Download - Group A2 Introduction Presentation
-
8/15/2019 Group A2 Introduction Presentation
1/52
VASCON ENGINEERS
Ltd. An introduction to company’s business, strength
& strategy
Kunal mandalaywala, CP0712
Shridhar Nayak, CP0812
Arjun Patel, CP0912
Akansha Rathi, CP1012
Arpana Roy, CP1112
Romil Sagar, CP1212
PRESENTED BY:
-
8/15/2019 Group A2 Introduction Presentation
2/52
OVERVIEW
• VASCON are an engineering, procurement and construction servicesand real estate development company with operations in a number of states and union territories in India.
• According to a survey conducted by the Construction World publication in June 2007, they are among the top ten builders in
India, based on parameters such as size, brand or image, quality of construction, goodwill, innovative product offerings, socialobligations and commitments, use of technology and best business
practices.
• They provide EPC services and develop real estate directly or indirectly through our Subsidiaries and the Other Development
Entities.• Subsidiaries and the Other Development Entities engage Company
to provide EPC services for the development of their projects andCompany also provides EPC services independently to third parties
-
8/15/2019 Group A2 Introduction Presentation
3/52
OVERVIEW
• MISSION: They believe in providing high quality
and innovative projects on a timely basis.
• The Company commenced operations primarily
as an EPC services company in 1986.
• Operations span across all aspects of real estate
development, from identification and acquisition
of land to providing EPC services and sales andmarketing of their projects to operation of their
completed projects .
-
8/15/2019 Group A2 Introduction Presentation
4/52
OVERVIEW
• As of December 31, 2009, they had completed an aggregateof 181 EPC Contracts, with a total contract value of Rs.8,888.70 million.
• Third party EPC clients include well-known Indian and
multi-national companies such as Cipla Limited, Kirloskar Brothers Limited and Symbiosis.
• For the six months period ended September 30, 2009, theyhad consolidated total income of Rs. 3,620.39 million andconsolidated net profit, as restated, of Rs. 232.31 million
and for the fiscal year 2009, they had consolidated totalincome of Rs. 5,247.57 million and consolidated net profit,as restated, of Rs. 306.41 million.
-
8/15/2019 Group A2 Introduction Presentation
5/52
Strengths:
1. Significant experience and strong track record.
2. Diversified portfolio of business and diverse revenuestreams.
3. Quality and strength of execution.4. Emphasis on innovative and theme based
developments.
5. Qualified and proven project teams and experienced
management.6. Established brand name.
7. Effective development structure to optimise resources.
-
8/15/2019 Group A2 Introduction Presentation
6/52
Strategy:
1. Diversify geographically into new locations.
2. Optimise business mix.
3. Continue to grow our real estate development projects.
4. Maintain and upgrade high standards of
quality and reliability.
-
8/15/2019 Group A2 Introduction Presentation
7/52
PRESENTATION OVERVIEW
• SUMMARY OF BUSINESS, STRENGTHS AND STRATEGY
• SUMMARY FINANCIAL INFORMATION
• THE ISSUE
•
GENERAL INFORMATION• CAPITAL STRUCTURE
• OBJECTS OF THE ISSUE
• BASIS FOR ISSUE PRICE
• STATEMENT OF TAX BENEFITS
22-Aug-13 VASCON ENGINEERS LTD. 7
-
8/15/2019 Group A2 Introduction Presentation
8/52
SUMMARY FINANCIAL INFORMATION
Financial year ends on 31st March.
They have given consolidated as well as unconsolidated financial
statements.
Financial statement
22-Aug-13 VASCON ENGINEERS LTD. 8
http://d/sEM%203/IF/financial%20statements.pdfhttp://d/sEM%203/IF/financial%20statements.pdf
-
8/15/2019 Group A2 Introduction Presentation
9/52
EQUITY SHARE OFFERED:
Issued by the company:1,08,00,000
Employee reservation:1,00,000
QIB Portion
64,20,000
Non- institutionalportion
10,70,000
Net issue :1,07,00,000
Retail portion
32,10,000
-
8/15/2019 Group A2 Introduction Presentation
10/52
General information:
• They were originally incorporated on January 1, 1986 as a privatelimited company under the provisions of the Companies Act, 1956as Vascon Engineers Private Limited.
• They became a deemed public company by virtue of Section 43A of the Companies Act with effect from August 25, 1997 and were
renamed as Vascon Engineers Limited.• Consequent to the amendment of Section 43A of the Companies
Act, became a private limited company with effect from January16, 2001.
• Pursuant to a resolution of shareholders on December 7, 2006, theywere converted to a public limited company with effect fromDecember 7, 2006.
• Company Identification Number: U70100MH1986PLC038511
-
8/15/2019 Group A2 Introduction Presentation
11/52
Board of director of the issuer:
R. Vasudevan
Managing Director and Non-Independent
K.G. Krishnamurthy
Non-Executive Director and Non-Independent
Nominee director of HDFC Ventures Trustee Company Limitedacting in its capacity of trustee of HDFC Property Fund
V. Mohan
Chairman and Independent director
Ameet Hariani
Non-Executive Director and Non-IndependentR. Kannan
Independent Director
-
8/15/2019 Group A2 Introduction Presentation
12/52
• Refund Banker
– HDFC Bank • 5th, Atur Chambers,
Moledina Road, Campus,
Pune
• Bankers to the Company
– HDFC Bank Limited • HDFC Bank House,
Senapati Bapat Marg,Lower Parel,Mumbai 400 013
– State Bank of India• Industrial Finance Br., Pune,
Tara Chambers, Mumbai-Pune Road, Pune 411 003
• Auditors
– Anand Mehta & Associates
• Chartered Accountants Mulratna, First Floor, 334, Narshi Natha Street,Masjid (West), Mumbai 400 009
-
8/15/2019 Group A2 Introduction Presentation
13/52
• Monitoring Agency
– There is no requirement for a monitoring agency
for the Issue pursuant to Regulation 16 of the SEBI
ICDR Regulations.
• IPO Grading Agency
– CRISIL Limited
• 1061, Solitaire Corporate Park,151 Andheri Kurla Road, Andheri (E), Mumbai 400093
-
8/15/2019 Group A2 Introduction Presentation
14/52
List of Responsibilities between the
Book Running Lead Managers
-
8/15/2019 Group A2 Introduction Presentation
15/52
-
8/15/2019 Group A2 Introduction Presentation
16/52
• Even if many of these activities will be handled
by other intermediaries, the BRLMs shall be
responsible for ensuring that these agencies
fulfill their functions and enable them todischarge this responsibility through suitable
agreements with the Company.
-
8/15/2019 Group A2 Introduction Presentation
17/52
• Credit Rating
– As this is an Issue of Equity Shares, there is no
credit rating for this Issue.
• IPO Grading
– This Issue has been graded by CRISIL Limited and
has been assigned a grade of ‘3’ out of amaximum of ‘5’, indicating average fundamentals.
The IPO Grading is assigned on a five point scale
from 1 to 5, with IPO Grade 5/5 indicating strong
fundamentals and IPO Grade 1/5 indicating poorundamentals.
-
8/15/2019 Group A2 Introduction Presentation
18/52
• Trustees
– As this is an Issue of Equity Shares, the
appointment of Trustees is not required.
• Project Appraisal
– There is no project being appraised.
• Book Building Process
– Book Building Process refers to the process of
collection of Bids, on the basis of the Red Herring
Prospectus within the Price Band. The Issue Priceis fixed after the Bid Closing Date.
-
8/15/2019 Group A2 Introduction Presentation
19/52
• The principal parties involved in the Book BuildingProcess are:
(a) Our Company;(b) Book Running Lead Managers;
(c) Syndicate Members who are intermediaries registeredwith SEBI or registered as brokers with the
Stock Exchanges and eligible to act as underwriters. Syndicate
Members are appointed by the BRLMs;(d) Registrar to the Issue; and
(e) Escrow Collection Banks.
•
The Book Building Process is subject to change fromtime to time and the investors are advised to maketheir own judgment about investment through thisprocess prior to making a Bid in the Issue.
-
8/15/2019 Group A2 Introduction Presentation
20/52
• Bidders can bid at any price within the price band. For
instance, assume a price band of Rs. 20 to Rs. 24 per equity
share, issue size of 3,000 equity shares and receipt of five bids
from bidders, details of which are shown in the table below. Agraphical representation of the consolidated demand and
price would be made available at the bidding centers during
the bidding period. The illustrative book below shows the
demand for the equity shares of the issuer company atvarious prices and is collated from bids received from various
investors.
-
8/15/2019 Group A2 Introduction Presentation
21/52
CAPITAL STRUCTURE
-
8/15/2019 Group A2 Introduction Presentation
22/52
Changes in the Authorised Share Capital of our
Company since Incorporation
-
8/15/2019 Group A2 Introduction Presentation
23/52
• This Issue has been authorized by a resolution of
our Board of Directors dated August 27, 2009 and
a resolution of our shareholders dated
September 22, 2009.• The Equity Share capital of our Company after the
Issue, assuming full exercise of all outstanding
options which have been vested and are yet to beexercised i.e. 333,500 options, under the ESOP
2007,will comprise 90,349,550 Equity Shares.
-
8/15/2019 Group A2 Introduction Presentation
24/52
• The RBI has by a letter dated December 18, 2007permitted FIIs to subscribe to the present Issueunder the portfolio investment scheme in termsof Regulation 1(5) of Schedule 2 to RBI
notification no FEMA 20/2000- RB dated May 3,2000. However it provided that FII investments inany pre-ipo placement would be treated on parwith FDI and will have to comply with the
guidelines for such FDI such as minimumcapitalisation norms and lock in-period and otherconditions prescribed vide Press Note 2 (2005)Series.
-
8/15/2019 Group A2 Introduction Presentation
25/52
Requirement and Sources of Funds
-
8/15/2019 Group A2 Introduction Presentation
26/52
Means of finance
• The fund requirement and deployment is based on internal management
estimates and has not been appraised by any bank or financial institution. The
fund requirement below is based on our current business plan. In view of the
highly competitive and dynamic nature of the industry in which we operate, we
may have to revise our business plan from time to time.
•Company may also reallocate expenditure to newer projects or those with earliercompletion dates in case of delays in our existing projects. Consequently,
company’s fund requirement may also change accordingly. Any change in
company’s plans may require rescheduling of our expenditure programs, starting
projects which are not currently planned, discontinuing projects currently planned
and an increase or decrease in the expenditure for a particular project at the
discretion of the management of Company. The objects as mentioned above willbe financed from the Net proceeds of the Issue. The remaining balance and in case
of any variations in the actual utilization of funds earmarked for the activities set
forth below, increased fund deployment for a particular activity will be met from
internal accruals of Company. The balance proceeds of the Issue, if any, will be
used for growth opportunities and general corporate purposes.
-
8/15/2019 Group A2 Introduction Presentation
27/52
The details of shares to be locked-in
for one year are given below
-
8/15/2019 Group A2 Introduction Presentation
28/52
In terms of Regulation 40 of the SEBI
ICDR Regulations• The Equity Shares held by persons other than the Promoters prior
to the Issue may be transferred to any other person holding theEquity Shares of our Company which are locked-in as per Regulation37, subject to continuation of the lock-in in the hands of thetransferees for the remaining period and compliance with SEBI(Substantial Acquisition of Shares and Takeovers) Regulations, 1997,as applicable.
• Equity Shares held by the Promoters may be transferred to andamong the Promoter Group or to a new promoter or persons incontrol of our Company which are locked-in as per Regulation 36,subject to continuation of the lock-in in the hands of the
transferees for the remaining period and compliance with SEBI(Substantial Acquisition of Shares and Takeover) Regulations, 1997,as applicable.
-
8/15/2019 Group A2 Introduction Presentation
29/52
Top Ten Shareholders
15%
13%
13%12%11%
9%
9%
8% 7% 3%
% of Shares
HDFC Ventures Golden Temple Pharma
Dreamz Impex R.Vasudevan*
DNA Pharma Premratan ExportsMedicreams India Orion Lifesciences
Vatsalya Enterprises Lalitha Vasudevan
Shareholder % of share
HDFC Ventures 14.66 %
Golden Temple Pharma 12.35 %
Dreamz Impex 12.35 %R.Vasudevan* 11.71 %
DNA Pharma 11.32 %
Premratan Exports 8.42 %
Medicreams India 8.42 %Orion Lifesciences 7.72 %
Vatsalya Enterprises 6.60 %
Lalitha Vasudevan 3.33 %
-
8/15/2019 Group A2 Introduction Presentation
30/52
• Neither the Company, the Promoters, the Directors northe BRLMs have entered into any buy-back and/orstandby arrangements for the purchase of EquityShares from any person.
• Except as disclosed in this Red Herring prospectus,there will be no further issue of capital whether by wayof issue of bonus shares, preferential allotment, rightsissue or in any other manner during the period
commencing from submission of this Red HerringProspectus with SEBI until the Equity Shares to beissued pursuant to the Issue have been listed.
-
8/15/2019 Group A2 Introduction Presentation
31/52
• We have not issued any Equity Shares out of revaluation reserves or for consideration otherthan cash other than the Equity Shares issuedthrough a bonus issue, which was from the freereserves of our Company.
• The Equity Shares held by our Promoters are notsubject to any pledge
• Over-subscription to the extent of 10% of theIssue can be retained for the purpose of roundingoff while finalising the basis of Allotment.
-
8/15/2019 Group A2 Introduction Presentation
32/52
• Our Promoters and members of our PromoterGroup will not participate in the Issue.
• There will be only one denomination of Equity
Shares unless otherwise permitted by law andthe Company shall comply with such disclosureand accounting norms as may be specified bySEBI from time to time.
• The Equity Shares will be fully paid up at the timeof allotment failing which no allotment shall bemade.
-
8/15/2019 Group A2 Introduction Presentation
33/52
OBJECTS OF THE ISSUE
The objects of the Issue are to raise funds for:
a. Construction of our EPC contracts and real estate
development projects
b. Repayment of debtc. General corporate purposes and
d. Achieve the benefits of listing on the Stock
Exchanges
-
8/15/2019 Group A2 Introduction Presentation
34/52
Details of the Object
-
8/15/2019 Group A2 Introduction Presentation
35/52
Construction of our EPC contracts and
real estate development projects
• We are engaged in construction of our EPC contracts and
real estate development projects and intend to deploy Rs.
1,150.00 million
-
8/15/2019 Group A2 Introduction Presentation
36/52
Zenith Project
• They propose to deploy Rs. 900.00 million of
the net proceeds of the Issue towards meeting
construction costs of Zenith Project at Pune,
Maharashtra involving construction of a mall.
• The total amount we intend to deploy for the
construction of the project is Rs. 1035.00
million of which Rs. 39.90 million is alreadyincurred.
-
8/15/2019 Group A2 Introduction Presentation
37/52
Details about the land acquisition of
the Project• The Company had entered into a joint venture agreement dated
February 2, 2005 and the addendum agreement dated August 10,2006 with Sumangal Enterprises, a partnership firm, ‘ZenithVentures’ to jointly acquire the development rights fordevelopment of certain lands located at Kharadi, Pune.
•
Under the terms of the addendum agreement, SumangalEnterprises is entitled to 42.5% of the gross sale proceeds of theshops in the mall to be sold or leased, upon construction.
• The amount so arrived at will be assumed to be inclusive of thecapital contribution made by Sumangal Enterprises for the purchaseof the said land.
• The Company will be entitled to the profit arrived after deductingexpenses including statutory liabilities, payment relating to theproject and fixed share of profit of Sumangal Enterprises.
-
8/15/2019 Group A2 Introduction Presentation
38/52
Details about the land acquisition of
the Project
• Zenith Ventures has entered into a development agreement
dated November 8, 2005 with Dr. Vijay Tatyarao Dangat, the
owner of the land, Ganaraj Developers, a partnership firm,
and Suyash Realtors Private Limited as the consenting parties
to whom development rights were transferred by the owners,for the development of land admeasuring 3.63 acres located
at Kharadi, Pune.
• Under the said agreement, Dr. Vijay Tatyarao Dangat has
transferred development rights in the said property to ZenithVentures for a lump sum consideration payable to the owner
and the consenting parties.
• As per the work order dated August 8, 2009, Zenith Ventures
awarded the contract for construction of the Zenith Project toour Com an .
-
8/15/2019 Group A2 Introduction Presentation
39/52
Details of the Cost of the Project
• The breakdown of the internal estimated construction cost of the
Zenith project is as follows:
-
8/15/2019 Group A2 Introduction Presentation
40/52
Nucleus Belgaum project
• We propose to deploy Rs. 250.00 million of the net proceeds of the Issue towards meetingthe development and construction costs of
our Nucleus Belgaum project at Belgaum,Karnataka involving construction of a mall.
• The total amount we intend to deploy towardsdevelopment and construction of the project
is Rs. 330.00 million which is excluding thecost of land, which has already been acquired.
-
8/15/2019 Group A2 Introduction Presentation
41/52
Details of the Cost of the Project
-
8/15/2019 Group A2 Introduction Presentation
42/52
Repayment of the loan taken
• We have entered into a loan agreement datedNovember 28, 2008 with Housing DevelopmentFinance Corporation Limited under which they areallowed to borrow up to Rs. 500.00 million with an
interest payable, at the rate of 14.25% per annum,which is set in accordance with the prevailing HDFCCLPR rate.
• As on December 31, 2009 the principal outstanding is
Rs. 411.68 million.• We intend to repay up to Rs. 396.28 million from the
Net Proceeds of the Issue during the Fiscal year 2010.
-
8/15/2019 Group A2 Introduction Presentation
43/52
-
8/15/2019 Group A2 Introduction Presentation
44/52
Issue related expenses
• The expenses of this Issue include, among others, underwriting and
management fees, printing and distribution expenses, legal fees,
statutory advertisement expenses, IPO grading expenses and listing
fees.
-
8/15/2019 Group A2 Introduction Presentation
45/52
BASIS FOR ISSUE PRICE
• The Issue Price will be determined by us inconsultation with the BRLMs on the basis of the demand from investors for the Equity
Shares through the Book-Building Process.• The face value of the Equity Shares is Rs. 10
and the Issue Price is X times the face value atthe lower end of the Price Band and X times
the face value at the higher end of the PriceBand.
-
8/15/2019 Group A2 Introduction Presentation
46/52
BASIS FOR ISSUE PRICE
• Qualitative factors:
Significant experience and strong track record;
Quality and strength of execution;
Emphasis on innovative and theme-based
developments;
Qualified and proven project teams and
experienced management; and Effective development structure to optimize
resources.
-
8/15/2019 Group A2 Introduction Presentation
47/52
BASIS FOR ISSUE PRICE
• Quantitative factors:
The information presented below relating to theCompany is based on the restated unconsolidated
financial statements of the Company for the sixmonth period ended September 30, 2009 andFiscal 2009, 2008, 2007 and restated consolidatedfinancial statements of the Company for the six
month period ended September 30, 2009 andFiscal 2009, 2008 and 2007 prepared inaccordance with Indian GAAP.
-
8/15/2019 Group A2 Introduction Presentation
48/52
BASIS FOR ISSUE PRICE
Some of the quantitative factors are:
1. Basic and Diluted Earnings per Share (EPS) as per Accounting
Standard 20
-
8/15/2019 Group A2 Introduction Presentation
49/52
BASIS FOR ISSUE PRICE
2. Price Earning Ratio (P/E) in relation to the Issue Price of Rs. X pershare of Rs. 10 each
a. P/E ratio in relation to the Floor Price : X times
b. P/E ratio in relation to the Cap Price : X times
c. P/E based on EPS for the year ended March 31, 2009 : X timesd. P/E based on Weighted average EPS : X times
e. Industry P/E*
i. Highest :391.2
ii. Lowest : 2.8
iii. Industry Composite : 38.5
* P/E based on trailing twelve month earnings for the entireconstruction sector
-
8/15/2019 Group A2 Introduction Presentation
50/52
-
8/15/2019 Group A2 Introduction Presentation
51/52
BASIS FOR ISSUE PRICE
4. Minimum Return on Total Net Worth after Issue needed to
maintain Pre-Issue EPS for the year ended March 31, 2009 is X
5. Net Asset Value
-
8/15/2019 Group A2 Introduction Presentation
52/52
BASIS FOR ISSUE PRICE
6. Comparison with other listed companies EPS (Rs.) P/E