Page 1: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Experimental investigation of the behaviour

of pinned beam–to–column connections to

pure shear monotonic and cyclic excitation

SAFECASTPERFORMANCE OF INNOVATIVE MECHANICAL CONNECTIONS IN

PRECAST BUILDING STRUCTURES UNDER SEISMIC CONDITIONS

SERIES Workshop 2 September 2010, Ohrid

pure shear monotonic and cyclic excitation

I. N. Psycharis, H. P. Mouzakis, G. D. Kremmyda

Laboratory for Earthquake Engineering

National Technical University, Athens, Greece

Page 2: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

The SAFECAST project

PERFORMANCE OF INNOVATIVE MECHANICAL CONNECTIONS PERFORMANCE OF INNOVATIVE MECHANICAL CONNECTIONS

IN PRECAST BUILDING STRUCTURES UNDER SEISMIC IN PRECAST BUILDING STRUCTURES UNDER SEISMIC

CONDITIONSCONDITIONS

• Research for the benefit of SME’s

• Grant agreement number: 218417

• Project Coordinator: Dr Antonella Colombo – ASSOBETON

SERIES Workshop 2 September 2010, Ohrid

• Project Coordinator: Dr Antonella Colombo – ASSOBETON

Consortium

• 5 National Associations of precast concrete producers:� ASSOBETON, Italy

� ANDECE, Spain

� ANIPB, Portugal

� SEVIPS, Greece

� TPCA, Turkey

Page 3: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

The SAFECAST project

• 7 Research Institutions (RTD providers):

� Joint Research Centre – Elsa Laboratory, Italy

� Politecnico di Milano, Italy

� National Technical University of Athens, Greece

� Istanbul Technical University, Turkey

� Laboratorio Nacional de Engenharia Civil. Portugal

� University of Ljubljana, Slovenia

SERIES Workshop 2 September 2010, Ohrid

� University of Ljubljana, Slovenia

� Labor, Italy

• 4 SME’s

� DLC, Italy

� PRELOSAR, Spain

� LUGEA, Italy

� HALFEN, Germany

Page 4: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

The SAFECAST project

• The project aims to the experimental investigation and

numerical validation of the dynamic behavior of joints and

connections in precast structures towards a correct seismic

design.

• The research activity is directly relevant to the interests of the

precast construction industry, thus it is directed to the precast

SERIES Workshop 2 September 2010, Ohrid

precast construction industry, thus it is directed to the precast

systems commonly used in the participating countries.

• The research is focused on dry connections, consisting of

mechanical devices, which is the most common type in

modern precast buildings, especially industrial buildings, in

southern Europe and elsewhere.

Page 5: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

The SAFECAST project

Five types of connections are considered:

1. Between adjacent floor or roof elements

2. Between floor or roof panels and supporting beams

3. Between columns and

SERIES Workshop 2 September 2010, Ohrid

3. Between columns and beams

4. Between segments of columns or between columns and foundations

5. Between cladding panels and structural elements

Page 6: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Pinned beam−to−column connections

35 15 60 15 35

50 60 50

Plan view

1 1

2 dowels O20 bolted

Cast insitu concreteCast insitu concrete

Precast beamPrecast beam

60

Precast column

Cast insitu concrete Cast insitu concrete

2 dowels O20 bolted

SERIES Workshop 2 September 2010, Ohrid

60

60

4O12Protruding bars from the beam

Precast beam Precast beam

Cast insitu concrete Cast insitu concrete

1 dowel O20 bolted1 dowel O20 bolted

4O12Protruding bars from the column

4O12Protruding bars from the beam

4O12Protruding bars from the column

Section 1-1

Page 7: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Pure shear tests at NTUA

SERIES Workshop 2 September 2010, Ohrid

Page 8: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Experimental setup for pure shear tests

RE

AC

TIO

N W

ALL

SPECIAL APPARATUS

FOR UNIAXIAL

APPLICATION OF FORCE

TEST

SERIES Workshop 2 September 2010, Ohrid

JACK

RE

AC

TIO

N W

ALL

TEST

SPECIMEN

FASTENING MECHANISM

Page 9: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Experimental setup for pure shear tests

SERIES Workshop 2 September 2010, Ohrid

Page 10: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Reinforcement of specimens

Concrete: C30/37

Steel: S500

SERIES Workshop 2 September 2010, Ohrid

Page 11: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Reinforcement of specimens

SERIES Workshop 2 September 2010, Ohrid

column beam

Page 12: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Test program

dowels d Excitation

2 Ø25 0.10

Push

Pull

Cyclic × 2

1 Ø25 0.10

Push

Pull

Cyclic × 2

2 Ø16 0.10

Push

Pull

d

SERIES Workshop 2 September 2010, Ohrid

2 Ø16 0.10 Pull

Cyclic × 2

1 Ø32 0.20

Push

Pull

Cyclic

2 Ø25 0.15Pull

Cyclic

2 Ø25 0.20Pull

Cyclic

2 Ø25 0.10+anch. plate Cyclic

Green: done

Blue: ongoing

Page 13: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Monotonic PUSH - PULL: 2 ∅25, d = 10 cm

SERIES Workshop 2 September 2010, Ohrid

Page 14: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Monotonic PUSH - PULL: 2 ∅25, d = 10 cm

SERIES Workshop 2 September 2010, Ohrid

Page 15: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Monotonic PUSH - PULL: 2 ∅25 vs 1 ∅25

SERIES Workshop 2 September 2010, Ohrid

Page 16: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Comparison with analytical expressions

2 dowels 2 dowels ∅∅25, d = 10 cm: 25, d = 10 cm: FFmaxmax(push) (push) ≈≈ 470 470 kNkN, , FFmaxmax(pull) (pull) ≈≈ 230 230 kNkN

• Shear failure of dowel

⇒ FvR = 2×123.25 = 246.50 kN

• Compression of concrete

⇒ Vud,b = 2×58.11 = 116.22 kN

sydvR

3

1AfF ⋅=

ydcdsbud,

651ffA

γ

.V ⋅⋅⋅=

SERIES Workshop 2 September 2010, Ohrid

• Concrete cone splitting

� Push: ⇒ Vud,c = 2×241.41 = 482.82 kN

� Pull: ⇒ Vud,c = 2×85.34 = 170.68 kN

• Tassios (1985) and Greek Precast Code

⇒ Du,d = 2×99.50 = 199.00 kN

ydcdsm

bud,γ

23

p

51

b

bcdb

ccud,

11 /

/

cd

lfd

γ

.V

⋅⋅=

ysck

2du, ffΦδD ⋅⋅⋅=

Page 17: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Observed damage: monotonic PUSH

SERIES Workshop 2 September 2010, Ohrid

Spalling of cover

concrete at columnCracks around dowelSpalling of cover

concrete at beam

Page 18: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Observed damage: monotonic PULL

Spalling of cover

concrete at beamDIRECTION OF

MOTION

AT SMALL

DISPLACEMENT

SERIES Workshop 2 September 2010, Ohrid

concrete at beamMOTION

Page 19: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Observed damage: monotonic PULL

Destruction of the

dowel duct and the

grouting at beam

AT LARGE

DISPLACEMENT

SERIES Workshop 2 September 2010, Ohrid

grouting at beam

Spalling of

concrete at column

Page 20: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Observed damage: monotonic PULL

Dowels are

restrained by

lower hook.

SERIES Workshop 2 September 2010, Ohrid

lower hook.

Page 21: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Observed damage

SERIES Workshop 2 September 2010, Ohrid

Page 22: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Cyclic tests: Loading protocol

Velocity = 0.2 mm/s

0

20

40

60

en

t (m

m)

1 dy

2 dy

3 dy

4 dy

6 dy

8 dy

SERIES Workshop 2 September 2010, Ohrid

0 2000 4000 6000 8000 10000

Time (sec)

0

-60

-40

-20

Dis

pla

ce

m

Page 23: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Cyclic tests: 2 ∅25, d = 10 cm

SERIES Workshop 2 September 2010, Ohrid

Page 24: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Cyclic tests: 2 ∅25, d = 10 cm

SERIES Workshop 2 September 2010, Ohrid

Page 25: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Cyclic tests: 2 ∅25, d = 10 cm

SERIES Workshop 2 September 2010, Ohrid

Page 26: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Cyclic tests: 2 ∅25 vs 1 ∅25

SERIES Workshop 2 September 2010, Ohrid

Page 27: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Future tests: Bending & Shear

Aims and Restrictions

� Formation of plastic hinge at bottom of column, in order to check q-factor and ductility. However, this reduces the forces that are developed at the

SERIES Workshop 2 September 2010, Ohrid

developed at the joint.

� Development of large displacements and rotations at joint, in order to check its behavior.

� Restrain forces and overturning moments within the shaking table capacity.

SHAKE TABLE

Page 28: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Bending & Shear: Experimental setup

SERIES Workshop 2 September 2010, Ohrid

Page 29: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

Bending & Shear: Experimental setup

SERIES Workshop 2 September 2010, Ohrid

Page 30: Experimental investigation of the behaviour of pinned … · Experimental investigation of the behaviour ... ≈≈470 470 kkNN,, FFmax (pull) ≈≈230 230 kkNN ... ud, b s cd yd

SAFECAST

PERFORMANCE OF INNOVATIVE MECHANICAL CONNECTIONS IN PRECAST BUILDING

STRUCTURES UNDER SEISMIC CONDITIONS

SERIES Workshop 2 September 2010, Ohrid

Grant agreement number: 218417

Project Coordinator: Dr Antonella Colombo – ASSOBETON

www.safecastproject.eu