EROSION CONTROLProfessional Development Training
Sean Crimmins, President Brian Barker, Southeastern Consultant
-
• What is TPG GREEN SOLUTIONS -- and Who is involved?
• What does TPG GREEN SOLUTIONS offer?
• How can TPG GREEN SOLUTIONS help you?
TPG Green Solutions is part of the Transmodal Performance Group of
companies.
-
TPG GREEN SOLUTIONS began with a concept and a projectSean Crimmins wanted to translate his years of experience in the GREEN industry into
GREEN consulting services for engineers, developers, and landscape architects
Mt. Vernon Barge Service President, Don Miller, had an erosion problem on his fleeting island, Mt. Vernon Towhead.
Sean provided the perfect solution to the problem and MVBS’s parent company, TPG, helped him form TPG Green Solutions so he could help you,
too.
-
TPG was originated to help reinvent and reinvigorate the Inland Waterway System. Waterside development and services are accomplished through various TPG entities.
TPG and its affiliates continue to grow.
-
Companies that ship via barge enjoy reduced freight cost and lower energy consumption compared with truck or rail. Each TPG company has a significant Green component.
Adding TPG GREEN SOLUTIONS services to the TPG mix was a natural.
-
Demand for GREEN is here to stay
• LEEDS Green Building Certification
TPG GREEN SOLUTIONS was formed to help you navigate the
swirl of needs, requirements, products, and information.
• US EPA NPDES Regulations
• Effluent Limitation Guidelines (ELF’s)• SWPPP’s
• State & Local Code Compliance• Funding Grants
• All the new GREEN products being advertised• Corporate Plans
• Public Outcry
It’s coming at you from all sides and you may not know where to turn!
-
TPG GREEN SOLUTIONS offers you a team of passionate GREEN Industry Professionals here to assist from start to finish with projects in these categories and more:
• Shoreline Stabilization
• Erosion / Perimeter Control
• Wetland Enhancement
• Stormwater Management
• Rain Gardens
• Porous pavement
• Green Roofs and More;
-
As you are also passionate and experienced professionals -- we are here to offer you an opportunity to receive
• Project Assessment and Consultation
• Project Specifications with customized CAD Drawings
• Budget and Installation Support
• Project Peer Review and Industry Forums via secure members-only web access
• Professional Training and Certification with member discounts
• Regional Project Awards with Case Study Development
• GUARANTEED PROJECT SUCCESS with certified products and approved installation
All COMPLIMENTARY with membership in the TPG GREEN SOLUTIONS
Network!
-
The following proven success examples will demonstrate how TPG GREEN SOLUTIONS can help you.
-
VEGETATED COIR LOGS
Vegetated Coir Logs
with Extensive Root
Systems = Survivability
-
Vegetated Coir Logs
Custom Grown to Meet Your Requirements
-
Vegetated Coir Logs
Certified Lot Numbers for Quality Assurance
-
Detailed, Site-specific CAD Drawings are part of our service
-
Wind & Boat Wave Energy Required a Combination or Hard & Soft Armor
Stockpiled Sack Gabions
Placed at Toe of 4 to 6’ Eroded Bank
-
Wind & Boat Wave Energy Required a Combination or Hard & Soft Armor
After Placing & Securing Sack Gabions
16” Vegetated Coir Logs are Placed
-
Wind & Boat Wave Energy Required a Combination of Hard & Soft Armor
After Securing Vegetated Coir Logs, Sack Gabions Top Dressed with Stone
-
Vegetated Coir Logs: Lake Lemon Reservoir Case Study
Installed July 2003; Photographs Taken August 2003 (One Month Old)
-
Vegetated Coir Logs: Lake Lemon Reservoir Case Study
Installed July 2003: Photograph July 2004 (One Year Old)
-
Vegetated Coir Logs: Lake Lemon Reservoir Case Study
Installed July 2003; Photographs Taken August 2008 (5 Years Old)
-
Slope Contouring by VS Engineering, Inc., White River Bank Erosion Control,
Tibbs and Banta Landfill & TEPPCO Petroleum Pipeline,D2 Vegetated Coir Log Systems
Looking southwest along the east bank of the
White River, Indianapolis, Indiana, August 2003.
-
Precise, Site-specific CAD Drawings help ensure success
-
MAY 2003
JULY 2003
AUGUST 2003
NOVEMBER 2003
LOOKING UPSTREAM
-
DECEMBER 2003 MAY 2004
MARCH 2005
LOOKING UPSTREAM
AUGUST 2005
-
JULY 2003
NOVEMBER 2003
MAY 2004
LOOKING DOWNSTREAM
MAY 2004
-
MARCH 2005 AUGUST 2005
AUGUST 2005
-
APRIL 2008APRIL 2008
-
A remarkable variety of native plants for ALL regions is readily available
-
Swamp Creek Whitfield Co. GA: NRCS Grant
-
Top Fall 2003 Bottom Spring 2004 Top & Bottom October 2007
HART REGULATED DRAIN: RICHMOND, IN
-
Top Fall 2003 Bottom Spring 2004 Top & Bottom October 2007
HART REGULATED DRAIN RICHMOND, IN
-
HART REGULATED DRAIN: RICHMOND, IN
-
October 2007
FALL CREEK DAM REMOVAL: INDIANAPOLIS, IN
-
Top and Bottom August 2007 Top Aug. 2007 Bottom Jan. 2008
CAMPBELL’S REGULATED DRAIN: TIPTON, IN
-
County Bridge Stream Relocation Fall 2002
HENDRICKS COUNTY PERMITTING STREAM RELOCATE
-
FILL SLOPE
CUT SLOPE
CUT SLOPE
CUT SLOPE
-
Storm Water Management
Rain Gardens and Bio Swales
-
Rain Garden with Soils
and Underground Structures
in Place
-
Vegetated Coir Logs can be installed year round
-
With Planting Trench Prepared
It’s Time to Place Vegetated Coir Logs
-
Vegetated Coir Logs Placed in Anchor Trench
-
Vegetated Coir Logs
Placed End to End in Anchor Trench
-
Once Placed End to End in Anchor Trench
the Coir Logs are Back Filled
-
Plants are Ready
and Will Survive Drought or Flood Conditions
-
Local Leaders Promote
a Successful Storm Water Management Solution
-
Vegetated Coir Logs with Glacial Stone
for Storm Outfall Protection
-
Plants Help Stabilize Stone and Soils
-
Vegetated Check Dams Help Control Erosion
and Filter Storm Water
-
Vegetated Shorelines can be Incorporated
with Other Landscape Features
-
Vegetated Vertical Green Walls
for Detention Basins & Grade Control
-
Eagle Creek Project: Indianapolis, IN
-
Vegetated Vertical Green Walls for Detention Basins & Grade Control
-
Vegetated Vertical Green Walls for Detention Basins & Grade Control
-
Vegetated Vertical Green Walls for Detention Basins & Grade Control
-
Vegetated Vertical Green Walls for Detention Basins & Grade Control
-
Vegetated Vertical Green Walls for Detention Basins & Grade Control
-
Vegetated Vertical Green Walls for Detention Basins & Grade Control
-
Vegetated Vertical Green Walls for Detention Basins & Grade Control
-
Vegetated Vertical Green Walls for Detention Basins & Grade Control
-
Storm Inlet Sediment Control
-
Perimeter Sediment Control
-
Sediment RemovalDe-Watering Bags, Inlet,
Perimeter & Waterway Controls
-
Sediment Removal
Turbidity Testing
and Documentation
250+ NTU 10 NTU
-
Chicago, Illinois
Winter Shutdown/Armor
HydraCX2 Cotton Fiber Matrix Hydraulically Applied
-
Indianapolis Demo, Super 70
Winter Shutdown/Armor
HydraCX2 Cotton Fiber Matrix Hydraulically Applied
-
Indianapolis Demo, Super 70
Winter Shutdown/Armor
HydraCX2 Cotton Fiber Matrix Maturing
-
Winter Shutdown/Armor
Slope ContouringWaterway Energy Dissipation
-
Winter Shutdown/Armor Sediment Stop
Slope ContouringWaterway Energy Dissipation
-
Rain Gardens for Sediment Capture
and Water Cooling Effects
-
Rain Gardens: Vegetated Coir Bio Logs, Native Seeds & Bionet ECBs
-
Rain Gardens:
Native Seeds and
Vmax SC-250 TRM
at Taylor University
-
Rain Gardens:
Native Seeds,
Vmax SC-250
& Jute at
Super Target
-
Bio Swales: D2 Vegetated Coir Logs,
Vmax SC-250 & Glacial Stone
at Huestis Drain, Ft. Wayne, IN
-
HYDRAWAY Prefabricated French Drain
-
Customized Aluminum Ladder and Access devices, perfectly matched to individual
worksite needs
-
We can help you achieve this same project success. Your membership includes these benefits:
• Project Assessment and Consultation
• Project Specifications with customized CAD Drawings
• Budget and Installation Support
• Project Peer Review and Industry Forums via secure members-only web access
• Professional Training and Certification with member discounts
• Regional Project Awards with Case Study Development
• GUARANTEED PROJECT SUCCESS with certified products and approved installation
All COMPLIMENTARY with membership in the TPG GREEN SOLUTIONS
Network!
-
How can TPG GREEN SOLUTIONS provide all these complimentary services for only $400 per year?
Our representatives work with distributors to assist with client and prospect overflow -- and to make contact with market segments where distributors have little or no penetration.
In all cases, TPG GREEN SOLUTIONS has as its goal to collaborate with distributors -- never to compete with them.
We will customize agreements to ensure there is
• no overlap
• no confusion
-
Thank you for you kind attention.
Now it’s your turn for:
• Discussions -
• Questions -
• Comments -
-
212 West Tenth Street, Suite D-395Indianapolis, Indiana 46202www.tpggreensolutions.com