ECE 421 Session 12
Utility SCADA and Automation
Presented by: Chris Dyer
October 05, 2017
![Page 2: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/2.jpg)
• Chris Dyer, P.E.
• BSEE University of Idaho, 1997
• SCADA & Automation Engineer
• POWER Engineers, Inc., SCADA and Analytical Services (SAS) Department Manager, Boise, ID
Utility SCADA & Automation
![Page 3: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/3.jpg)
• S.C.A.D.A
– Supervisory
– Control
– And
– Data
– Acquisition
What is SCADA?
![Page 4: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/4.jpg)
• Transmitting and receiving logic or data (telemetry)
• Monitoring of processes
• Monitoring of equipment health
• Remote control
What is SCADA?
![Page 5: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/5.jpg)
• Ability to manage large systems efficiently
• Area control and balance
• System reconfiguration
• Automation
– Load shedding
– Load transfer
– Reactive compensation
Why SCADA?
![Page 6: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/6.jpg)
• Breaker status
• Analog data
– Voltage
– Current
– Real/reactive power
– Load tap changer position
• Critical apparatus alarms
• Controls
What data?
![Page 7: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/7.jpg)
• Before SCADA– Limited technology
– Local control limiting system size
– Manpower required
– Coordination became difficult
– Slow response
– Conservative operation
– Longer, more frequent outages
SCADA Evolution – Early History
![Page 8: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/8.jpg)
• “Homegrown” custom
• Proprietary systems
– Distributed
– Energy Management Systems (EMS)
– Remote Terminal Units (RTU)
• Discrete hardwired components
– Auxiliary contacts, DC inputs, AC current/voltage transducers with A/D converter
SCADA Evolution – Early History
![Page 9: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/9.jpg)
• Open (non-proprietary) RTUs
• Local Human Machine Interface (HMI)– Traditional annunciator/mimic
– PC based
– Web based
• Communication infrastructure owned or leased
• EMS & associated systems
• Data repository
SCADA Evolution – Recent History
![Page 10: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/10.jpg)
• 1200 baud “Bell 202” standard lease-lines
– Low bandwidth, high availability
• Traditional serial (RS232/RS485)
• Leased broadband circuits
• Microwave (and other RF communications)
• Owned Fiber Optic Networks
– Optical Ground Wire (OPGW)
• Ethernet
SCADA Evolution - Communications
![Page 11: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/11.jpg)
• Set of rules defining the exchange of information utilizing digital data transmission between intelligent devices
• Software communication “languages”
• Hardware “handshaking”
– RTS/CTS/DSR/DTR
SCADA Evolution - Protocols
![Page 12: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/12.jpg)
• Proprietary based on manufacturer• MODBUS industrial communications• DNP V3.00 developed as an “open” protocol
– Heralded in an era of “interoperability”
• UCA– Object-oriented– Self-description
• IEC-61850– GOOSE– MMS– Sampled Values
SCADA Evolution - Protocols
![Page 13: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/13.jpg)
OSI Seven Layer Model
![Page 14: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/14.jpg)
• IED (Intelligent Electronic Device)
– Digital microprocessor relays
– Meters, Battery Chargers, XFMR Monitors, etc.
– Moore’s Law as applied to SCADA
– Communications and database additions
SCADA Evolution – Modern Era
![Page 15: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/15.jpg)
• Communications systems advancement
– Broadband technologies
– Multiplexing
– Interoperability
• Bandwidth capabilities
• Data analytics tools
SCADA Evolution – Modern Era
![Page 16: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/16.jpg)
SCADA = Visibility
![Page 17: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/17.jpg)
SCADA = Visbility
![Page 18: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/18.jpg)
• Where do we go from here?
– “Smart Grid”
– Data analytics - Condition Based Maintenance
– IEC-61850
– Synchrophasors
– Cybersecurity
SCADA Evolution – The Future
![Page 19: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/19.jpg)
• Many definitions driven by marketing
• Demand side data for customer use (“smart” meters)
• Distribution Automation
– Load transfer
– Load shedding/recovery
– Volt/VAR control
The “Smart Grid”
![Page 20: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/20.jpg)
• Digital Substation
– “Fly by wire”
– Networked
– High data availability
– Redundancy
• Distributed Generation & MicroGrids
– Distribution system design
– Protection & stability
The “Smart Grid”
![Page 21: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/21.jpg)
• Definition
– Real time monitoring of apparatus
– Evaluation of data
– Notification
– Automated correction
• Traditional methods
– Time based
– Performance based (failure)
Condition Based Maintenance
![Page 22: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/22.jpg)
• Example: Power Transformer– High cost, long lead
– IED monitoring of:• Dissolved gases
• Partial discharge
• Cooling fan operation
• Operation & stress
– Trend analysis
– “Uprating”
Condition Based Maintenance
![Page 23: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/23.jpg)
• Benefits
– Equipment expenditures
– Labor & resource expenditures
– Operational data
– Event analysis
Condition Based Maintenance
![Page 24: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/24.jpg)
• International Electrotechnical Commission
• Set of standards
– System & project management
– Engineering tools
– Data modeling
– Hardware requirements
– Product lifecycle
– Communication structure
IEC-61850
![Page 25: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/25.jpg)
• Station Bus
– SCADA Protocols
• Manufacturing Message Specification (MMS)
– Protection Protocols
• Generic Object Oriented Substation Events (GOOSE)
• Process bus
– Measurement
• Sampled Value (SV)
IEC-61850 Cont’d
![Page 26: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/26.jpg)
• Object oriented standard for modeling substation and apparatus– Example:
• Logic Node: Circuit Breaker (XCBR)– Data Object: Position (Pos)
» Data Attributes:
• Control type, time
• Status
• Operations counter
• Quality
• Time stamp
IEC-61850 Cont’d
![Page 27: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/27.jpg)
IEC-61850
![Page 28: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/28.jpg)
• Factors impeding adoption– Room for interpretation of standards– Complex with integration of other standards– Integration of different skills sets– Limited interoperability– Brownfield site complexity– Training– Testing & Commissioning– Documentation (logic diagrams, etc)– Trust & confidence
• Technology and standardization will drive the implementation
IEC-61850
![Page 29: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/29.jpg)
• High frequency data sampling
• Time stamped voltage & current phasor measurements
• Synchronized utilizing GPS
• Instability detection
• Post mortem sequence of events
• Potential to allow dynamic power flow monitoring
Synchrophasors
![Page 30: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/30.jpg)
• What is a Micro-grid?
• What does a Micro-grid consist of?
• How is the operation different?
• Special considerations
– Communications
– SCADA
Microgrids
![Page 31: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/31.jpg)
What’s is a Microgrid?
• Limited points of interconnection
• Single controllable entity
• Islanded operation capability
• Black start capability
• Combined Heat & Power
• Renewable sources
• Energy storage
• Power management/load shaping
![Page 32: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/32.jpg)
What’s in a Microgrid?
Grid Critical Loads
Schedulable/Interruptible LoadsPOI
Generation
Energy Storage
Grid Controller
SCADA Interface(s)
![Page 33: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/33.jpg)
What IS a Microgrids?
![Page 34: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/34.jpg)
Where Are Microgrids Found?
• Military bases
• Campuses
• Buildings
• Development districts
![Page 35: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/35.jpg)
Why are People Interested?
• Resiliency
• Renewables
• Asset utilization
![Page 36: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/36.jpg)
• Stuxnet virus – the danger is real
• NERC CIP-14
– Central California physical security attack
• Recent hacks
– Retail industry (Target)
– Federal government (OPM)
– Democratic National Party
• Is your local utility next?
Cybersecurity – The Threat
![Page 37: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/37.jpg)
• NERC (North American Electric Reliability Corporation)
• CIP (Critical Infrastructure Protection)
• Reliability & security
• Critical assets definition
• Compliance & penalties
Cybersecurity – Response
![Page 38: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/38.jpg)
• Policies & procedures
• Training
• Situational awareness
• Configuration management
• Monitor & detection
• Response & recovery
Cybersecurity – Actions
![Page 39: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/39.jpg)
Substation of the future?
![Page 40: ECE421 Session 12 - uidaho.edu · 2017-10-05 · –Manpower required –Coordination became difficult –Slow response –Conservative operation –Longer, more frequent outages](https://reader031.vdocuments.net/reader031/viewer/2022041910/5e67058735068d6a7f1af25f/html5/thumbnails/40.jpg)
• Thanks for your attention