Transcript
Page 1: GREEN LANEM2 TO GILLINGHAM (WB) COOKHAM …...PROPOSED RETAINING WALL EXISTING M2 BRIDGE NOISE IMPORTANT AREAS SCHEDULED MONUMENTS EXISTING FOOTPATH PROPOSED PUBLIC FOOTPATH SCHEME

C

r

a

d

le

O

a

k

(

s

ite

o

f)

M

o

tte

a

n

d

B

a

ile

y

GAP IN THE HEDGE CREATED

FOR FIELD ACCESS

S

I

T

T

I

N

G

B

O

U

R

N

E

T

O

M

A

I

D

S

T

O

N

E

(

A

2

4

9

S

B

)

GR

EE

N LA

NE

M2 J5

M

A

I

D

S

T

O

N

E

T

O

S

I

T

T

I

N

G

B

O

U

R

N

E

(

A

2

4

9

N

B

)

M

2

T

O

G

I

L

L

I

N

G

H

A

M

(

W

B

)

M

2

T

O

C

A

N

T

E

R

B

U

R

Y

(

E

B

)

OA

D

ST

RE

ET

E

X

I

S

T

I

N

G

M

2

H

O

N

E

Y

C

R

O

C

K

H

IL

L

DANAWAY

VILLAGE

G

R

EE

N

LA

N

E

(T

R

AC

K)

C

H

U

R

C

H

H

I

L

L

A

M

E

L

S

H

IL

L

(

T

R

A

C

K

)

GR

EE

N LA

NE

SANDINA

VALLEY

VIEW FARM

WHITE

HOUSE

THE COACH

HOUSE

VALE

COTTAGES

T

H

E

G

A

T

E

H

O

U

S

E

P

E

T

T

R

O

A

D

WHIPSTAKES

FARM

W

H

I

P

S

T

A

K

E

S

H

I

L

L

C

H

E

S

T

N

U

T

W

O

O

D

S

T

O

C

K

B

U

R

Y

V

A

L

L

E

Y

C

O

O

K

H

A

M

S

H

A

W

CRADLE OAK

(SITE OF)

C

H

U

R

C

H

L

A

N

E

M

A

I

D

S

T

O

N

E

R

O

A

D

NEW MAIDSTONE

ROAD LINK J5 - L2

PROPOSED A249 - L1

SLIP ROAD DIVERGE (SB)

PROPOSED A249 - L3 SLIP

ROAD MERGE (SB)

PROPOSED A249 - L4

SLIP ROAD DIVERGE (NB)

M2 - L1

SLIP ROAD

PROPOSED A249 - L2

SLIP ROAD MERGE (NB)

A249 MAINLINE

J5 - L1

M2 - L2

SLIP ROAD

NEW FLYOVER

J5 - L3

PROPOSED ACCESS

TO BOWL REED

CHURCH WOOD

KEY:

PROPOSED HIGHWAY LAYOUT

PROPOSED RETAINING WALL

EXISTING M2 BRIDGE

NOISE IMPORTANT AREAS

SCHEDULED MONUMENTS

EXISTING FOOTPATH

PROPOSED PUBLIC FOOTPATH

SCHEME BOUNDARY

EXISTING VEGETATION

Drawing Title

Project TitleDrawing Suitability

DO

N

OT

S

CA

LE

Client

Status

Millim

etres

10

010

0

Drawing Number

Project Originator Volume

Location Type RoleNumber

-

- - -

--

A1

Scale:

Original

Size:

Rev:

Project

Ref. No:

of

Sheet:

Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

Description

Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

Description

Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

Description

Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

Description

Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

Description

This Drawing is saved on ProjectWise. Plotted: 30/05/2019 09:24:42 By: HEGD4739

A1APPROVED - PUBLISHED M2 Junction 5 Improvement

M2 JUNCTION 5 IMPROVEMENT

SCHEME - DESIGN FIX 3

1:2500

CJ

1

AH

1

SM HC 29/05/19

HE551521 ATK GEN

XX_A SK ZX 000001

C01C01A1

STAGE 3 DESIGN FIX 3

5158158

M2J5 SCHEME DESIGN

PROPOSED INFILTRATION BASIN

PROPOSED HIGHWAY FENCE LINE

PROPOSED INFILTRATION

POND FENCE LINE

PRIVATE FENCE LINE

TEMPORARY FENCE LINE

PROPOSED PLANTING

GRASSLAND AND SCRUBS

PROPOSED HEDGEROW

WOODLAND PLANTING

WOODLAND AND GRASSLAND

GRASSLAND

AMENITY GRASSLAND

TREES

ANCIENT WOODLAND

Top Related