIVESTRUCTURE, TYP.
BIKELANE
SKATE ELEMENTS
BIKELANE
CUSTOM SKATEBOARDFURNISHINGS
PRECAST CONCRETEPLANTER WALLS
ESPLANADE
ESPLANADE
+/- 15-0(15-0MIN CLEAR)
+/- 26-0(15-0MIN CLEAR)
12-8(VARIES)+/-2-8
+/-3-0
+/-3-6
+/-2-6
+/-6-026-0(VARIES)
33-6
10-0
10-0
PLANTERFREE SKATE AREA
MULTI-PURPOSE PLAY FIELD
BIKE PATH
BIKE PATH
8-0
-
7/28/2019 East River Waterfront Esplanade Package 4
39/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
01 TURF FIELD // AXON
02 TURF // SECTION
PROPOSED DESIGN //TURF FIELD
0 1 2 4
New York City EconomicDevelopment Corporation
GALVANIZED STEEL HOLLOWTUBE STRUCTURE
FDR DRIVE COLUMNBEYOND
CARPET TYPE ARTIFICIALTURF PRACTICE FIELD
8-0
GALVANIZED STEEL FRAMESUPPORT FOR MESH
STAINLESS STEEL CABLENETTING GRADIENT W/HEAVIER GAUGE & DENSEMESH AT BASE
HEX PAVERS
GALVANIZED STEEL FRAMESUPPORT FOR MESH
STAINLESS STEEL CABLENETTING GRADIENT W/ HEAVIERGAUGE & DENSE MESH AT BASE
FDR DRIVE COLUMNBEYOND
-
7/28/2019 East River Waterfront Esplanade Package 4
40/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
PROPOSED DESIGN //BIKE RACKSNew York City EconomicDevelopment Corporation
01 TURF FIELD // AXON
BIKEWAY
EDGE OF DETECTABLEWARNING PAVERS
NYCDOT CITYRACK
STANDARD NYCDOTCITYRACK, TYP.
3-6
10-0
O.C.TYP.
-
7/28/2019 East River Waterfront Esplanade Package 4
41/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
PROPOSED DESIGN //SKATEBOARD ELEMENTS
01 MOVEABLE SKATEBOARD FURNISHINGS
01 SKATE ZONE PLAN
BUMP TO PAD/D
MED MULTI COMBOA
CHINA BANKGSLOPED RAIL/LEDGEF
UP-DOWN-UP LEDGEB SML MULTI-COMBOC
CALIFORNIA SKATEPARKSPROVIDED CONSULTING FORLAYOUT AND ELEMENT TYPES.
DOUBLE KINK LEDGEE
New York City EconomicDevelopment Corporation
AD
GFB C
E
01 SHRUBS 02 GRASSES AND PERENNIALS
-
7/28/2019 East River Waterfront Esplanade Package 4
42/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
PROPOSED DESIGN //PLANTING PALETTE
Prunus mar it ima (Beach Plum) I lex g labra Shamrock (Inkberry) Knautia macedonia (Knautia)
Seslaria autumnalis
(Autumn Moor Grass)
Bouteloua gracilis (Grama Grass) Parthenium intergrifolium
Eupatorium dubium Little Joe
(Joe Pye Weed)Schizachyrium
scoparium
(Little Bluestem)
Echinacea pallida
(Pale Purple Coneflower)
Clethra alnifolia Hummingbird
(Summersweet Clethra)
Ceanothus americanus (New Jerse y Tea)
(not all plants shown)03 MINOR TREES
Juniperus Chinensis Torulosa
(Hollywood Juniper) 04 ESPLANADE PLANTERS // PLAN
ESPLANADE
EAST RIVER
TYPICAL ESPLANADE PRE-CAST
CONCRETE PLANTER SEAT WALL
TYPICAL ESPLANADE PLANTING /
SHRUBS, GRASSES & PERENNIALSFDR ABOVE
New York City EconomicDevelopment Corporation
-
7/28/2019 East River Waterfront Esplanade Package 4
43/44
EAST RIVER WATERFRONT
ESPLANADE PKG 4
MANHAT T A
NBRIDGE
CATHERINESLIP
MA
RKE
TS
LIP
SOUTH STREET
PIKE
SL
IP
SOUTH STREET
New York City EconomicDevelopment Corporation
RENDERING //VIEW LOOKING NORTH
-
7/28/2019 East River Waterfront Esplanade Package 4
44/44
EAST RIVER WATERFRONT
MANHAT T A
NBRIDGE
CATHERINESLIP
MA
RKE
TS
LIP
SOUTH STREET
PIKE
SL
IP
SOUTH STREET
RENDERING //