Frenchmarketandprojectsrevisited
6thJune2017–London
FranceEnergieEolienne(FEE)
FEE–theFrenchWindEnergyAssociaDonCreated in 1996, France Energie Eolienne (FEE) supports and represents the windenergysector(bothonshore&offshore)inFrance.
Missions
ü FEE represents the wind industry at public, naDonal, European and regionalauthoriDesandregulaDngbodies,
ü The associaDon acDvely par@cipates in the crea@on of legisla@ve and regulatorytexts,
ü It supports its members and facilitates their development in France. TheassociaDon promotes the interests of the associa@on members and organisesnetworking events as the annual na@onal summit: “colloque naDonaléolien”(around1000parDcipantsinSeptember2016).
• 300members(June2017):theybuiltmorethan90%oftheinstalledwindturbines
inFranceandoperate85%ofthem.
• www.fee.asso.fr@feeasso
2
TheactualFrenchWindEnergyMarket
3
- 14470jobsinthewindindustryon31.12.2015
- +1950jobsin2015(i.e.+15%)
- 790companies- ~12GWinstalled
capacity(onshore)on31.12.2016
- +1560,5MWinstalledcapacity(onshore)in2016
- 1stoffshorewindfarms(boYomfixed)commissionedfrom2021.
à2017edi@on(2016figures)tocome:September2017!
PlayersoftheFrenchmarket–mid-2016
4
Theenergyplan(PPE–10/2016)
• BoZom fixed offshore wind: between 0,5 and 6 GWaddi@onalcapaci@esawardedby2023.
• Floa@ngoffshorewind:– a«MRE»objecDf(withDdalwave),between0,2and2GWaddi@onalcapaci@esawardedby2023.
• Ongoing process concerning the preparaDon of the 1stFOWcommercialtender(zoning):– IntheMediterraneanSea– InBriYany(NorthandSouth)
• PPEtobeupdatedinthenextmonths5
FEE recommandation
(2030)
15 000 MW
6 000 MW
OffshorewindinFrance–theawardedprojects(boYomfixed)
6
3GWawardedthrough2rounds
7
FécampEMF-WPD
CourseullesEMF-WPD
LocaDon Seine-MariDme Calvados
Power 498MW 450MW
Nbofturbines 83 75
FoundaDon GBS Monopile
Waterdepth 26à36m 21à32m
Distancefromthecoast 13km 10km
Area 65km² 50km²
Offshorewindopportuni@esinFrance…FocusonRound1“EMF-wpd”Projects
EPCI Foundations FCP / COU - SNA
EPCI OSS COU – FCP - SNA
Onshore Grid
EPCI IAC COU – FCP - SNA
EPCI Export Cables COU – FCP - SNA
EPC / T&I WTG COU – FCP - SNA
2007-2013 2014-2015 2016 2017 From2018
Preliminarydialogue
Publicdebate
EnvironmentalandTechnical
studies
Endofmi@ga@onperiod
SubmissionoftheApplica@onfor
Authoriza@on(EIA)
Gran@ngof
authoriza@ons[Q2]
Nego@a@onofthemaincontracts
Selec@onofsuppliers[S22016]
FinancialInvestmentDecision
Closing
Firmorders
Startoffabrica@on
Construc@onon2years:supplyof
components,installa@on&commissioning
Opera@on
during25ans
ProjectsDevelopment Construc@onandopera@on
Engineeringandriskassessment
Startoftheprocurementprocessfor
construc@onlots(Direc@ve2014/17)
Offshorewindopportuni@esinFrance…Provisionalscheduleànewonetobeprecised
Newtenderingprocess–thecompeDDvedialogue
• Tenderingprocessin2steps:– Pre-qualificaDonontechnical&financialcapaciDes;– Aoer a pre-selecDonof the EnergyMinister : technical dialoguebetween
the State (ministry + other services, TSO etc.) and the prequalifiedcandidatesonthetendercondiDons.
• Aimoftheprocedure:– createatransparentandflexibletenderàincreasedconcurrenceinorder
toobtainthebestpriceandproject.• Addi@onalinforma@on:
– TheprocedurecanbebasedonpreliminaryinvesDgaDons(windresourcesdata, geophysical survey + environmental survey), coordinated by theState.
àTheprocedureshouldrulethenextoffshorewindtenders (fromthe3rdroundoffDunkerque).
10
Ongoingtenders(3rdand4throunds)
• Dunkerque(250-750MW)–3rdround– Launched:OngoingcompeDDvedialogueprocedure/phase1achieved:i.e.
pre-selecDon of the candidates (10 candidates pre-selected according tothepress)+startofthediscussionsonthetender.
• Oléron(~500MW-tbc)–4thround– PublicconsultaDononthesiteachieved;startofthecompeDDvedialogue
proceduretocome(summer2017?)withphase1–postponedbecauseofgeneralelecDon.
• Bassure-de-Baas/Berck-LeTouquet(~250MW/+-tbc)– 1st public consultaDon – a few informaDon available at the moment.
ShouldbeclarifiedwiththenewGovernment.
11
WindenergyinFrance–stateoftheart
12
OffshorewindinFrance,abiggerpotenDaltodevelop
13
TakingintoaccountthepotenDalseaboardarea,theindustrialcapacityofthesector’splayers, and the necessary coordinaDon,FEE es@mates that 15GW of installedcapacityisarealis@ctargetfor2030.
An emerging industrial sector in France
Significant assets for the offshore wind industry
14
France benefits from significant assets to develop a wind energy industrywhich will createemploymentsandeconomicacDviDes:
• An industrial know-how with significant experience in automoDve, aeronauDcs,manufacturing of large ships, O&G, nuclear or mechanical and electromechanicalcomponents
• Ac@veinvestmentbyFrenchregionswiththefoundaDonofseveralclustersaroundportandinfrastructureacDviDes
• Ports are already preparing to adapt their infrastructures to welcome new acDviDesdedicated to offshorewindfarms (assembly, logisDcs, operaDon andmaintenance,…) :Dunkerque,Dieppe,Fécamp,LeHavre,Cherbourg,Brest,Nantes-SaintNazaire,Bordeaux
• Large researchanddevelopment resources (technical centres,university, laboratories,dedicatedsitesfortests…)
AnemergingmarketsectorinFrance–Industrialinvestmentsannounced
15
Anemergingsector–thechallenge
16
A completely new market to develop, based on long standing governmentaldecisions.ThismeanslotsofOPPORTUNITIES!Butthereareplentlyofchallenges:
- UnprecedentsoilcondiDons- ImplementaDonofnewtechnologies- AvailabilityandperformanceofnewmanufacturingfaciliDesandharbours- Lackoftrackrecordandexperience- MarketdevelopmentthroughM&A- RiskoflegalrecourseagainstauthorizaDons- Long-termvisionforinvestors:FrenchgovernmenthascommiYedtocut
relianceonnuclearenergy(75to50%by2030)-operatedbystate-controlledEDF–butstrugglestofinallyactthisstrategyinthemulD-yearinvestmentplan.
WhataboutfloaDngoffshorewindinFrance?
17
FOWPilotfarms-ADEME
• AcallfortenderslaunchedinAugust2015andclosedinApril2016.4projectsawardedinJulyandNovember2016.
• Operated by the ADEME (agency of the Ministry ofEnvironment,EnergyandtheSea).
• Financedbyan investmentprogramcalled«ProgrammedesInvesDssements d’Avenir » (PIA – management by CGI andoperatedbyADEME)
• Ini@alsupportoftheGovernment:– 150M€foralltheprojects+aFiTforeachproject.àHasbeenincreasedtoup300M€+FiTforeachproject
18
FloaDngoffshorewind–pilotfarms(1/2)
19
ü 4awardedprojects:3intheMediterranean,1inBriZany(4x24MW)
ü 2siteswereawardedon22thJuly2016(Gruissan&Groix)
ü 2siteswereawardedon3rdNovember2016(Leucate&Faraman)
FloaDngoffshorewind–pilotfarms(2/2)
20
Thepilotfarmscalenders
• July & November 2016: 4 projects – 96MW (4x24MW)awarded.
• 2017*: conciliaDon meeDngs + start of the surveysprocess
• Endof2017*:permitsapplicaDon• Endof2018-2019*:permitsdelivery• 2020*:installaDon• 2021*:commissioning*ExampleforGruissan–EolmedconsorDum
21
ApathwayforFOWdevelopment
07.06.17 22
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2030
Callforp
rojects
Commercial
tend
er
6GWofFOWcommissionedby2030
Preparations (zoning) and Competitive
dialogue
Surveys and permits Manufacturin
g and installation
Operation
≈3yearsbetweenthepilotandcommercialfarmscommissionings
Call for projects pilot farms
Surveys and permits
Manufacturingand
installation Operation
TheFrenchpotenDal–1/2
• BriYany
23
TheFrenchpotenDal–2/2
• MediterraneanSea
24
LeadingFOWfoundaDons
25
AnemergingindustrialsectorinFranceFrenchcomponentsuppliersknow-howandexperDse
26
FacilitaDnginternaDonalcooperaDon
Whyhavingpartnership?
27
• Maximizemarketopportuni@es!• Exchangerespec@veknow-howandexperience
• Diversifyandgrowmorerapidly
• Getaccesstobiggercontracts
• Mutualizetherisksandinvesment(technical,financial…)andthusreassureinvestors,bankers
• Exportanddemonstratecapabili@esinterna@onally
• Benchmarkthebestavailableprac@ceandtechnologies
• ShareknowledgeaboutNa@onalenvironment(regulaDon,culture,andwayofdoingbusiness)
• Valorizeinnova@vetechnologiesandtechniques(althoughnotyetappliedintheOFWsector)
OngoingworksatFEE
• Mari@me spa@al planning: contribuDons of the industry(awardedprojectsandfuturesitesforoffshorewind)
• Reformofthegridconnec@onsystem(shareoftherisks)• WGonthelegalframework(deriskingandpermits)• WG on the Works rules for employees on the Sea (legal
framework)
28
Agenda2017-2018
• 8thnaDonalwindenergycongress–«colloquenaDonaléolien»:19-20September2017–Paris– www.colloque-naDonal-eolien.com– Nearly1000parDcipants,40exhibitors– FocusedontheFrenchmarket
• FOWT2018:25-26April2018–Marseille(Provence)
– FOWTistheworldwidelargesteventforfloaDngoffshorewindwww.fowt-conferences.com
– NB:theNorwegiandelegaDonwasoneofthemostimportantin2017!
29
ThankyouforyouraYenDon
MaYhieuMonnierHeadofUnit–Industry,Offshore,Technical
Works&Territories