Grid Connected Rooftop PV Systems
भारतीय सौर ऊजा िनगम िलिमटेडभारतीय सौर ऊजा िनगम िलिमटड(भारत सरकार का उपबम)
1st Floor, Religare Building
D‐3 District Centre, Saket, New Delhi‐110017
BIOMASS SMALL HYDRO
Renewable Energy Targets :175 GW by 2022
ENERGY10 GW
POWER5 GW
SOLAR ENERGY100 GW
20 GW
WIND ENERGY60 GW
Solar Parks -VGF/GBI/Bundling
30 GW10 GW 40 GW
Govt./States/ Private -
VGF/GBI/BundlingSolar Parks -
VGF/GBI/Bundling Solar Rooftop
Solar Energy: Global Scenario
38.240
45
Installed Solar Capacity (GW)
38.2
28.1
23.324.8
25
30
35
40
23.3
18.316.316.3
7 210
15
20
25
6.84.7
7.2
2.80.75
0
5
10
Germany China Japan USA UK IndiaGermany China Japan USA UK India
Total Solar Rooftop Solar
Source: TERI/KFW/MNRE
About SECI
• SECI came into existence on 20th September, 2011 with a Cabinet approvalof the Govt. of India with authorised share capital of Rs. 2000 Cr.
• Main objects include:
• SECI came into existence on 20th September, 2011 with a Cabinet approvalof the Govt. of India with authorised share capital of Rs. 2000 Cr.
• Main objects include:To channelize Government investments into Solar energy sector;To implement MNRE schemes in commercial mode for large‐scalecapacity addition;
b ld d l
To channelize Government investments into Solar energy sector;To implement MNRE schemes in commercial mode for large‐scalecapacity addition;
b ld d lTo build, own and operate Solar projects;To set industry benchmarks of quality and performance;To be the first‐mover in technology for widespread replication;
To build, own and operate Solar projects;To set industry benchmarks of quality and performance;To be the first‐mover in technology for widespread replication;To generate competition in the solar energy market and to make itself‐sustaining;To take India’s solar expertise across the country and beyond.
To generate competition in the solar energy market and to make itself‐sustaining;To take India’s solar expertise across the country and beyond.
• Registered as “Section 3” company under Companies Act ‐ 2013• Net Profit in FY 15‐16: Rs. 21 crores (tentative)• Recently converted to commercial company. Mandate expanded to cover
• Registered as “Section 3” company under Companies Act ‐ 2013• Net Profit in FY 15‐16: Rs. 21 crores (tentative)• Recently converted to commercial company. Mandate expanded to cover
May 2016
Recently converted to commercial company. Mandate expanded to coverentire RENEWABLE ENERGY domain.Recently converted to commercial company. Mandate expanded to coverentire RENEWABLE ENERGY domain.
SECI’s ActivitiesSolar project development• Setting large scale/rooftop solar projects of its own and for others
VGF schemes for large scale projects• 750 MW, 2000 MW, 5000 MW schemes and other special
schemesschemesRooftop schemes• Brought in competition, resulted in projects across 20
States, 70+ cities,Solar parks scheme• Also executing 6 solar parks as JV partner
P t diPower trading• Large-scale interstate trading of Solar power for the first time
Project Management Consultancy
SECI Rooftop Activities : OngoingGrid connected Rooftop Scheme (Phase I to IV)Grid connected Rooftop Scheme – (Phase I to IV) PAN India:
80 MWpp73 MW Rooftop scheme for Warehouses
50 MWp Rooftop Scheme for CPWD in RESCO mode
500 MWp Rooftop Scheme under 30% Subsidy –PAN I diPAN India
1000 MWp Rooftop Scheme without Subsidy1000 MWp Rooftop Scheme without Subsidy
Growing Solar Installations in IndiaState/UT (MW) %Rajasthan 1269.93 18.78%G j t 1119 17 16 55%Gujarat 1119.17 16.55%Tamil Nadu 1061.82 15.70%Madhya Pradesh 776.37 11.48%Andhra Pradesh 572.97 8.47%Telangana 527.84 7.81%Punjab 405 06 5 99%Installed Solar Capacity (MWp) Punjab 405.06 5.99%Maharashtra 385.76 5.70%Karnataka 145.46 2.15%Uttar Pradesh 143.50 2.12%Chhattisgarh 93.58 1.38%Odisha 66.92 0.99%
67636000
7000
8000
p y ( p)
Odisha 66.92 0.99%Uttarakhand 41.15 0.61%Jharkhand 16.19 0.24%Haryana 15.39 0.23%Delhi 14.28 0.21%Kerala 13.05 0.19%
3002
3000
4000
5000
6000
West Bengal 7.77 0.11%Chandigarh 6.81 0.10%Andaman & Nicobar 5.10 0.08%Bihar 5.10 0.08%Tripura 5.00 0.07%
3 11 36936
1684
1000
2000
3000
Daman & Diu 4.00 0.06%J & K 1.00 0.01%Lakshadweep 0.75 0.01%Arunachal Pradesh 0.27 0.00%Himachal Pradesh 0.20 0.00%
0
2008‐09 2009‐10 2010‐11 2011‐12 2012‐13 2013‐14 2014‐15
Source: MNRE, as on 31st March 2016
Mizoram 0.10 0.00%Puducherry 0.03 0.00%Others (PSU/Channel Partners) under Rooftop 58.31 0.86%TOTAL 6762.85 100.00%
Rooftop Solar Installed Capacity in IndiaAs on 31st March 2016
State/UT (MW) %Tamil Nadu 85.4 11.54%Gujarat 62.6 8.46%Maharashtra 62.3 8.42%Punjab 55 7.43%Karnataka 47 6.35%Rajasthan 44.4 6.00%Uttar Pradesh 43.4 5.86%Telangana 37 5.00%Andhra Pradesh 36 4.86%Haryana 35 4.73%Delhi 32 4.32%Chh tti h 30 4 05%Chhattisgarh 30 4.05%North Eastern States 20.3 2.74%Kerala 19 2.57%Bihar 16 2.16%Madhya Pradesh 16 2 16%Madhya Pradesh 16 2.16%Chandigarh 13 1.76%Odisha 12 1.62%Uttarakhand 12 1.62%West Bengal 12 1.62%Jharkhand 10.5 1.42%Jammu & Kashmir 9.1 1.23%Others 30 4.05%Total 740 100% Source: Bridge to India
Price trend of Rooftop projectsTrend of Project cost in Various Phases of Grid Connected
90 89 90
Log. (Weighted Average (Rs. /Wp))
Trend of Project cost in Various Phases of Grid Connected rooftop Scheme
83
87.9690 89
84.590
84.3873.85
70.72 72.868 76./
Wp)
5863 63.8
68.76
ect C
ost (Rs
44.8Proj
• Open Competitive bidding process have resulted in lowering of Benchmark cost from Rs. 130/Wpto Rs. 80/Wp
Phase‐1 Phase‐2 Phase‐3 Phase‐4‐Part‐1 Phase‐4‐Part‐2Jan,13 May,13 Sept,13 Mar,14 Feb, 15
p• Discovered project costs through competition are even lower than the benchmark cost
*These project cost includes MNRE CFA
Trend of Solar Rooftop PV Levellised Tariff
6 088
6.491
6 923
6.923
6 5
7
7.5h)
5.371
5.49
5 59
5.59 5.68
5.68
5.69
5.76
6.088
6.16.721
6.923
5
5.5
6
6.5
riff (R
s/kW
h
5.39 5.59 5.59
4
4.5
5Ta
S
Weighted average tariff : Rs. 5.74/kWh
State
Maximum: Rs. 6.92/kWhMinimum : Rs 5.37/kWh
State‐wise capacities in SECI’s schemes
Total Capacity Allocated : 123 MWpTotal Capacity Sanctioned : 63 MWp
20.0
State‐wise Allocation and Project Sanctions
13.5
11.3
17.2
10.68.9
10.611.412.1
10 110 012.014.016.018.020.0
y in M
W
Total Allocations Total Sanctions
8.9
6.74.9 4.8 4.5
2.0 2.8 2.1 2.61.0 1.0 1.0 0.4
6.0
10.1
7.45.8
4.4 4.35.6
3.1 3.02.1 1.6 0.9 0.8 0.8 0.7 0.60 0
2.04.06.08.010.0
Capa
city
0.0
State
Segment–wise distribution of Rooftop SPV Power PlantsPower Plants
[PERCENTAGE[PERCENTAGESegment wise Installed Capacity
Sector
Installed Capacity (kWp)
Industrial 30452
[PERCENTAGE]
[PERCENTAGE]
[]
Industrial
Government Industrial 30452Government Buildings/PSUs 19090
Institutional 8363
[PERCENTAGE]
[PERCENTAGE]
Buildings/PSU'sInstitutional
CommercialCommercial 3393
Hospitals 2393
NGO 572
Residential 40
[PERCENTAGE]
Commercial
Hospitals
NGOResidential 40
64302NGO
Residential
Top 10 vendors in SECI’s Rooftop Program
0 1000 2000 3000 4000 5000 6000 7000
Total Sanctioned Capacity (kWp)
6312
5820
TATA POWER SOLAR SYSTEMS LTD
JAKSON ENGINEERS LTD.
12
3993
3900
CLEAN MAX ENVIRO ENERGY SOLUTIONS PVT. LTD.
THERMAX LIMITED
34
3826
3726
HERO SOLAR ENERGY PVT. LTD.
SUNEDISON SOLAR POWER INDIA PVT. LTD
RELYON SOLAR PVT LTD
56
3105
2796
2577
RELYON SOLAR PVT. LTD.
FOURTH PARTNER ENERGY PVT. LTD.
KEC INTERNATIONAL LIMITED
78
2577
2300
KEC INTERNATIONAL LIMITED
ELCOMPONICS TECHNOLOGIES INDIA PVT. LTD.
910
Rooftop Solar Policy Status in CountryNet Metering
State Solar Policy PolicyAndhra Pradesh 2015 YesBiharChhattisgarh 2012 YesDelhi Draft YesGujarat 2015 YesHaryana 2014 YesHimachal Pradesh 2014 YesHimachal Pradesh 2014 YesJammu & Kashmir 2013Jharkhand 2015 YesKarnataka 2014 YesKerala 2013 YesKerala 2013 YesMadhya Pradesh 2012 YesMaharashtraOdisha 2013 YesPunjab YesRajasthan 2011 YesTamil Nadu 2012 YesTelangana 2015 YesUttar Pradesh 2013 YesUttarakhand 2013 YesWest Bengal Yes
“Be the change you want to see in the world”