Transcript
Page 1: FY06 – Q2/Q3   (Step 1)

FY06 – Q2/Q3 (Step 1)

• Install & Commission H+ Ion Source and FNAL/ANL Test Cryo• Max Beam Energy: 0.050-0.065 MeV• Services Needed

– Cooling Water– HV Power– ?????

Ion S.H+

RFQ

Rail System

MEBT RT CavitiesSSR DSR DSR

New Installation

Old Installation

Not InstalledColors

FNAL/ANLTest Cryo (Q2)

Commissioning

Test Cryostat Commissioning (Q3)

Power Couplers (Q2)

Power Coupler Testing (Q3)

Page 2: FY06 – Q2/Q3   (Step 1)

FY06 – Q4 (Step 2)

• Install & Commission Rail System• Max Beam Energy: 0.050-0.065 MeV• Services Needed

– Ion Source• Cooling Water• HV Power• ?????

Ion S.H+

RFQ

Rail System

MEBT RT CavitiesSSR DSR DSR

FNAL/ANLTest Cryo

New Installation

Old Installation

Not InstalledColors

Commissioning

Page 3: FY06 – Q2/Q3   (Step 1)

FY07 – Q2 (Step 3)

• Install & Commission H- Source, MEBT and RT Cavities• Max Beam Energy: 0.065 MeV• Services Needed

– Ion Source• Cooling Water• HV Power• ?????

– MEBT + RT Cavities• Cooling Water• 325 MH RF Power• 4K He• Solenoid PS• ????

Ion S.H-

RFQ

Rail System

MEBT RT CavitiesSSR DSR DSR

FNAL/ANLTest Cryo

New Installation

Old Installation

Not InstalledColors

Commissioning

Page 4: FY06 – Q2/Q3   (Step 1)

FY07 – Q3 (Step 4)

• Install & Commission RFQ• Max Beam Energy: 15 MeV• Services Needed

– Ion Source• Cooling Water• HV Power• ?????

– RFQ + MEBT + RT Cavities• Cooling Water• 325 MH RF Power• 4K He• Solenoid PS• ????

Ion S.H-

RFQ

Rail System

MEBT RT CavitiesSSR DSR DSR

FNAL/ANLTest Cryo

New Installation

Old Installation

Not InstalledColors

Commissioning

Page 5: FY06 – Q2/Q3   (Step 1)

FY07 – Q4 (Step 5)

• Install & Commission SSR Cryomodule• Max Beam Energy: 33 MeV• Services Needed

– Ion Source• Cooling Water• HV Power• ????? (Vacuum, Controls,..)

– RFQ + MEBT + RT + SSR Cavities• Cooling Water• 325 MH RF Power• 4K He• Solenoid PS• ???? (Vacuum, Controls,…)

Ion S.H-

RFQ

Rail System

MEBT RT CavitiesSSR DSR DSR

FNAL/ANLTest Cryo

New Installation

Old Installation

Not InstalledColors

Commissioning

Page 6: FY06 – Q2/Q3   (Step 1)

FY08 – Q2 (Step 6)

• Install & Commission DSR Cryomodules• Max Beam Energy: 100 MeV• Services Needed

– Ion Source• Cooling Water• HV Power• ????? (Vacuum, Controls,..)

– RFQ + MEBT + RT + Spoke Resonators• Cooling Water• 325 MH RF Power• 4K He• Solenoid PS• ???? (Vacuum, Controls,…)

Ion S.H-

RFQ

Rail System

MEBT RT CavitiesSSR DSR DSR

FNAL/ANLTest Cryo

New Installation

Old Installation

Not InstalledColors

Commissioning


Top Related