Global Trends, Prospects and Challenges for Innovative SMRs Deployment
Dr. M. Hadid SubkiTechnical Lead, SMR Technology Development, gy p
Nuclear Power Technology Development Section, Division of Nuclear Power, Department of Nuclear Energy
IAEAInternational Atomic Energy Agency
Outline• What’s new in global SMR development?• Roles of IAEA on SMR Technology Development• Roles of IAEA on SMR Technology Development• Status of Countries on Nuclear Energy Initiatives• Global Status of SMR Development and Deployment• Global Status of SMR Development and Deployment• Options of SMR Design & Technology
Percei ed Ad antages and Challenges• Perceived Advantages and Challenges• Newcomer Countries’ Considerations
C t N C t i ’ Pl• Current Newcomer Countries’ Plan• Identified Issues from Fukushima Nuclear Accident
S• Summary
IAEA 2
What’s New in Global SMR Development?
SMARTOn 4 July, the Korean Nuclear Safety and Security Commission issued the Standard Design Approval for the 100 MWe SMART – the first iPWR
i d tifi tireceived certification.
NuScalemPowerW SMR
US-DOE funding of 452M$/5 years for two (2) out of the four (4) US competing iPWR based SMRs Some have utilities to adopt in specific sitesW-SMR
Hi-SMURcompeting iPWR based SMRs. Some have utilities to adopt in specific sites
KLT-40sSVBR-100
2 modules marine propulsion-based barge-mounted KLT-40s are in construction, 90%; The lead-bismuth eutectic cooled SVBR-100 deployed by
SHELF, ; p y y
2018, SHELF seabed-based started conceptual PWR-SMR design
Flexblue DCNS originated Flexblue capsule, 50-250 MWe, 60-100m seabed-moored, 5-15 km from the coast, off-shore and local control rooms5 15 km from the coast, off shore and local control rooms
CAREM-25 Site excavation for CAREM-25 was started in September 2011, construction of a demo plan starts soon in 2012
4S Toshiba had promoted the 4S for a design certification with the US NRC for application in Alaska and newcomer countries.
IAEAHTR-PMACP-100
2 modules of HTR-PM are under construction; CNNC developing ACP-100 conceptual design 3
Roles of IAEA on SMR Development
• Facilitate efforts of Member States in identifying key y g yenabling technologies in development and addressing key challenges in deployment;
• Establish and maintain international networks with Member States, industries, utilities, stakeholders;
• Ensure coordination of Member State experts by planning and implementing training programme and knowledgeand implementing training programme and knowledge transfer through technical meetings and workshops
D l i t ti l d ti d id• Develop international recommendations and guidance focusing on specific needs of newcomer countries
IAEA 4
Status of Countries on NE Initiatives
Which countries deploy SMRs?
Technology developer countries (NPPs in operation)(NPPs in operation)
Countries with NPPs
Newcomer countries
Asia
Europe
IAEA 5
Africa
Latin America
Definition
• IAEA:• Small sized reactors: < 300 MW(e)• Small-sized reactors: < 300 MW(e)• Medium-sized reactors: 300 700 MW(e)• Regardless of being modular or non modular• Regardless of being modular or non-modular• Covers all reactors in-operation and under-development
with power up to 700 MWep p• Covers 1970s technology post 2000s innovative
technology• Several developed countries:
• Small reactors: < 300 MW(e)• Emphasize the benefits of being small and modular• Focus on innovative reactor designs under-development
IAEA 6
Concept of Integral PWR based SMRsSMART Westinghouse
SMR
pressurizer
CRDM
Steamgeneratorspumps
CRDM
g
Steamgenerators
CRDM
pumps
core + vessel
core + vessel
IAEA 7
Integral Primary System ConfigurationCourtesy: Westinghouse Electric Company LLC, All Rights Reserved
XXXXXXXX XXXX
XX
XXXXXX
XXBenefits of integral vessel configuration: • eliminates loop piping and external components, thus enabling
compact containment and plant size reduced cost
IAEA 8
• Eliminates large break loss of coolant accident (improved safety)
Light Water Cooled SMRs
CAREM-25Argentina
IMRJapan
SMARTKorea Republic of
VBER-300Russia
WWER-300Russia
KLT-40sRussiaArgentina Japan Korea, Republic of Russia Russia Russia
mPowerUSA
NuScaleUSA
Westinghouse SMR - USA
CNP-300China Peoples Republic of
ABV-6Russia
IAEA 9
USA USA SMR - USA China, Peoples Republic of
How “small” are the iSMR vessels?Ø3.6 x 22 m
Ø3 7 24 7
Ø2.7 x 40 m
Ø2.7 x 13.7 m
Ø3.7 x 24.7 m
NuScale (NuScale)45 MWe
mPower (B&W)180 MWe Westinghouse SMR
225 MWe
IAEA 10
225 MWe
SMR-160(Holtec)
Heavy Water Cooled SMRs
EC6Canada
PHWR-220, 540, & 700India
AHWR300-LEUIndia
IAEA 11
Liquid Metal Cooled SMRs
CEFRChina
4SJapan
PFBR-500India
SVBR-100Russian Federation
PRISMUSA
IAEA 12
Gas Cooled SMRs
PBMRSouth Africa
HTR-PMChina
GT-MHRUSA
EM2
USA
IAEA 13
Motivations – U.S. Case
• Economic AffordabilityL f t it l t
Plants >50 yr old have capacitiesLess than 300 MWe
U.S. Coal Plants
– Lower up-front capital cost– Better financing options
• Load demand– Better match to power needs– Incremental capacity for regions
with low growth rateg– Allows shorter range planning
• Site requirements– Lower land and water usageLower land and water usage – Replacement for aging fossil plants– Potentially more robust designs
• Grid stability• Grid stability– Closer match to traditional power generators– Smaller fraction of total grid capacity
Potential to offset variability from renewables
IAEA 14
– Potential to offset variability from renewables
Motivations – U.S. Case
• Carbon Emission 2005 U.S. CO2 Emissions (Tg)
− Reduce U.S. greenhouse gas emissions 17% by 2020…83% by 20502050
− Reduce federal GHG emissions 28% by 2020
• Energy and Economic Security− Pursue energy security through a gy y g
diversified energy portfolio− Improve the economy through
innovation and technologyinnovation and technology leadership
IAEA 15
Advanced Reactor Requirements
• Enhanced safety• Address lessons-learned from the Fukushima Daiichi nuclear accident
• Proven technologySt d di ti• Standardization
• Economic competitiveness• Plant simplification • Improved design margin• Human factor engineering; man-machine interface• Regulatory infrastructure• Constructability• Maintainability
IAEA• Proliferation resistance and physical protection
16
Perceived Advantages and ChallengesIAEA Observation
Advantages Challenges
Technol
• Shorter construction period (modularization)
• Potential for enhanced safety and li bilit
• Licensability (due to innovative or first-of-a-kind engineering structure, systems and components)N LWR t h l i
logical Is
reliability• Design simplicity• Suitability for non-electric
application (desalination etc)
• Non-LWR technologies• Operability performance/record• Human factor engineering; operator
staffing for multiple modules plantssues
application (desalination, etc).• Replacement for aging fossil
plants, reducing GHG emissions
staffing for multiple-modules plant• Post Fukushima action items on
design and safetyFit f ll l t i it id E i titiN
on-TeI
• Fitness for smaller electricity grids• Options to match demand growth
by incremental capacity increaseSit fl ibilit
• Economic competitiveness• First of a kind cost estimate• Regulatory infrastructure (in both
di d t i )
echnologI
• Site flexibility• Reduced emergency planning zone• Lower upfront capital cost (better
affordability)
expanding and newcomer countries)• Availability of design for newcomers• Infrastructure requirements• Post Fukushima action items on
IAEA
gical
affordability)• Easier financing scheme
• Post Fukushima action items on institutional issues and public acceptance 17
Benefits of Introducing SMRs
35
25
30
15
20
Very Important
5
10y p
More Important
Important
Less Important
0 Not Important
IAEA 18Source: INPRO Dialogue Forum on Common User Considerations for SMR, IAEA – Vienna, 10 – 14 October 2011. 63 participants from 39 Member States
Impediments of Introducing SMRs
Towards commercialization, what hurdles need to be overcome?
3540
,
202530
051015
Very Important
More Important
Important0 Important
Less Important
Not Important
IAEA 19Source: INPRO Dialogue Forum on Common User Considerations for SMR, IAEA – Vienna, 10 – 14 October 2011. 63 participants from 39 Member States
SMRs for Immediate Deployment
Name DesignOrganization Country of Origin Electrical
Capacity, MWe Design Status
1 PHWR-220 NPCIL India 220 16 units in operation
2 PHWR-540 NPCIL India 540 2 units in operation
3 PHWR-700 NPCIL India 700 4 units under construction
4 KLT-40S OKBM Afrikantov Russian Federation 70 2 units under construction
Tsinghua Detailed design5 HTR-PM Tsinghua University China, Republic of 250 Detailed design,
2 modules under construction
6 CAREM-25 CNEA Argentina 27 Started site excavation in Sept 2011 construction in 20122011, construction in 2012
7 Prototype Fast Breed Reactor (PFBR-500) IGCAR India 500 Under construction –
Commissioning in mid 2012g
9 CNP-300 CNNC China, Republic of 300 3 units in operation,2 units under construction
IAEA
SMRs for Near-term Deployment
NameDesign
OrganizationCountry of
OriginElectrical Capacity,
MWeDesign Status
1System Integrated Modular Advanced Reactor (SMART)
Korea Atomic Energy Research Institute Republic of Korea 100
Standard Design Approval Received 4 July 2012
2 mPower Babcock & Wilcox United States of America 180/module Detailed design, to apply for
certification - end of 2013
3 NuScale NuScale Power Inc. United States of America 45/module Detailed design, to apply for
certification - end of 2013
4 VBER-300 OKBM Afrikantov Russian Federation 300 Detailed designFederation g
5 SVBR-100 JSC AKME Engineering Russian Federation 100 Detailed design for
prototype construction
6 Westinghouse Westinghouse United States of 225 Detailed Design6 gSMR Westinghouse America 225 Detailed Design
7 Super-Safe, Small and Simple (4S) Toshiba Japan 10 Detailed design
IAEA
Example of SMRs for Long-term Deployment
Name DesignOrganization
Country of Origin
Electrical Capacity,
MWDesign StatusOrganization Origin MWe
1 IRIS IRIS International Consortium
United States of America 335 Conceptual Design
P R t2
Power Reactor Innovative Small
Modular (PRISM)GE Hitachi United States of
America 311 Detailed Design
3AHWR300-LEU
using Thorium MOX BARC India 300 Conceptual DesigngFuel
p g
4 Integrated Modular Water Reactor (IMR)
Mitsubishi Heavy Industries Japan 350 Conceptual Design
5 Flexblue DCNS France 50-250 Conceptual Design
6 FBNR FURGS Brazil 72 Conceptual Design
7 VK-300 RIAR Russian Federation 100/300 Conceptual Design
IAEA8 EM2 General Atomics USA 240 Conceptual Design
SMR for Near-term Deployment SMARTSMARTSMARTSMART• Full name: System-Integrated Modular
© 2011 KAERI – Republic of Korea
y gAdvanced Reactor
• Designer: Korea Atomic Energy Research Institute (KAERI), Republic of KoreaInstitute (KAERI), Republic of Korea
• Reactor type: Integral PWR• Coolant/Moderator: Light Water
N t S t Th l N t• Neutron Spectrum: Thermal Neutrons• Thermal/Electrical Capacity:
330 MW(t) / 100 MW(e)• Fuel Cycle: 36 months• Salient Features: Passive decay heat
removal system in the secondary side; y yhorizontally mounted RCPs; intended for sea water desalination and electricity supply in newcomer countries with small grid
IAEA• Design status: Standard Design Approval
just granted on 4 July 2012
SMART – Safety Systems• Inherent Safety
• No Large Break : vessel penetration < 2 inch• Large Primary Coolant Inventory per MW • Low Power Density (~2/3)• Large PZR Volume for Transient Mitigation• Low Vessel Fluence• Large Internal Cooling Source (Sump-integrated IRWST)
• Engineered Safety Featuresg y• Passive Residual Heat Removal System (50 % x 4 train)
• Natural Circulation• Replenish-able Heat Sink (Emergency Cooling Tank)
• Safety Injection System (100 % x 4 train)• Direct Vessel Injection from IRWST
• Shutdown Cooling System (100 % x 2 Train)• Containment Spray System (2 Train)• Containment Spray System (2 Train)
• Severe Accident Management• In-Vessel Retention and ERVC
IAEA• Passive Hydrogen Control (PARs)
24
SMR for Immediate Deployment CAREMCAREM--2525CAREMCAREM 2525
• Full name: Central Argentina de Elementos
Modulares• Designer: National Atomic Energy
Commission of Argentina (CNEA)• Reactor type: Integral PWR• Coolant/Moderator : Light Water• Neutron Spectrum: Thermal NeutronsNeutron Spectrum: Thermal Neutrons• Thermal/Electrical Capacity: 87.0 MW(t) /
27 MW(e)• F el C cle 14 months• Fuel Cycle: 14 months• Salient Features: primary coolant system
within the RPV, self-pressurized and relying ti l t l tientirely on natural convection.
• Design status: Site excavation started for construction in 2012
IAEA
CAREM-25 – Safety Systems© 2011 CNEA A i
• Two (2) Shutdown
© 2011 CNEA - Argentina
( )Systems:1. First SS: by Control Rods =
Fast SS + Reactivity AdjustFast SS + Reactivity Adjust and Control System (ACS)
2. Second SS: Boron injection
• Passive Residual Heat Removal System (PRHS):
I l ti C d• Isolation Condensers
• Low Pressure Injection System:System:• Accumulators
IAEA 26
CAREM-25 – Suppresion Pool Type Containment© 2011 CNEA A i© 2011 CNEA - Argentina
IAEA 27S/P type C/V, reinforced concrete with stainless steel liner, 0.5 MPa Design Pressure
CAREM-25 –Severe Accident Prevention and Mitigationg
• Severe Accident Prevention:• A grace period extension, under the hypothesis of SBO longer than 72 hrs.,
by autonomous systems (fire extinguishing external pumps);• Water injection into the PRHRS pool;• Water injection into the PRHRS chamber;• Suppression pool cooling;
• Severe Accident Mitigation:• Severe Accident Mitigation:• In-vessel Corium retention: RPV external cooling by gravity;• Hydrogen passive autocatalytic recombiners.y g p y
• Passive safety system adoption and extended grace period result in very low frequency of core meltdown, the provision
id d f D f i D th L l 4considered for Defence-in-Depth Level 4.
IAEA 28
SMR for Near-term DeploymentNuScaleNuScaleNuScaleNuScale
• Full name: NuScaleFull name: NuScale• Designer: NuScale Power Inc., USA• Reactor type: Integral Pressurized Water
ReactorReactor• Coolant/Moderator: Light Water• Neutron Spectrum: Thermal Neutrons• Thermal/Electrical Capacity:
165 MW(t)/45 MW(e)• Fuel Cycle: 24 monthsy• Salient Features: Natural circulation cooled;
Decay heat removal using containment; built below groundg
• Design status: Design Certification application expected in 4th Quarter of 2013
IAEA
NuScale - Decay Heat Removal System© 2011 N S l P I
• Two independent single-failure-
© 2011 NuScale Power, Inc.
proof trains• Closed loop system• Two phase natural circulation• Two-phase natural circulation
operation• DHRS heat exchangers
nominally full of water • Supplies the coolant inventory• Primary coolant natural• Primary coolant natural
circulation is maintained• Pool provides a 3 day cooling
supply for decay heat removal
IAEA 30
NuScale - Decay heat removal using Containment© 2011 N S l P I
• Provides a means of removing core decay heat and limits
© 2011 NuScale Power, Inc.
ycontainment pressure by:
• Steam Condensation• Convective Heat Transfer• Heat Conduction• Sump Recirculation
• Reactor Vessel steam is vented th h th t t lthrough the reactor vent valves (flow limiter)
• Steam condenses on containment• Condensate collects in lower
containment region • Reactor Recirculation Valves open p
to provide recirculation path through the core
• Provides 30+ day cooling followed
IAEA
y gby indefinite period of air cooling.
31
Implications of Fukushima on NuScale
• No major impact to the NuScale design is currently ti i t danticipated.
• The NuScale design fully addresses decay heat removal for prolonged station blackout.
• As a result of the Fukushima event, NuScale will• Add long term air-cooling test to NuScale Integral System Test Matrix and
SIET d h t l t t t d t t ff ti f i iSIET decay heat removal tests to demonstrate effectiveness of passive air-cooling with an empty reactor building pool.
• Review Spent Fuel Pool Cooling capability under air-cooled conditions.• Examine role of “Island Mode” operation for multi-module plant.• Confirm adequacy of existing seismic design basis for NuScale (0.5g ZPA)
and ensure efforts are consistent with ongoing industry efforts.g g y• Review NRC recommendations when they become available and determine
applicability to NuScale.
IAEA 32
SMR for Near-term Deployment:mPowermPowermPowermPower
• Full name: mPowerDesigner Babcock & Wilco Mod lar• Designer: Babcock & Wilcox Modular Nuclear Energy, LLC(B&W), United States of AmericaR t t I t l P i d W t• Reactor type: Integral Pressurized Water Reactor
• Coolant/Moderator: Light Water• Neutron Spectrum: Thermal Neutrons• Thermal/Electrical Capacity:
530 MW(t) / 180 MW(e)( ) ( )• Fuel Cycle: 48-month or more• Salient Features: integral NSSS, CRDM
inside reactor vessel; Passive safety thatinside reactor vessel; Passive safety that does not require emergency diesel generator
• Design status: Design Certification application expected in 4th Quarter of 2013
IAEAapplication expected in 4 Quarter of 2013
mPower – Inherent Safety Features
• Low Core Linear Heat Rate:• Low power density reduces fuel and clad temps during accidents• Allows lower flow velocities that minimizes flow induced vibration
effectseffects
• Large Reactor Coolant System Volume:• Allows more time for safety system response in the case of accidentAllows more time for safety system response in the case of accident• More coolant is available during SBLOCA providing continuous
cooling to protect the core
• Small Penetrations at High Elevations:• Increase the amount of coolant left in the vessel after a SBLOCA
R d t f l t t i t lti i l• Reduce rate of energy release to containment resulting in lower containment pressures
IAEA 34
mPower - Decay Heat Removal System© 2011 Babcock & Wilcox Nuclear Energy, Inc.
IAEA 35
mPower – Containment System© 2011 Babcock & Wilcox Nuclear Energy, Inc.
• Underground containment, fuel storage and ultimate heat sink;storage and ultimate heat sink;
• Metal containment vessel;• Volume limits internal pressure
for all design basis accidents;• Simultaneous refuelling and
NSSS equipment inspections;NSSS equipment inspections;• Environment suitable for
human occupancy during normal operationnormal operation
IAEA 36
SMR for Near-term Deployment4S4S4S4S
• Full name: Super-Safe, Small and Simple
© 2011 TOSHIBA CORPORATION
Simple • Designer: Toshiba Corporation, Japan• Reactor type: Liquid Sodium cooled,
Fast Reactor but not a breederFast Reactor – but not a breeder reactor
• Neutron Spectrum: Fast NeutronsT bi / • Thermal/Electrical Capacity:
30 MW(t)/10 MW(e)• Fuel Cycle: without on-site refueling
Turbine/Generator
with core lifetime ~30 years. Movable reflector surrounding core gradually moves, compensating burn-up reactivity l 30
Steam Generator
loss over 30 years.• Salient Features: power can be
controlled by the water/steam system Reactor
IAEAwithout affecting the core operation
• Design status: Detailed Design
4S – Passive Decay Heat Removal • Natural air draft and natural circulation
• RVACS: Natural air draft outside the guard vessel
© 2011 TOSHIBA CORPORATION
RVACS: Natural air draft outside the guard vessel• IRACS: Natural circulation of sodium and air draft at air cooler
Air outlet Air outletAir outlet Air outlet Primary temperature(~260,000sec)
IRACS (Air Cooler)
Air inlet
IRACS (Air Cooler)
Air inlet
y ( )
450
500
550
ure
(℃)
Core-inletCore-outlet
Sodium flow
Air inlet
inlet
SG
Sodium flow
Air inlet
inlet
SG 250
300
350
400
Tem
pera
t
Guard Vessel
SG
Guard Vessel
SG 2500 50,000 100,000 150,000 200,000 250,000
Time (s)
Core temperatureduring loss of power
RVACS
Air flow pass
RVACS
Air flow pass RVACS: Reactor Vessel Auxiliary Cooling System,
during loss-of-poweronly with natural circulation
IAEA 38
y g y ,IRACS : Intermediate Reactor Auxiliary Cooling System
4S – Radionuclide Containment
• Fuel
Top DomeN2 gas
© 2011 TOSHIBA CORPORATION
• Fuel• Fuel cladding
R t l (t ff t• Reactor vessel (trap effect by sodium)
• Containment• Containment• Guard vessel• Top domeTop dome• Mitigation of sodium fire by
nitrogen gas inside the top domedome
• Reactor buildingGuard
IAEA 39
Guard vessel
4S – Severe Accident Prevention and Mitigation Approachesg pp
Safety Related Issues 4S’s safety design to mitigate and prevent from severe accident
Station black out (SBO)Core damage is avoidable without any emergency power supply by passive decay heat removal system with natural circulation, not necessary the pump. There is no limitation for duration time.
Spent fuel poolNo need for spent fuel pool due to long-term cooling (about 1 year) after the long-term operation (i.e., 30 years) and then stored in dry cask for the 10MWe-4S.
Final heat sink in emergency situations
Air is the final heat sink (RVACS and/or IRACS), not depends on water and any emergency power (passive decay heat removal system).
Containment system reliability Containment system is consisted of top dome and guard vesselContainment system reliability Containment system is consisted of top dome and guard vessel.
Earthquakes Supporting the reactor building by seismic isolator.
Redundant shutdown system and passive decay heat removal
Tsunami / Flood
Redundant shutdown system and passive decay heat removal system without external power supply and emergency power system. Reinforced reactor building to protects from massive water invasion by keeping its water-tightness.
IAEA 40
Aircraft hazard Constructed under ground.
SMR for Immediate DeploymentSVBRSVBR--100100SVBRSVBR 100100
• Designer: JSC AKME Engineering
© 2011 JSC AKME Engineering
• Designer: JSC AKME Engineering –Russian Federation
• Reactor type: Liquid metal cooled fast treactor
• Coolant/Moderator: Lead-bismuth• System temperature: 500oC• Neutron Spectrum: Fast Neutrons• Thermal/Electric capacity: 280 MW(t) /
101 MW(e)101 MW(e)• Fuel Cycle: 7 – 8 years• Fuel enrichment: 16.3%
Di ti i hi F t Cl d l• Distinguishing Features: Closed nuclear fuel cycle with mixed oxide uranium plutonium fuel, operation in a fuel self-sufficient mode
IAEAsufficient mode
• Design status: Detailed design
SVBR-100 Safety Principles© 2011 JSC AKME Engineering
IAEA 42
Newcomer Countries Considerations
Robust EEnergy Policy
IntegratedInfrastructure
Security of Supply +
GRID
Proliferation resistance &
physical t ti
Affordability(Capital & electricity
Introduction of the first Nuclear Power Plant
protectiony
costs)
Public acceptance
Economic Competitive
ness
NuclearSafety
Domestic Industry
Participation
IAEA 43
Viable financing scheme
Current Newcomer Countries PlanA paradox of SMR Deployment in Newcomer countries
Country Grid Capacity in GWe
Current Deployment Plan
A paradox of SMR Deployment in Newcomer countries
in GWeBangladesh 5.8 2 x 1000 MWe PWRs in Rooppur in 2018Vietnam 15.19 4 x 1000 MWe PWRs in Ninh Thuan #1 by 2020
4 x 1000 MWe PWRs in Ninh Thuan #2 by 2025Jordan 2.6 2 x 1000 - 1100 MWe PWR in + possible
interest in SMRUAE 23.25 4 x 1400 MWe PWR in Braka by 2018Belarus 8.03 2 x 1200 MWe PWR in Ostrovets by 2018Turkey 44.76 4 x 1200 MWe PWR in Akkuyu by 2022Malaysia 25.54 2 x 1000 MWe LWRs, 1st unit by 2021Indonesia 32 8 2 x 1000 LWRs with potential interest ofIndonesia 32.8 2 x 1000 LWRs, with potential interest of
deploying Small Reactors for industrial process and non-electric applications by 2024
IAEA 44
Commercial Availability limits Newcomer Countries in SMR Technology Selection
New entrants with active participation in IAEA’s Programme on SMRin IAEA s Programme on SMR
Country Grid Capacity in GWe
Current Plan Rationales(in addition to the small grid capacity)
Mongolia 0.83 Potential for future SMR deployment Energy supply security + non-electric application(s)
Egypt 24.67 Had considered 1000 MWe Class LWR and/or SMR
Energy supply security + non-electric application(s)
Ghana 1.99 Potential for future SMR deployment Energy supply security
Kenya 1.71 Potential for future SMR deployment Energy supply security
Morocco 6.16 Potential for future SMR deployment Energy supply securityMorocco 6.16 Potential for future SMR deployment Energy supply security
Nigeria 5.9 Potential for future SMR deployment Energy supply security + non-electric application(s)
Sudan 2.34 Potential for future SMR deployment Energy supply security + non-electric application(s)
Tunisia 3.65 Potential for future SMR deployment Energy supply security + non-electric application(s)
Algeria 10.38 Potential for future SMR deployment Energy supply security + non-electric application(s)
Albania 1.6 Potential for future SMR deployment Energy supply security
Croatia 4.02 Potential for future SMR deployment Energy supply security
IAEA 45
Jamaica < 3 Potential for future SMR deployment Energy supply security
Uruguay 2.25 Potential for future SMR deployment Energy supply security
Reactors Under Construction with SMR category
Country ReactorModel
Output(MWe)
Designer Number of units
Site, Plant ID, and unit #
CommercialStart
I di PHWR 700 640 NPCIL 2 K k 3 d 4 6/2015 d 12/2015India PHWR 700 640 NPCIL 2 Kakrapar 3 and 4 6/2015 and 12/2015
PHWR 700 640 NPCIL 2 Rajashtan units 7 and 8 6/2016 and 12/2016
PFBR 500 500 IGCAR 1 PFBR Kalpakkam 2015(LMFBR)
p
Pakistan CNP-300 300 CNNC -China
2 Chasnupp 3 and 4 12/2016
Romania CANDU-6 620 AECL 3 Chernavoda units 3 4 and 5 2016 2017 2018Romania CANDU-6 620 AECL 3 Chernavoda units 3, 4 and 5 2016, 2017, 2018
RussianFederation
KLT-40S(ship-borne)
30 OKBMAfrikantov
2 Akademik Lomonosov 2012
Slovakia VVER-440 405 OKB 2 Mochovce 3 and 4 ~ 2018Slovakia VVER 440(V213)
405 OKBGidropress
2 Mochovce 3 and 4 2018
China HTR-PM(GCR)
200 Tsinghua Univ./ Harbin
1 Shidaowan unit 1 2017 ~ 2018
Argentina CAREM 25 27 CNEA 1 Formosa unit 1 2017 2018Argentina CAREM-25(a prototype)
27 CNEA 1 Formosa unit-1 2017 ~ 2018
IAEA 46
Identified Issues from Fukushima Nuclear Accident
• Expanded scenario of Design Basis Accident (DBA) Multiple external initiating events and common cause failuresinitiating events and common cause failures
• Station blackout mitigation• Ultimate heat sink for core and containment cooling in post severe accident• Reliability of emergency power supply• Optimization of the grace period (i.e. operator coping time)
E h d t i t h d d i t th• Enhanced containment hydrodynamic strength• Hybrid passive and active engineered safety features• Safety viability of multiple-modules – first of a kind engineeringSafety viability of multiple modules first of a kind engineering• Accident management, emergency response capability and costs• Seismic and cooling provisions for spent fuel pool • Hydrogen generation from steam-zirconium reaction; recombiner system• Environmental impact assessment and expectation
C t l h bit bilit i t id t t i tIAEA
• Control room habitability in post accident transient47
IAEA Response to the Global Trend
• Project 1.1.5.5:C T h l i d I f SMRCommon Technologies and Issues for SMRs
• Objective: To facilitate the development of key bli t h l i d th l ti f blienabling technologies and the resolution of enabling
infrastructure issues common to future SMRsA ti iti (2012 2013)• Activities (2012 – 2013):• Formulate roadmap for technology development incorporating
safety lessons-learned from the Fukushima accidentsafety lessons learned from the Fukushima accident• Review newcomer countries requirements, regulatory infrastructure
and business issues• Define operability-performance, maintainability and constructability
indicators• Develop guidance to facilitate countries with planning for SMRs
IAEADevelop guidance to facilitate countries with planning for SMRs technology implementation
48
2014 – 2017 Vision, Challenges .. etc
• Enhanced understanding on prioritized various safety action plans on Post F k shima (in depth elaboration)action plans on Post-Fukushima (in-depth elaboration)
• Operational Issues for SMRs – Overcoming Constraints:• Licensability of non LWR technologies in newcomer countries• Licensability of non-LWR technologies in newcomer countries• Control room staffing and human factors• Connection to the gridg• Site specific exclusion zones and EPZs
• Deploying SMRs in Developing / Newcomer Countries• Integrated infrastructure development• International regulatory frameworks
F l l i• Fuel cycle preparations• First of a kind cost estimate• Integration with renewable energy resources
IAEAIntegration with renewable energy resources
• Does SMR help Public Acceptance after Fukushima accident?49M. Hadid Subki (NENP/NPTDS) - SMR
Technology Development
Summary• SMR is an attractive option to enhance energy supply
security in newcomer countries with small grids and y gless-developed infrastructure;
• SMRs have the potential to provide significantly enhanced plant robustnessenhanced plant robustness
• Innovative SMR concepts have common technology development challenges:
• licensability, competitiveness, control room staffing for multi-modules plant, and so forth.
• Needs to address lessons-learned from the F k hi id t i t th d i d l t dFukushima accident into the design development and plant deployment
• The key is: SMR Deployment must demonstrate commitment toThe key is: SMR Deployment must demonstrate commitment to nuclear safety
IAEA 50
… Thank you for your attention.… Thank you for your attention.
IAEA For inquiries, please contact: Dr. M. Hadid Subki <[email protected]> 51
2011 IAEA Major Workshops on Advanced Reactor Technology Developmentgy p
• Interregional Workshop on “Advanced Nuclear Reactor Technology for Near Term Deployment” on 4 - 8 July 2011Deployment on 4 8 July 2011 http://www.iaea.org/NuclearPower/Technology/Meetings/2011-Jul-4-8-ANRT-WS.html
• Technical Meeting on “Options to Enhance Energy Supply Security with NPPs basedTechnical Meeting on Options to Enhance Energy Supply Security with NPPs based on SMRs” on 3 - 6 October 2011 http://www.iaea.org/NuclearPower/Technology/Meetings/2011-Oct-3-6-SMR-TM.html
• INPRO Dialog Forum on Nuclear Energy Innovations: “Common User Considerations for SMRs” on 10 – 14 October 2011 http://www.iaea.org/INPRO/3rd_Dialogue_Forum/index.html
• Workshop on “Technology Assessment of SMR for Near-Term Deployment” on 5 – 9 December 2011http://www iaea org/NuclearPower/Technology/Meetings/2011 Dec 5 9 WS SMR htmlhttp://www.iaea.org/NuclearPower/Technology/Meetings/2011-Dec-5-9-WS-SMR.html
Please click the links to download the detailed presented materials.
IAEA 52