GTDS Company Profile 2012
1
COMPANYCOMPANYCOMPANYCOMPANY PROFILEPROFILEPROFILEPROFILE
2012012012012222 Unit 2B Bellisima Bldg., Pacita Ave. Pacita Complex
San Pedro Laguna, 4023 Philippines
Telefax: +632-869-4277
Tel: +632-668-1140
Email: [email protected]
Website: http://www.gtdsgroup.com
Engineering Design & Trading Services
“We “We “We “We Conquer Quality Conquer Quality Conquer Quality Conquer Quality TTTThrough Teamworkhrough Teamworkhrough Teamworkhrough Teamwork””””
GTDS
GTDS Company Profile 2012
2
Background � About Us � Vision � Mission
The Organization � Corporate Organization � Technical Structure � Piping Engineering Table of Organization � Technical Consultants � Affiliates
Services � Piping
∗ Proposal Work (Engineering Man-hour Estimation & BM/BQ) ∗ Conceptual Design/Plant Design ∗ Detail Design Engineering ∗ Construction Support & Field Engineering
� Civil & Structural � Control & Automation � Electrical
Capabilities � Refinery Plant � Industrial Plant � Treatment Plant � Chemical-Related Plant � Storage & Distribution Facility
Project Execution • Project Quality Assurance Plan
∗ Planning & Data Gathering ∗ Guidelines & Procedures ∗ Implementation & Execution ∗ Verification & Review ∗ Record & Report
• GTDS Quality System Process • Softwares Used
List of Clients List of Suppliers Track Record
� Completed Projects � On-going Projects
Registration and Permits � DTI Certificate of Registration � Mayor’s Permit � BIR � SSS � Phil-health Employer’s Data Record � Pag-ibig Fund
TABLE OF CONTENTS
GTDS Company Profile 2012
3
The company was formerly registered under the Securities and Exchange
Commission (SEC) with its original name, Globelink Technical Solutions
Co. Initially, it was composed of six (6) individuals with different levels of expertise
on Design Engineering, Construction, Project Management, Sales, Information &
Technology (IT) and in Administration. However, given the current financial crisis that
hit the global market, majority of the incorporators
withdrew one after the other. Notwithstanding the
impending challenges, the founder decided to
continue the business’ operation. Driven by his strong
faith with the Almighty, hard work, technical know-how
and persistence in mentoring young engineers to
develop their skills, he pursued his mission by sharing his expertise and generating
jobs (in his small way) for the country. Thus, GlobeTechnolink Design
Services was formed. It was registered under the Department of Trade and
Industry in March 2009 with Certificate No. 00693033. Its name conforms to the goal
of the company to provide quality and better solutions to design needs of the global
market at a reasonable cost through a pool of learned and efficient technical
personnel.
Backed by the founder himself and supported by individuals having
in-depth knowledge and experiences in various industries here
and abroad, like Refineries, Food Processing and
Manufacturing Facilities, Treatment Plants, Chemical-Related
Plants, Storage & Distribution Facilities; and other related
services, these individuals will guide the young engineers as
they enter into the vast world of engineering.
ABOUT US
GTDS Company Profile 2012
4
To be globally competitive in engineering services.
To be known and accepted by clients for its competence and commitment in
delivering quality services on time and at a reasonable cost.
To achieve these objectives, the company shall implement following:
• Develop local young engineers through rigid technical training and mentoring
by experienced engineers,
• Implement project quality assurance system to all technical services,
• Establish an engineering network with local subcontractors/consultants in
order to build a strong workforce.
VISION
MISSION
Electrical Design PDMS (Plant Design) In-Tools (Instrumentation) Piping Design
GTDS Company Profile 2012
5
CORPORATE ORGANIZATION
TECHNICAL STRUCTURE
MERLYN
BONGCALES
President
TEODY
BONGCALES
Managing Director
OSCAR ERASQUIN
Project MngtTeam
BRIX DIMAAPI
Engineering
EDUARDO
VILLAMOR
Civil/Structural
EDGAR JABAS
Plant/Piping
TEODORICO
DIMACULANGAN
Electrical
MERNA
ECHIVERRI
Trading
ATTY. RAUL
ALBURA, MD.
Legal/Medical
MARITES ALATIIT
Finance
Engineering
Plant/Piping Civil/StructureInstrument &
ElectricalEquipment &
Rotary
Greenfield Undertaking
Environment & Chemical
Geotechnical Construction
THE ORGANIZATION
GTDS Company Profile 2012
6
TECHNICAL CONSULTANTS
Civil & Structural - EDUARDO VILLAMOR (EFVA) Control & Automation (Instrumentation) - GODOFREDO VINLUAN (DTRI) Environmental & Chemical Engineering - RIZALINO NOCON (EMTUP) Fabrication & Construction - OSCAR TOCMO (RICI) Geotechnical Engineering - WALTER MERCADO (AMG) Plant & Piping Engineering - EDGAR C. JABAS (NEXUS)
AFFILIATES
• AMGeoconsult (AMG)
• DEC Techno Resources, Inc. (DTRI)
• EFVillamor & Associates (EFVA)
• Environmental Mngt. & Technologies Unlimited of the Phils. (EMTUP)
• Kryffer Engineering Services (KES)
• Laguna Well Drilling & Construction (LWDC)
• Nexus Engineering & Consultancy Services (NEXUS)
• ROOS Industrial Construction Inc. (RICI)
Modellers
Engineers/Designers
Checkers
Technical Auditor
THE ORGANIZATION
GTDS Company Profile 2012
7
PIPING DESIGN
Piping Proposal Work (Engineering Man-hour Estimation & BM/BQ) � Prepare preliminary plot planning � Prepare piping conceptual routing plan � Prepare preliminary piping information for civil and equipment � Preparation of MTO � Prepare bill of material (BM) � Prepare bill of quantity (BQ) � Prepare piping man-hour estimation
Conceptual Design/Plant Design Detail Design Engineering
� Plant/Piping Design ∗ Basic Design
� Plot planning � Preliminary layout/Conceptual piping routing � Specification and Procedures
∗ Detail Design � Piping layout � Piping information to all disciplines � Critical lines selection for stress analysis & calculation
∗ Drawing Production � General piping arrangement � Isometric drawings � Pipe support selection & design � PDS modeling (manpower supply) � PDMS modeling (manpower supply) � Model-Review-Smart Plan Review (manpower supply) � Steam tracing preparation
∗ Material � Piping material take-off � Bill of material (BM) extraction/summary � Bill of quantity (BQ) extraction
∗ Technical Evaluation and Vendor Review � Bulk and specialty items evaluation
Construction Support & Field engineering � Construction
∗ Supervision & Field services � Site survey & verification � Supervision & field engineering � Line checking � Punch listing & follow-up � Testing & pre-commissioning � Field change preparation
∗ Field drawing preparation & site office work
� Shop spool fabrication drawing � Test packages (test flow) � Testing procedure � Post construction work � Drawing as-built work
SERVICES
GTDS Company Profile 2012
8
CIVIL AND STRUCTURAL
� Foundation Plan � Loading Data � Advance Bill of Quantity � Structural Analysis � Anchor Bolt Plan � Basic Design Plans & Elevations � Connection Standards � General Arrangement Drawings � Erection/Installation Drawings � Detail Fabrication Drawings
CONTROL AND AUTOMATION
Engineering Design � Control System � System Configuration � Logic Diagram � I/O List � Alarm Setpoint List � Control Room & Equipment Layout � Instrument Index � Specification of Field Instruments � Calculations � Information to other Disciplines � Material Specifications � Specification for construction work � Instrument & Control General Specifications � PC + PLC System Specification � Construction drawing for instrumentation
ELECTRICAL – UPON REQUEST
GTDS Company Profile 2012
9
Designs:esigns:esigns:esigns:
Refinery Plantefinery Plantefinery Plantefinery Plant � Petroleum Refinery � Gas Processing Plant
Industrial Plantndustrial Plantndustrial Plantndustrial Plant � Food Processing Plant � Manufacturing Facility
Treatment Plantreatment Plantreatment Plantreatment Plant
� Water Treatment Plant (Desalination, Demineralization)
� Waste Water Treatment Plant � Solid Waste Handling Facility
Chemicalhemicalhemicalhemical----Related PlantRelated PlantRelated PlantRelated Plant � Petrochemical Plant � Inorganic Chemical Plant
Storage & Distribution Facility torage & Distribution Facility torage & Distribution Facility torage & Distribution Facility
� Storage/Terminal/Depot � Loading/Unloading Facility
CAPABILITIES
GTDS Company Profile 2012
10
PROJECT QUALITY ASSURANCE PLAN
1. Planning & Data Gathering � Project study � Collection of resources (5 “M’s”)
- Manpower (mobilization & demobilization) - Methodology (practice & process) - Machine (hardware & software) - Material (data & literature) - Money (cash flow)
2. Guidelines & Procedures � Orientation/training � Technical instructions � Design information � Correspondences/Communications
3. Implementation & Execution
� Table of organization (Hierarchy) � Roles & responsibilities of key personnel � Scope & split of work � Checklist
4. Verification & Review
� Quality assurance/Quality Control - Detail checking - Technical review - Technical auditing - Quality audit (internal)
� Design review with client (per milestone) 5. Record & Report
� Record client comments & design non-conformance � Corrective & preventive action � Report result of technical & quality audit � Lesson learned update & record � Project completion report
1• Planning & Data Gathering
2• Guidelines & Procedures
3• Implementation & Execution
4• Verification & Review
5• Record & Report
PROJECT EXECUTION
GTDS Company Profile 2012
11
QUALITY SYSTEM PROCESS
QUALITY VERIFICATION
QUALITY STATUS STAMP
Quality Status
Activity Prep’d Chk’d TA
Action by/
Signature
Date
Key Person
XXXXXX
Area Key Person
Designer
(Self-check)
XXXXXX
Area Key Person
Designer
(Self-check)
XXXXXX
Area Key Person
Designer
(Self-check)
Teody L. Bongcales
Technical Auditor
XXXXXX
Checker -1
XXXXXX
Checker -2
XXXXXX
Checker -3
Self -check
By Designer
Detail Verification
By Checker
Technical Auditing
By Technical Auditor
PROJECT EXECUTION
Marked Up
GTDS Company Profile 2012
12
SOFTWARES USED
PIPING Auto-CAD Micro-station PDS (by client) PDMS (by client) Caesar II Auto Plant Solid Works CIVIL/STRUCTURAL SAP 2000
Staad Pro-steel Tekla Structures
INSTRUMENTATION In-Tools (as per request)
ELECTRICAL Electrical Design System Analysis (EDSA)
- (as per request)
PROJECT EXECUTION
GTDS Company Profile 2012
13
NAME OF COMPANYNAME OF COMPANYNAME OF COMPANYNAME OF COMPANY //// ADDRESSADDRESSADDRESSADDRESS CONTACT PERSONCONTACT PERSONCONTACT PERSONCONTACT PERSON
& DETAILS& DETAILS& DETAILS& DETAILS
AMGeoconsultAMGeoconsultAMGeoconsultAMGeoconsult
#12 South Zuzuarregui St.
Old Balara, Quezon City 1119
Philippines
Available upon request, for
reference
Boustead Salcon Water Solutions PTE Ltd. Boustead Salcon Water Solutions PTE Ltd. Boustead Salcon Water Solutions PTE Ltd. Boustead Salcon Water Solutions PTE Ltd.
67 Ubi Avenue 1
#02-02 Starhub Green
Singapore
Available upon request, for
reference
Brenton Tech Specialist Inc.Brenton Tech Specialist Inc.Brenton Tech Specialist Inc.Brenton Tech Specialist Inc.
1392 G. Araneta Ave., Talayan
Quezon City, Philippines
Available upon request, for
reference
Duhan Technology Inc.Duhan Technology Inc.Duhan Technology Inc.Duhan Technology Inc.
#408 Hanshin IT Tower
235 Guro3-Dong, Guro-gu, Seoul, 152-768
Korea
Available upon request, for
reference
EJ Joint Venture Phils. IncEJ Joint Venture Phils. IncEJ Joint Venture Phils. IncEJ Joint Venture Phils. Inc
7th Floor Corinthian Plaza
121 Paseo de Roxas, Makati City
Philippines
Available upon request, for
reference
EJ Joint Venture Sdn. Bhd.EJ Joint Venture Sdn. Bhd.EJ Joint Venture Sdn. Bhd.EJ Joint Venture Sdn. Bhd.
B9-3 & B-9-4, Megan Ave.1
No. 189 Jalan Tun Razak, 50400
Kuala Lumpur, Malaysia
Available upon request, for
reference
Gas Cleaning TechnologiesGas Cleaning TechnologiesGas Cleaning TechnologiesGas Cleaning Technologies
4953 N. O’Connor Blvd.
Irwing, TX 75062, USA
Available upon request, for
reference
Hongin Tech. Co. Ltd.Hongin Tech. Co. Ltd.Hongin Tech. Co. Ltd.Hongin Tech. Co. Ltd.
Room #313, Byucksan Digital Valley II Bldg. 481-10,
Gasan-dong, Gumcheon-gu
Seoul, Korea
Available upon request, for
reference
MHIMHIMHIMHI Corp.Corp.Corp.Corp.
25th Flr, Robinsons Cybergate Ctr., Tower 3
Pioneer St., Mandaluyong City, Metro Manila
Philippines
Available upon request, for
reference
Municipality of CatigbianMunicipality of CatigbianMunicipality of CatigbianMunicipality of Catigbian
Catigbian, Bohol
Philippines
Available upon request, for
reference
Petron CorporationPetron CorporationPetron CorporationPetron Corporation
E. Rodriguez Avenue
Ugong, Pasig City
Philippines
Available upon request, for
reference
Woolim Engineering Co. Ltd.Woolim Engineering Co. Ltd.Woolim Engineering Co. Ltd.Woolim Engineering Co. Ltd.
#1306 C-Dong Woolim Lion’s Valley
171-28, Gasan-Dong, Geumchun-gu, Seoul, Korea
Available upon request, for
reference
LIST OF CLIENTS
GTDS Company Profile 2012
14
NAME OF COMPANY / ADDRESSNAME OF COMPANY / ADDRESSNAME OF COMPANY / ADDRESSNAME OF COMPANY / ADDRESS CONTACT PERSONCONTACT PERSONCONTACT PERSONCONTACT PERSON
& DETAILS& DETAILS& DETAILS& DETAILS
Apex Plastic Piping Supply & ServicesApex Plastic Piping Supply & ServicesApex Plastic Piping Supply & ServicesApex Plastic Piping Supply & Services
2F MR Tan Bldg.
Amethyst Road, Balibago, Sta. Rosa City
Laguna, 4026, Philippines
Available upon request, for reference
Georg Fischer Piping Georg Fischer Piping Georg Fischer Piping Georg Fischer Piping SystemsSystemsSystemsSystems
#3 E. Rodriguez Jr. Ave (C-5)
Bagong Ilog, Pasig City 1604
Philippines
Available upon request, for reference
Completed Projects
PROJECTPROJECTPROJECTPROJECT
NAME/ LOCATIONNAME/ LOCATIONNAME/ LOCATIONNAME/ LOCATION SCOPESCOPESCOPESCOPE DURATIONDURATIONDURATIONDURATION/PLACE OF /PLACE OF /PLACE OF /PLACE OF
ASSIGNMENTASSIGNMENTASSIGNMENTASSIGNMENT
GS Caltex/Yeosu, South Korea � 3D modeling
� QC work and technical auditing
� Smartplant review
� Revamping work tie-in drawing
preparation and site survey
August-October
2011/Woolim Engg office
and project site, Korea
4th NGL Project/Abu Dhabi, UAE � 3D modeling May-July 2011/Hongin Engg. Office, Korea
EVA Utilities/Saudi Arabia � 3D modeling May-July 2011/Hongin Engg. Office, Korea
Ruwais Refinery Expansion
Project2/Abu Dhabi, UAE
� 3D modeling
� Checking
� Smart plant review
� Fire fighting design
May-July 2011/Hongin Engg. Office, Korea
Honam Petrochemical
Corporation EM2 Project/South
Korea
� Basic Design
� Routing study
� Plot planning (development)
� P&ID Review
� MTO
� Detail Design
� Piping arrangement
� Sectional Detail
� Piping information
� Stress calculation sketches
� Special support study
� Piping Supporting Plan
Dec 2010 – May 2011/ Duhan Technology office, Korea & GTDS office, Manila
TRACK RECORD
LIST OF MATERIAL SUPPLIERS
GTDS Company Profile 2012
15
PROJECTPROJECTPROJECTPROJECT
NAME/ LOCATIONNAME/ LOCATIONNAME/ LOCATIONNAME/ LOCATION SCOPESCOPESCOPESCOPE DURATION/PLACE OF DURATION/PLACE OF DURATION/PLACE OF DURATION/PLACE OF
ASSIGNMENTASSIGNMENTASSIGNMENTASSIGNMENT
Tanjung Jati “B” Coal-Fired
Expansion Project Units 3 & 4
(Water & Wastewater Treatment
Facilities/ Central Jaya Indonesia
� Field engineering
� Site supervision
April 2010 – April 2011/ Tanjung Jati, Indonesia
Petron LPG Line Projects:
1. Cebu Ayala Mall
Cebu City, Philippines
2. Greenhills Shopping Center,
San Juan
Metro Manila, Philippines
3. Solenad Project, Sta. Rosa,
Laguna, Philippines
4. Ayala Mall, Cagayan de Oro
City, Philippines
5. ATC (The Garden), Alabang,
Muntinlupa City, Philippines
6. Ayala Subic, Zambales,
Philippines
7. Officetel Building,
Clark Field, Pampanga
Philippines
8. Midori Condominium
Global City, Taguig City
Metro Manila, Philippines
9. Aseana Complex, Pasay City,
Philippines
10. Entrata Hotel &
Condominium, Muntinlupa
City, Philippines
11. Abrezza Mall, Davao City,
Philippines
12. Glorietta Mall, Makati City,
Philippines
� Conceptual piping layout (LPG line
main header)
� Bullet tank location
� Building piping arrangement (N/A to
Glorietta Mall & Aseana Complex)
� Excavation work estimation
July 2010 - March 2011
Naphtha Cracker
Plant/Batangas, Philippines
� Plot plan development
� Conceptual piping routing
� Piping layout for cylindrical, conical
& spherical tanks, jetty piping & tie-
in @ existing area
� Piping information preparation (P/R
w/ loading calc, tank orientation)
� Support calculation
� MTO
� Drawing production, plan &
isometric preparation
June - December 2010
GTDS Company Profile 2012
16
PROJECTPROJECTPROJECTPROJECT
NAME/ LOCATIONNAME/ LOCATIONNAME/ LOCATIONNAME/ LOCATION SCOPESCOPESCOPESCOPE DURATION/PLACE OF DURATION/PLACE OF DURATION/PLACE OF DURATION/PLACE OF
ASSIGNMENTASSIGNMENTASSIGNMENTASSIGNMENT
Shah Gas Project/Abu Dhabi � Technical consultancy and design
review
July-Aug 2010/ Duhan Tech office, Korea
Butane Isomerization
Project/Abu Dhabi
� Basic Design
- Plot planning (development)
- Piping routing plan
� Detail Design
- Piping layout
- Piping information
Nozzle orientation
-Civil info with loading
� Piping Supporting Plan
Jan 2010- Apr 2010/ Duhan Tech office and GTDS office, Manila
Tanjung Jati “B” Coal-Fired
Expansion Project Units 3 & 4
(Water & Wastewater Treatment
Facilities/ Central Jaya Indonesia
� Plot plan
� Conceptual piping routing
� Piping layout preparation
� Piping information (Equipment &
Structure)
� Loading Calculation
� Drawing Production (Plan &
Isometric Drawings)
� Material Take Off/Summary
� Piping Support
Mar 2008- Feb 2010/ Boustead Salcon office, Singapore and GTDS office, Manila
Skikda Refinery Project (Oil
Refinery Plant), Algeria
� Basic Plant design
� Piping conceptual routing & layout
� Plot plan preparation
� Basic Piping information (Equipment
& Structure)
� Material take-off/Summary
Oct 2009- Nov 2009/ Duhan Tech office, Korea
S-Oil Refinery Expansion Project
(SEP) Aromatic Complex,
(Petrochemical Plant), Korea
� Plant design
� Piping conceptual routing
� Piping information for
civil/equipment
� Material take-off/bill of material
Sep 2008- Nov 2008/Duhan Tech office, Korea and GTDS office, Manila
Muara Karang Gas Power Plant
(Demineralization Plant/
Indonesia
� Plot plan � Piping arrangement drawings � Isometric piping drawing with MTO � Piping support layout/ Arrangement � Line index list
Apr 2008- Aug 2008/ MHI Kobe office, Japan and GTDS office, Manila
GTDS Company Profile 2012
17
On-Going Projects
PROJECTPROJECTPROJECTPROJECT
NAME/ LOCATIONNAME/ LOCATIONNAME/ LOCATIONNAME/ LOCATION SCOPESCOPESCOPESCOPE STARTED/PLACE OF STARTED/PLACE OF STARTED/PLACE OF STARTED/PLACE OF
ASSIGNMENTASSIGNMENTASSIGNMENTASSIGNMENT
Samur Project/Malaysia � SP3D modeling February 2012/MHI Office, Mandaluyong City, Phils.
Converter Aisle Emission
Reduction PJ/Hayden, Arizona,
USA
� Structural design works
� Piping design works
February 2012
EVA Utilities/Saudi Arabia � 3D modeling February 2012/Hongin Engg. Office, Korea
Mixed Feed Cracker (MFC) Ras
Tanura Integrated Project/Jubail,
KSA
� 3D modeling
� QC work and technical
auditing
December 2011/Woolim Engg
office, Korea
Centralized LPG System/ Aseana,
Pasay City
� Detail design of bullet tank
farm and main LPG main
header (ring) and
distribution line
� Preparation of Design and
Maintenance Specification
October 2011
GTDS Company Profile 2012
18
DTI Registration Mayor’s Permit
BIR Registration SSS Registration
REGISTRATION/PERMITS
GTDS Company Profile 2012
19
Philhealth Registration
Pag-ibig Fund Certification