Download - Energy advice
![Page 1: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/1.jpg)
Mark Clemson - Director
![Page 2: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/2.jpg)
•About NWS
•Installation process
•Technical details
•The perfect Renewable project
•NWS supply chain review
In just a single hour the
sun transmits more
energy to the earth’s
surface than the whole
of mankind uses in a year
![Page 3: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/3.jpg)
Time Line
1983
• Camlec Electrical Launched
• Domestic installations
1987
• Electrical sub contractors to British Gas
• M&B breweries
1993• Camlec Electrical and Heating Launched
1995
• Decent Homes programmes central heating & electrical works
![Page 4: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/4.jpg)
2005 New World Solar Launched
A Sustainable
Brand
![Page 5: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/5.jpg)
2011 where are we ?
-1,000,000 Kw hours of Renewable energy every year
-Installations will reduce Carbon Emissions by 350 T per annum
-8000 thousand trainee hours for disadvantaged Job seekers
--20 Trainee placements
-- 23% of workforce employed are disadvantaged job seekers
--Midland Environmental Business Consortium- Business of the year
-- Birmingham Post top 3 sustainable businesses
-- Brand and reputation for integrity
Business on Track
![Page 6: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/6.jpg)
Projects
Summerfield ECO project
-Client Birmingham City Council/family Housing/ Urban Living
Pathfinder
-Largest Retrofit Renewable Energy Project in the UK
Awards:
•National energy efficiency award
•National Housing Federation- west midlands award
•Sustainable housing award- Public sector
•BITC award C02 +
•Euro Cities award- Stockholm 2009
![Page 7: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/7.jpg)
![Page 8: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/8.jpg)
![Page 9: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/9.jpg)
![Page 10: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/10.jpg)
![Page 11: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/11.jpg)
![Page 12: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/12.jpg)
The PV Installation
![Page 13: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/13.jpg)
Step ProcessList of Potential stock supplied by client
Desk top survey ( what houses are obvious “no goes”)
Drive By survey
Engage Tennant or Resident
Installation
End user training and education
G83 Documentation
On going monitoring/phased maintenance
![Page 14: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/14.jpg)
Day 1 Day 2 Day 3 Day 4 Day 5
Erect Scaffold
Roofers
Electrician
Test Commission
End user training
Strike Scaffold
PV installation Mode of Operation and sequence of events
IMPORTANT!
To build trust the tenant must know what is happing,
when, why & who – Stick to it!
![Page 15: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/15.jpg)
Roof Panel non-Integration
A 'retro-fit' mounting system (also referred to
as 'on-roof' and 'non-integrated') is the
simplest and most cost-effective way of
installing a PV system on a building
The mounting system typically consists of a
series of horizontal rails, to which modules are
fixed by a series of clips. The rails are then held
to the roof by regularly-spaced mounts,
chosen to suit the roof type.
The installed retro-fit system runs parallel to the original
roof covering, with a small gap (approx. 50-100mm)
between the roof and the modules. An entry point for
the field cables is required at some point in the building,
but this can be in the most suitable location for
weatherproofing.
![Page 16: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/16.jpg)
Recommendation
•Roof Structural surveys undertaken on sample archetype properties
•Modern day houses more likely to need interventions to strengthen
rafters
![Page 17: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/17.jpg)
Basic Components of PV Installation
![Page 18: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/18.jpg)
DC Isolator
2.5mm2 Clex
SB 1700/Inverter
4mm twin & earth
AC IsolatorAC IsolatorMeter
80A Earth Leakage
30 AmpB16
MCB
Distribution Board
Supply Meter
South Facing Roof Elevation Roof Space Intermediate wiring
Under floorboardsElectrical Hardware
housing
Front room Cupboard
Drawing Title: 52 Gordon Street
Units 1-3, Waterloo Industrial Estate,
Burhill Way, Chelmsley Wood, Birmingham B37
6RF
T: 0121 779 4876
www.newworldsolar.co.uk
Drawings produced by NWSI Client Drawing Title 52 Gordon
Scale NTSProperty Address
52 Gordon Street WVA 27/07/1
0
10 MCIssue Date: 27/07/10
Project Title: Wolverhampton
ECO voids
Rev Date Description DAm CKDDrawing Number: WH/TVC/007651
4 Winaico
w
DC Cables
4 Winaico
230w
![Page 19: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/19.jpg)
![Page 20: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/20.jpg)
![Page 21: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/21.jpg)
•Project Title: Development of Prototype High Efficiency Multi-
Junction Organic PV Solar Cells
•£1,300,000 funding TSB board
•6 Nationwide Consortium members ( including large companies)
Outcomes
Develop 2/3 generation Photovoltaic's including organic PV
Drive costs down and more environmental friendly
NWS role
Market test and inputs to practicalities
Position NWS at the leading edge of PV development.
![Page 22: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/22.jpg)
![Page 23: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/23.jpg)
FITs & RHI Offers a window of opportunity
Environmental, Social and Economic impact
Jobs Fuel Poverty
Fuel Security CO2 mitigation
![Page 24: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/24.jpg)
Carpe diem
“Our reach is limited by our vision. Our vision is
limited by our horizons and our horizons are set
by our ambitions”.
![Page 25: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/25.jpg)
![Page 26: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/26.jpg)
![Page 27: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/27.jpg)
![Page 28: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/28.jpg)
![Page 29: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/29.jpg)
![Page 30: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/30.jpg)
![Page 31: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/31.jpg)
•Through the course of the project it
became clear to NWSI a manufacturer
who could diver :
•continuity of supply through a vertically
integrated product.
•High quality: The manufacturers of the
PV panels would need to use only top-
quality components from top-brand
companies in the PV industry.
![Page 32: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/32.jpg)
![Page 33: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/33.jpg)
![Page 34: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/34.jpg)
![Page 35: Energy advice](https://reader033.vdocuments.net/reader033/viewer/2022052600/55837141d8b42a6d488b516a/html5/thumbnails/35.jpg)