Download - Gas Piping
![Page 1: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/1.jpg)
1
DESIGN AND APPLICATION OF
GAS PIPING SYSTEM IN BUILDING
• LPG• MEDICAL GAS
![Page 2: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/2.jpg)
2
LIQUID PETROLEUM GAS
• COMMERCIAL
• LABORATORY
![Page 3: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/3.jpg)
3
MEDICAL GAS• HOSPITAL
– Oxygen– Nitrous oxide– Helium– Nitrogen– Mixed gas
![Page 4: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/4.jpg)
4
STANDARD AND CODE REFERENCE
ON LPG SYSTEM
• E.I.T. Standard 3006-40 (Standard for Liquid Petroleum Gas system)• Liquid Petroleum Gas law (From Ministry of Interior)
![Page 5: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/5.jpg)
5
STANDARD AND CODE REFERENCE
ON MEDICAL GAS
• NFPA Standards 99 (Standard for Health Care Facilities)• NFPA Standard 50 (Bulk Oxygen Systems at Consumer Sites)
![Page 6: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/6.jpg)
6
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS
Planing• Architectural and Structure Plan•Gas Equipment Information•Code and Law•Piping lay-out
![Page 7: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/7.jpg)
7
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS
Sizing of Gas Piping System• Determine the maximum possible gas
demand
![Page 8: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/8.jpg)
8
![Page 9: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/9.jpg)
9
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS
Determine the maximum possible gas demand• Commercial kitchen use 100% Simultaneous use
factor• Dwelling unit use 65,000 Btu/hr/unit
(See simultaneous use factor in Table 2)• Laboratory use 5,000 Btu/hr/burner
(See simultaneous use factor in Table 3)
![Page 10: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/10.jpg)
10
![Page 11: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/11.jpg)
11
![Page 12: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/12.jpg)
12
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS
Determine the pressure drop• Less than 10% of working pressure
![Page 13: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/13.jpg)
13
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS
Determine the distance to the most remote gas outlet• Equivalent length
![Page 14: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/14.jpg)
14
![Page 15: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/15.jpg)
15
![Page 16: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/16.jpg)
16
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS
Determine the specific gravity of the gas• Use the gravity factor
![Page 17: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/17.jpg)
17
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS
Determine the system design pressure• National Fuel Gas Code - 5 Psi maximum for NG. - 20 Psi Maximum for LPG.
![Page 18: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/18.jpg)
18
TABLE 3
![Page 19: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/19.jpg)
19
TABLE 4
![Page 20: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/20.jpg)
20
TABLE 5
![Page 21: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/21.jpg)
21
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS Determine the pipe size Example :
80
SECTION 3
Pout=10 psi
20 25FT
20FT
SECTION 1SECTION 2
1,888,00 BTU/HR
1,145,00 BTU/HR
2,120,00 BTU/HR
2,400,00 BTU/HR
A
C
B
D
3020
60
40
![Page 22: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/22.jpg)
22
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS Determine the pipe size Solution :
- The distance to the most remote gas outlet is 185 FT- Outlet A : = 1450 CFH, FROM TABLE 4 :-REQUIRES DIA 1”- Outlet B : = 1888 CFH, FROM TABLE 4 :-REQUIRES DIA 1 1/4”- Outlet C : = 2120 CFH, FROM TABLE 4 :-REQUIRES DIA 1 1/4”- Outlet D : = 2400 CFH, FROM TABLE 4 :-REQUIRES DIA 1 1/4”
![Page 23: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/23.jpg)
23
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS Determine the pipe size Solution :Section 1 : 3,338 CFH, FROM TABLE 4 :-REQUIRES DIA 1 1/2”Section 2 : 5,458 CFH, FROM TABLE 4 :-REQUIRES DIA 2”Section 3 : 7,858 CFH, FROM TABLE 4 :-REQUIRES DIA 2”
![Page 24: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/24.jpg)
24
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS Determine the pipe size Solution :
SECTION 3
Pout=10 psi
11/4"
A
C
B
2" 11/2"
11/4"
1"
11/4"
2"
D
![Page 25: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/25.jpg)
25
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS
Determine the pipe size• See Figure 1 (Low pressure)• See Figure 2 (High pressure)
![Page 26: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/26.jpg)
26
![Page 27: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/27.jpg)
27
![Page 28: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/28.jpg)
28
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS Piping Materials (NFPA 54)• Steel pipe - ASTM A53 - ASTM A106• Copper pipe - ASTM B42
![Page 29: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/29.jpg)
29
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS Tubing Materials (NFPA 54)• Steel tube - ASTM A539• Copper tube - ASTM B88 (Type K or L)
![Page 30: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/30.jpg)
30
CRITERIA TO DESIGNLIQUID PETROLEUM GAS
Other Standard• Tubing Material Copper Tube - EN 1057- R250 ✐ Table X ✐ Table Y - EN 1057-R220 ✐ Table W ✐ Table Y
![Page 31: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/31.jpg)
31
![Page 32: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/32.jpg)
32
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS Piping Components• Gas Meter• Gas Pressure Regulators - Service pressure regulator - Line pressure regulator• Overpressure Protection• Back Pressure Protection• Shut off valves
![Page 33: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/33.jpg)
33
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS Gas Piping Installation• Underground - More than 0.45m under cover - Coatings and Wrappings
![Page 34: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/34.jpg)
34
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS Gas Piping Installation• Above ground Piping Outside A Building - Protected from physical damage - Corrosion
![Page 35: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/35.jpg)
35
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS Gas Piping Installation• In Building - In Concealed Location ✐ Above-ceiling ✐ Partitions ✐ Floors
![Page 36: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/36.jpg)
36
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS Pressure-Testing Inspection• Test Preparation• Test Pressure - 1.5 times of maximum working pressure• Test Duration - 10 min for pipe volume less than 0.28m3
- 30 min for each 14.0m3 of pipe volume
![Page 37: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/37.jpg)
37
CRITERIA TO DESIGN
LIQUID PETROLEUM GAS System Check• Check entire system• Purging - 1.5 times of maximum working pressure• Test Duration - 10 min for pipe volume less than 0.28m3
- 30 min for each 14.0m3 of pipe volume
![Page 38: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/38.jpg)
38
CRITERIA TO DESIGN
MEDICAL GASPlanning• Architectural and Structure Plan• Gases Information• Codes and Law• Piping lay out
![Page 39: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/39.jpg)
39
CRITERIA TO DESIGN
MEDICAL GASSizing of Gas Piping System• Oxygen Systems - 1 to 100 outlets, manifold - over 100 outlets, bulk - Determine the maximum possible gas demand
![Page 40: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/40.jpg)
40
TABLE 6
![Page 41: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/41.jpg)
41
CRITERIA TO DESIGN
MEDICAL GASOxygen Systems• Pipe sizing - Maximum friction loss of 5 psi - Outlet pressure (> 50 psi) - Pressure loss (see Table)
![Page 42: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/42.jpg)
42
TABLE 7 Pressure loss per 100 ft of pipe, psi
![Page 43: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/43.jpg)
43
CRITERIA TO DESIGN
MEDICAL GASSizing of Gas Piping System• Nitrous Oxide Systems - Determine the maximum possible gas demand
![Page 44: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/44.jpg)
44
TABLE 8
![Page 45: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/45.jpg)
45
CRITERIA TO DESIGN
MEDICAL GASNitrous Oxide Systems• Pipe sizing - Maximum friction loss of 5 psi - Outlet pressure (> 50 psi) - Pressure loss (see Table)
![Page 46: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/46.jpg)
46
TABLE 9 Pressure loss per 100 ft of pipe, psi
![Page 47: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/47.jpg)
47
CRITERIA TO DESIGN
MEDICAL GASPiping Materials (NFPA99)• Copper tube - ASTM B819 Seamless medical gas tube, Type K or L
![Page 48: Gas Piping](https://reader036.vdocuments.net/reader036/viewer/2022081715/5519d28f4a7959be048b45ac/html5/thumbnails/48.jpg)
48
CRITERIA TO DESIGN
MEDICAL GASPressure-Testing Inspection• Initial Pressure Test - 1.5 time of working pressure (not less than 150 psi)• Final Pressure Test - 20% above operating pressure - Duration (24 hrs.)