FY012 PROJ 10 OFFICE REMODELING PROJECT
S-60 BUILDING (RESIDENCE)
100% Design Drawings Contract No: SIZ25012MO166
Prepared For
US Department of State US Consulate General, Erbil
Kurdistan Region - Iraq
Prepared by
ENGINEERS │ SURVEYORS │ PLANNERS Local Office: Suite 42, Building B3, Pak City, Sulaymania, Iraq
International Headquarters: 312 Commerce Drive, Pawleys Island, SC (USA) www.ldainternational.com
6 February 2013
SHEET INDEX
SHEETNO. DESCRIPTION
i COVER SHEET
ii SHEET INDEX
ARCHITECTURAL DRAWINGS
1 EXISTING SITE PLAN
2 EXISTING FIRST FLOOR PLAN
3 EXISTING SECOND FLOOR PLAN
4 EXISTING ROOF PLAN
5 NEW SITE PLAN
6 NEW FIRST FLOOR PLAN
7 NEW SECOND FLOOR PLAN
8 NEW ROOF PLAN
IT - ELECTRICAL - LIGHTING DRAWINGS
9 IT - ELECTRICAL - LIGHTING LEGEND
10 IT - ELECTRICAL - LIGHTING PLAN - FIRST FLOOR
11 IT - ELECTRICAL - LIGHTING PLAN - SECOND FLOOR
12 IT - ELECTRICAL - LIGHTING PLAN - ROOF
13 ELECTRICAL SINGLE LINE DIAGRAM
14 PANELBOARD SCHEDULE
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
INDEX SHEET
UP
BEDROOMA 102
BEDROOMA 103
LIVING ROOMA 101
KITCHENA 104
BATHROOM 105
W
D
BATHROOM106
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
EXISTING SITE PLAN
EXISTING ADDITIONALSTORE ROOM
ADDITIONAL BLOCKWALL
UP
W
D
BEDROOMA 102
BEDROOMA 103
LIVING ROOMA 101
KITCHENA 104
BATHROOM 105
BATHROOM106
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
EXISTING FIRST FLOOR
UP
UP
BEDROOMA 201
BAL201
BAL202
HALLWAYA 204
BEDROOMA 202
BATHROOMA 203
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
EXISTING SECOND FLOOR
EXISTING HANDRAIL
ROOF301
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
EXISTING ROOF PLAN
UP
BEDROOMA 102
BEDROOMA 103
LIVING ROOMA 101
KITCHENA 104
BATHROOM 105
W
D
BATHROOM106
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
SITE PLAN - NEW WORK
REPLACEEXISTING PORCH TILE
REMOVEEXISTING GATE
REPLACE EXISTING3 COLUMNS
REMOVE BLOCK WALL
REMOVEEXISTING GATEINCREASE GATEOPENING TO 1.5m
ALL EXISTING WALLTO BE LOWERED TO 40cm ABOVE GROUND.REPLASTER AND REPAINT
REMOVESTORE ROOM
INSTALL NEW EXTERIOR TILESALONG ALL SIDEWALKS AROUND HOUSE.
UP
W
D
BEDROOMA 102
BEDROOMA 103
LIVING ROOMA 101
KITCHENA 104
BATHROOM 105
BATHROOM106
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
FIRST FLOOR - NEW WORK
INSTALL NEW EXTERIORSTEEL DOOR (3 REQUIRED)
ADDITION OF RAILINGALONG STAIRS (TO 107cm)
INSTALL FLOOR TILESFOR STAIRWAY FROM SECONDFLOOR, INCLUDING INTERMEDIATELANDING
INSTALL NEW SHOWER EXHAUSTFAN, AND BATHROOM FURNISHING
INSTALL NEW TOILET, SINKBATHROOM FURNISHINGSAND EXHAUST FAN
INSTALL NEWCOUNTERS
INSTALL NEW KITCHENSINK & PLUMBING
ALL INTERIOR DOORS TO BEREPLACED PER SPECIFICATIONS
ALL WINDOWSTO BE REPLACED PER SPECIFICATIONS
UP
UP
BEDROOMA 201
BAL201
BAL202
HALLWAYA 204
BEDROOMA 202
BATHROOMA 203
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
SECOND FLOOR - NEW WORK
REMOVE AND REPLACE ALLEXISTING HANDRAILWITH CONCRETE RAILING(95cm HEIGHT)
INSTALL NEWEXTERIOR TILES ONLOWER BALCONY
INSTALL NEW TOILET,ENCLOSED SHOWER, SINK,AND EXHAUST FAN, INSTALLNEW FLOOR TILES.
INSTALL NEW EXTERIORSTEEL DOORS(3 REQUIRED)
ADDITIONOF RAILING(TO 107cm)
REPLACE INTERIOR STEPS ANDINSTALL RAILS, INSTALL TILES ONSTAIRS. (2 LOCATIONS)
INSTALL NEW EXTERIORTILES ON BALCONY
INSTALL NEW EXTERIORTILES ON BALCONY
INSTALL NEWEXTERIOR TILES ONUPPER BALCONY.
REMOVE EXISTINGSTAIRS AND REPLACEWITH NEW STEEL STAIRS(3 LOCATIONS)
REMOVE EXISTINGSTAIRS AND REPLACEWITH NEW STEEL STAIRS
INSTALL NEW INTERIORFLOOR TILES FOR STAIRWAYFROM FIRST FLOOR TO SECOND FLOOR,INCLUDING INTERMEDIATE LAND
ROOF301
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
ROOF PLAN - NEW WORK
REMOVE AND REPLACEENTIRE EXISTING WALLON ROOF
INSTALL CONCRETE BLOCKSTEPS WITH RAILING AT SPLIT LEVEL.
A/C
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
IT - ELECTRICAL - LIGHTING LEGEND
E
E
E
C-23
A/C
C-11 C-12
C-23
C-13
C-13
C-13
C-13
C-13
C-13
C-13
C-13
C-15
C-13
C-13
C-15
C-15
C-15
C-11
C-15
C-23
R
C-7
D
C-9
C-10
WASHER
C-12
2
C-12
2 2C-11
2Rh
RhRh
C-1 C-3
C-11
C-15
C-24
C-24
C-24
C-24
C-11
C-11
C-11
C-24
C-24
C-24
COUNTER TOPRECEPTACLES TO BEMOUNTED 20MM ABOVECOUNTERTOP
2 Rh
2
C-12
C-2
C-11
C-2
C-1
WATERPUMP
WATERHEATER
C-5
C-6
C-12
ELECTRICAL NOTES:
220V, 1Ø, CIRCUIT CONDUCTORINSULATION SHALL BE COLOR CODED:LINE - BLACKNEUTRAL - WHITEEARTH - GREEN
CONDUIT SHALL BE 3/4" MINIMUM
2
C-14
C-23
C-24
C-23
C-12
200A NEMA 12 PANELBOARD,24-1P BREAKERS PER SCHEDULE
200A NEMA 3R SERVICEDISCONNECT SWITCH
ENGINEERS - SURVEYORS - PLANNERS
WWW . LDAINTERNATIONAL . COM
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
IT - ELECTRICAL - LIGHTING PLAN - FIRST FLOOR
2
C-14
EC-11
C-11
E
C-11
E
C-11
C-11
Rh2
2
C-14
Rh
C-14
2
C-14
C-23
C-23
C-23
C-16
C-16
C-16
C-16
C-16
C-16
C-16
C-16
C-16
C-16
C-16C-16
C-16
2
2C-14
C-23
C-4
C-3
C-4
W
C-14
ENGINEERS - SURVEYORS - PLANNERS
WWW . LDAINTERNATIONAL . COM
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
IT - ELECTRICAL - LIGHTING PLAN - SECOND FLOOR
C-23
NEMA 4 TERMINALBOX FOR PUMPELECTRICAL
C-8
ELECTRICAL NOTES:
ROOF LIGHTS ARE POLE MOUNTED ANDLOCATED ON TOP OF THE WALL. SETLIGHTS AT 2.4m ABOVE ROOF.
W
ENGINEERS - SURVEYORS - PLANNERS
WWW . LDAINTERNATIONAL . COM
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
IT - ELECTRICAL - LIGHTING PLAN - ROOF
ENGINEERS - SURVEYORS - PLANNERS
WWW . LDAINTERNATIONAL . COM
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
ELECTRICAL SINGLE LINE DIAGRAM
NEUTRAL BUSGROUND BUS
CKT AMP POLEWIRE
(AWG) DESCRIPTION LOAD A B C LOAD DESCRIPTIONWIRE
(AWG) POLE AMP CKT1 30 1 10 A/C Room 101, 102 4350 8700 4350 A/C Room A104, 105 10 1 30 23 30 1 10 A/C Room 103, 203 4350 8700 4350 A/C Room A201, 202 10 1 30 45 30 1 8 Water Heater 5500 7000 1500 Water Supply Pump 12 1 20 67 40 1 8 Range 6700 8200 1500 Roof Pressure Pump 12 1 20 89 40 1 8 Dryer 7200 8700 1500 Washer 12 1 20 1011 20 1 12 Emergency Lights 700 3700 3000 1st Floor Lights 12 1 20 12
13 20 1 12Rooms A102, 103
Recepts 4000 6400 2400 2nd Floor & Roof Lights 12 1 20 14
15 20 1 12 Rooms A101, 107 Recepts 4000 8000 4000 2nd Floor Recepts 12 1 20 16
17 20 1 SPARE 0 0 SPARE 1 20 1819 20 1 SPARE 0 0 SPARE 1 20 2021 20 1 SPARE 0 0 SPARE 1 20 22
23 20 1 12 Outdoor, bath, kitchen recepts 2000 6000 4000 Kitchen , Ex Fan,
appliance recepts 12 1 20 24
TOTALS 23300 25400 16700 WATTS
= 65400 WATTS S-60
CKT 23 is equipped with GFCI circuit breaker.
TOTAL 3Ø W
PANELBOARD SCHEDULE
125 AMP MAIN BREAKER
250A PANELBOARD230/400 VOLT, THREE PHASE, FOUR WIRE, WITH GROUND BUS, RATED 15kAIC
CKT 24 is equipped with GFCI circuit breaker.
ENGINEERS - SURVEYORS - PLANNERS
WWW . LDAINTERNATIONAL . COM
I N T E R N A T I O N A LLDA
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:
FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:
PANELBOARD SCHEDULE