eaquinn.com860.633.0115 • [email protected]
Est. 1984When Quality Matters
Est. 1984When Quality Matters
Commercial Services forGeneral & Site Contractors
eaquinn.com860.633.0115
Core Competencies• Turf and Athletic Field Installation
• Wetlands Creation
• Erosion Control
• Landscape Installation
• Invasive Plant Removal & Remediation
• Hydroseeding
1
Est. 1984When Quality Matters
Core CompetenciesEst. 1984
When Quality Matters• Mulch Blowing
• Hardscape Installations
• Green Roofs
2
• Irrigation
• Landscape Design
• Value Engineering
3
Est. 1984When Quality Matters
General Contractor: Milton C. Beebe & Sons of StorrsLocation: StorrsProject Scope: • Natural Stone walls • Apple orchard (225 trees) installation • Meadow planting • Sod installation
College Campus Landscape InstallUConn North Hillside Road Entrance
4
Est. 1984When Quality Matters
General Contractor: Bartlett Brainard Eacott of BloomfieldLocation: BloomfieldProject Scope: • Athletic field installation • Tree and shrub installation • Plantings • Wetlands
Landscape & Athletic Field InstallationCREC Museum Academy
5
Est. 1984When Quality Matters
Contractor: Gilbane Construction of Providence, RILocation: South WindsorProject Scope: • Athletic field installation • Trees and shrub planting • Wetland Restoration
Landscape Design & InstallOrchard Hill Elementary School
6
Est. 1984When Quality Matters
General Contractor: Lawrence Brunoli Inc. of FarmingtonLocation: MadisonProject Scope: • Shoreline establishment plantings • Rainwater recapture
Shoreline LandscapingHammonasset Beach State Park
7
Est. 1984When Quality Matters
Contractor: The Associated Construction Co./Property OwnerLocation: BristolProject Scope: • Outdoor terrace • Porcelain pavers • Natural stone walls • Plantings • Irrigation • Sod • Mulch • Sitting walls
Landscape Design & InstallCable Network HQ
8
Est. 1984When Quality Matters
Contractor: Guerrera Construction of OxfordLocation: Manchester/BoltonProject Scope: • Plantings • Erosion control • Hydroseeding
Hydroseeding & Erosion ControlCharter Oak Greenway Bikepath
9
Est. 1984When Quality Matters
Contractor: CE Floyd Co. of MiddletownLocation: NorwalkProject Scope: • Plantings • Lawn installation • Sod
Landscaping and Lawn InstallBridges at Norwalk
10
Est. 1984When Quality Matters
College Campus Landscape InstallUConn STEM Residence Hall
General Contractor: KBE Building Corp. of FarmingtonLocation: StorrsProject Scope: • Trees • Plantings • Erosion control • Sod installation
11
Est. 1984When Quality Matters
Landscape InstallationThe Hearth at Glastonbury Senior Living
General Contractor: FAHS Construction of New YorkLocation: GlastonburyProject scope: • Plantings • Internal courtyards • Irrigation • Wetland mitigation • Detention pond restoration
12
Est. 1984When Quality Matters
Landscape & Athletic Field InstallationWestbrook High/Middle School
General Contractor: Supreme Industries of HarwintonLocation: WestbrookProject scope: • New school landscape installation. • Planted all the trees and shrubs and mulched all the new areas. • Installed new baseball and soccer fields.
General Contractor: Spazzarini Construction of EnfieldLocation: AvonProject scope: • Provided temporary and permanent erosion control for areas along Route 44 • Removed invasive species from the area before work began • Constructed and planted a new wetland basin • Provided plant material for the whole job over the three-year span of the project
Hydroseeding & Erosion ControlAvon Mountain/Route 44
Wetland Mitigation & CreationAvon Mountain/Route 44
14
Est. 1984When Quality Matters
Wetland Mitigation & CreationAvon Mountain/Route 44
13
Est. 1984When Quality Matters
Hydroseeding & Erosion ControlAvon Mountain/Route 44
16
Est. 1984When Quality Matters
Customer: Pond House CaféLocation: HartfordProject scope: • Installed all new patio, terrace and walkways • Majority of materials used were permeable pavers • Formal terrace will be used for public and private events
Hardscape InstallationPond House Café at Elizabeth Park
15
Est. 1984When Quality Matters
General Contractor: Mather Corp. of BloomfieldLocation: GlastonburyProject scope: • Installed plant material for the entire site • Seeded all areas via hydroseeding • Installed baseball field and two soccer fields • Provided mowing and fertilization to bring lawn/fields to final acceptance
Turf & Athletic Field InstallationNayaug Elementary School
17
Est. 1984When Quality Matters
General Contractor: Hammonassett Construction of ClintonLocation: New HavenProject Scope: • Created planting areas at several entrances of the campus. • Installed a paver bus entrance in front of John Lyman Center for Performing Arts. • Installed new landscaping around several entrances/main signs throughout campus.
Hardscape Installation & PlantingsSouthern Connecticut State University
18
Est. 1984When Quality Matters
General Contractor: LTC Construction of New BritainLocation: New BritainProject Scope: • Created new family entertaining area. • Constructed several retaining walls and terraces. • Incorporated the Rock Cats logo into the design of the pavers. • Constructed a playground.
Hardscape InstallationRock Cats
19
Est. 1984When Quality Matters
Customer: Connecticut Office of Policy ManagementLocation: Hartford Project Scope: • Blew in 400 cubic yards of topsoil and mulch into upper plaza. • Installed roughly 5,000 plants. • Served as prime contractor. • 20,000-square-foot area of plantings
Green RoofCT Science Center
20
Est. 1984When Quality Matters
General Contractor: Dimarco ConstructionLocation: Glastonbury Project Scope: • Plantings • Mulch • Lawn installation
New Building Landscape ConstructionHome Depot
21
Est. 1984When Quality Matters
General Contractor: PRA DevelopmentLocation: GlastonburyProject Scope: • Plantings • Mulch • Lawn installation
New Building Landscape Construction455 Winding Brook Dr.
22
Est. 1984When Quality Matters
Contractor: SCT Holdings of GlastonburyLocation: GlastonburyProject Scope: • Hardscape • Plantings • Retaining walls • Flatwork
Plantings & HardscapeGlen Lochen Mall
SustainabilityEnvironmental responsibility is at the forefront of every aspect of E.A. Quinn’s operations. We are active members of the National Association of Landscape Professionals (NALP) and are dedicated to preserving and beautifying the natural resources around us. When you hire us for a project, you get the satisfaction of knowing that we care about the long-term health and beauty of all land and water.
23
Lawn CareWe remove all lawn debris from every property after every job, and we take pride in recycling 98 percent of material we collect. • In-house composting turns all leaf material into rich organic topsoil • Wood material is chipped and sent to mulch suppliers or paper mills • Non-organic material and concrete is crushed and processed to create gravel for road construction
Fertilizer with a ConscienceE.A. Quinn was the first landscape contractor in Connecticut to use Polyon Controlled Release Fertilizer, the only ecologically friendly fertilizer program with proven results. Polyon’s unique slow-release feeding system produces strong, healthy grass with several ecological benefits. • No growth surges means no excess grass clippings • Eliminates nitrate run-off into drains and local and regional waterways • Fewer applications needed
Wetlands ManagementOur extensive experience in developing and managing wetlands includes creating habitats to support insects, reptiles and fish as well as removing invasive species to protect natural wetland habitats.
The OfficeAll of our offices and shop areas have been remodeled to incorporate energy-saving light fixtures, ballasts and bulbs to reduce energy consumption and costs. Our customer billing and vendor accounting departments are converting to a paperless, online system that will increase efficiency and reduce paper usage.
Est. 1984When Quality Matters
Completed Projects
24
Private Construction (continued)Price Chopper, StorrsReflexite, AvonSimon Ford, NorwichSimon Foundation, BloomfieldStaples, Glastonbury & BranfordThe Tannery, Glastonbury Tryon Farms, GlastonburyWalgreens, VernonState & Municipal Projects
State & Municipal ProjectsDay Kimball Hospital, PlainfieldElm Grove Housing project upgrades, West Hartford Falcon Park Flood Storage Area, MeridenFarmington River Trail, FarmingtonGlastonbury Bus Yard, GlastonburyHartford Public Library, HartfordHigganum Streetscape, HigganumHowell Cheney Tech School, ManchesterMetzner Park, HartfordNew Britain RockCats Stadium, New BritainRentschler Field Drainage Improvements, East HartfordRentschler Field South Klondike Parking Lots, East Hartford Silver Lane Roadway Expansion, East HartfordSpencer Street Road Improvements, Manchester Sucker Brook Dam, Winchester Village for Families and Children, Hartford
UniversitiesSouthern CT University, New HavenUConn North Hillside, StorrsUConn STEM Dormitory, Storrs UConn Main Accumulation Area, StorrsUConn UITS Modular Building, StorrsUniversity of Hartford Performing Arts Center, West HartfordUniversity of New Haven Grad Center, OrangeWeslyan University, MiddletownYale Lewis Walpole Library, Farmington
K-12 SchoolsCREC Museum Academy, BloomfieldGreat Path Academy, ManchesterNayaug Elementary School, South Glastonbury Westbrook Middle/High School, WestbrookOrchard Hill Elementary School, South Windsor
DOT/Transportation projectsAvon Mountain/Route 44 Road Reconstruction #04-0123Bridgeport Intermodal Train StationCharter Oak Greenway Bike Path, Manchester-BoltonConnecticut Science Center Rooftop Planting #63-656Derby Bridge Replacement #36-189Falcon Park, Meriden Hammonasset State Park, Madison Howard Ave. I-95 Bridge Replacement #92-0603Kent Bridge Replacement #67-0115Killingworth Rotary #069-0076Litchfield Highway Project #73-173New Haven Bridge Replacement #92-603Old Saybrook Sea Wall Replacement #105-206Old Saybrook Sea Wall #105-208Old Saybrook Train StationPortland road reconstruction project #112-111Westbrook Railroad StationWindham Transit Facility
Private Construction1st NE Credit Union, East HartfordArburg, Rocky HillBelltown, East HamptonThe Bridges at Norwalk, Norwalk Bucks Corner Shopping Plaza, GlastonburyCarrabas Restaurant, West SpringfieldCheshire Academy East Campus Improvements, CheshireChick-Fil-A, West HartfordChildrens Home, CromwellCT River Community Bank, GlastonburyCumberland Farms, Portland & Quaker HillCVS Bloomfield, ColchesterEmeritus, FarmingtonEppendorf, EnfieldFarmington Soccer Facility, FarmingtonFox Run Mall, GlastonburyGlen Lochen, GlastonburyHearth Assisted Living Facility, GlastonburyHoffman Motors, West SimsburyHome Depot, GlastonburyInternational Sports Network, BristolJordan Furniture, New HavenLangan Volkswagen, Glastonbury & VernonLenard Engineering, GlastonburyLorensen Toyota, WestbrookMiddletown Nissan, MiddletownMr. Sparkle Car Wash, West HartfordThe Pond House Elizabeth Park, Hartford
Est. 1984When Quality Matters
Affiliations & Certifications
Affiliations
26
Certifications
International Association of Hydroseeding Professionals
Snow & Ice Management Association
Certified National Concrete Masonry Association Installers
Small Business Enterprise
CT Department of Admin. Services
LandscapeIndustry Certified
ICPI Certified Installer
Supervisory Pesticide License
Certified Green/Live Roof Installer
Unilock Authorized Contractor
Certified Tech-Pro Contractor
Est. 1984When Quality Matters
National Association of Landscape Professionals
International Erosion Control Association
About Management
Ed QuinnTitle: President & Founder
Ed founded E.A. Quinn Landscape Contracting in 1984. Under his leadership, the company has grown to employ more than 65 people
and provides landscaping services throughout southern New England.
Tony IntinoTitle: CFO/COO
Tony brings more than 30 years of diversified operational and financial management experience to E.A. Quinn Landscape Contracting, including
having held prominent positions with a number of well respected companies within the construction/real estate industry.
Fran KnightsTitle: Sales Manager
Knights joined E.A. Quinn as a sales manager in 2018. She has 30 years of experience in sales and marketing, including a stint as vice president
and general manager of Big Fish Promotion in Glastonbury. She has a bachelor’s degree from Rhode Island College.
25
Est. 1984When Quality Matters
Matt BagshawTitle: Operations Manager
Matt has more than 20 years experience in the landscaping business.He has a degree in turf science from the University of Connecticut
and is very involved in various landscaping associations, including a position on the NALP Government Affairs Committee.
Kyle DoolittleTitle: Estimator/ Business Development Associate
Kyle has more than 15 years of experience in the estimating and business development field, within both the commercial and
residential markets. Kyle is a graduate of Delaware Valley College with a bachelor’s degree in ornamental horticulture, in addition to holding a number of industry certifications.
Scott PinneyTitle: Landscape Maintenance Manager
Scott has 19 years experience. He currently manages our lawn maintenance and fertilization portfolios.