Download - HVAC VRF Installation Method Statement
-
7/25/2019 HVAC VRF Installation Method Statement
1/8
COMMINT NIGERIA LIMITED
HVAC INSTALLATION METHOD STATEMENT
1. Introduction
The fxing o all air conditioning equipment, installation o all rerigerant pipework, duct work, insulation work, drain pipe work and ull commissioning shall
be perormed by Commint Nigeria Limited, a specialist V! installer who is
authori"ed to install #$%&%N equipment'
%n the course o installation Commint Nigeria Limited will apply the best
practice methodology in carrying out its duties and will strictly adhere to the
ollowing(
)') etain the responsibility to ad*ice o any aspects which, based upon
experience, would appear to be inappropriate and+or likely to lead to
operational problems'
)' -ealth . /aety at 0ork $ct )123, and all other rele*ant attendant
legislation, particularly the management o -ealth . /aety at 0ork
egulations )11, 4ersonal 4rotecti*e 5quipment at 0ork egulation )11
and the Construction, #esign and 6anagement 7C#68 egulation )113'
)'9 5nsure that all personnel are in possession o the appropriate personal
protecti*e equipment to comply with the 4ersonal 4rotecti*e 5quipment
egulations )11'
)'3 5nsure that all personnel are ully competent in the work they are taskedto perorm and any claim to stated qualifcations are *alid'
)':5nsure that all personnel are instructed to comply with the pre*ailing site
rules'
)'; 6ust use calibrated and regularly checked tools' 5lectrical tools will be
calibrated and checked annual
)'2
-
7/25/2019 HVAC VRF Installation Method Statement
2/8
utili"ed to minimi"e >oints on site' !urthermore all o the ollowing points should be
adhered to'
') $ll copper pipes up to ) )+?@ 7? mm8 outside diameter 7A+#8 shall be abricated
rom rerigerant quality tube to B/ 5N )331()111' Tube shall be ully annealed up
to 2+?@ 7 mm8 outside diameter 7A+#8 only' Tube shall be deli*ered to siteinternally degreased and shall be stored in clean dry conditions with ends sealed
until required or installation'
' $ll due consideration and allowances shall be taken to keep pipe work clean and
dry during the installation works, ensuring that all pipe work unfnished ends are
capped o at all times'
'9 The number o >oints bends and sets are to be kept to a minimum' Butt >oints
will not be acceptedD properly swaged >oints must be ormed' Bends and sets are to
be machine pulled to an appro*ed radius where possible'
'3 !lared >oints must only be used when connecting to the manuacturer
equipment'
': 4ipe work to be properly fxed and supported using a recogni"ed industry
appro*ed support system'
'; Bra"ing shall be carried out in accordance with British erigeration $ssociation
/pecifcation or Bra"ing and B/ )393(==3' Bra"ing rods shall be cadmium ree
and conorm to B/ 5N )=33()111' $t all times, when bra"ing, a small amount o dry
nitrogen must be purged through the pipe to pre*ent oxidation and scaling
internally' $ny component susceptible to heat during the bra"ing process that may
be damaged must be protected' /ot solder shall ne*er be used or >ointing o
rerigeration pipe work'
';') $ll completed 3)=$ systems will be strength and leak tested with dry
nitrogen as per itemi"ed below and B/ 5N 92?' % the system is ound to be leak
ree, the fnal pressure readings or both strength and leak testing are to be
witnessed by either the main contractor, the consultant or endEuser and recorded
in the test result Log Book'
) bar, /trength test or a period o time that is acceptable to show any signs o
deormation to the pipe work'
) bar or fnal leak test or minimum 3 hours' 4ressure testing signage will be
clearly *isible on site during testing periods'
';' $ll completed 3)=$ systems will be leak tested with dry nitrogen as
below and B/ 5N 92?' % the system is ound to be leak ree, the fnal pressure
readings or leak testing are to be witnessed and entered into the log Book
-
7/25/2019 HVAC VRF Installation Method Statement
3/8
)8 9'= bar 7N8 6inimum o 9 minutes'
8 ):'= bar 7N8 6inimum o 9 minutes'
98 )'= bar 7N8 6inimum 3 hours'
'2 An completion o strength+leak testing an e*acuation is to be carried out tomm -g 7 Torr8'This will eliminate the risk o any moisture being present within the
pipe work installation' %t is recommended that a triple e*acuation process be carried
out as below and this should then be ollowed by a pressure rise test'
; /teps 5*acuation
)8 5*acuate the system to )= Torr rom both ser*ice *al*es' /ystem maniold
gauges Fmust not@ be used to measure a *acuum' $ Torr gauge must be used at all
times'
8 Break the *acuum with A!N 7N8 into Fsuction@ ser*ice *al*e to ) bar'
98 5*acuate to : torr rom Fdischarge *al*e@'
38 epeat step '
:8 5*acuate to lowest pressure *acuum pump will achie*e 7 torr or ) hour
minimum8'
;8 4ressure rise test to be carried out or a minimum o 9= minutes'
$. Drain i!e "or#
$ condensate line shall be installed to each an coil unit' This shall be installed and
insulated as per the standard specifcation' 6inimum si"e o condensate pipes to be
):mm plastic and insulated' Condensate shall be pumped rom each an coil, drains
to run )(?= minimum alls'
9') 4ipe work will be adequately supported in such a manner as to permit ree
mo*ement due to expansion and contraction'
9' 4ipe work should be graded to all throughout, run to waste, and should be
accessible or cleaning'
9'9 An completion, a leak and unction test must be carried out'
9'3 Gra*ity drains will be installed whene*er possible'
%. E&ectrica& 'or#
-
7/25/2019 HVAC VRF Installation Method Statement
4/8
The contractor shall include or the design and installation 7unless otherwise
specifed8, including connecting all items o mechanical equipment' The Contractor
shall pro*ide and install all wiring, cables, conduit, trunking, cable trays, termination
points, local means o isolation, control wiring etc', to mechanical plant items to
ensure that all items o equipment and controls ully unction in accordance with
manuacturersH recommendations and the current %55 0iring egulations, C%B/5Codes o 4ractice, British /tandards and
-
7/25/2019 HVAC VRF Installation Method Statement
5/8
smoke or toxic umes' %nsulating materials should be o Class FA@ rating as defned
by the Building egulations'
:') Thermal insulation will be ftted to all the pipe work installations detailed herein'
$ll materials used will be JnonEcombustibleH Class FA@' $ll insulation materials,
adhesi*es and fnishes, will be suitable in all respects or continuous use withoutdegradation throughout the range o operating temperatures and within the
en*ironment indicated'
:' The materials and method o installation will comply with all rele*ant British
/tandards Codes o 4ractice'
:'9 The material will consist o Kexible C!C ree, elastomeric black oam with a
closed cell structure'The outer surace o the oam will be an inherent *apor barrier'
:'3 %n all cases where pipes pass through fre compartment walls, fre resistant and
nonEKammable insulation+oam will be packed between the pipe slee*e and the
pipe' $ll insulation will be supplied at the thickness specifed in rele*ant -V$C
standards'
*. Duct"or#+ Gri&&e) and Di,u)er)
-
7/25/2019 HVAC VRF Installation Method Statement
6/8
;'2 $ll ductwork systems will be ftted with sucient *olume control dampers to
enable system balancing' To pre*ent noise regeneration fnal trimming to )=M only
o airKows to be carried out using the opposed blade dampers ftted to terminal
de*ices'
;'? !ire dampers are to be ftted to ductwork passing through designated frebarriers, these dampers to be ftted with -5V$C installation rames where passing
through structural walls'
;'1 !lexible ducting shall be used to orm the fnal connection to the air terminal
de*ice' The maximum length not to exceed )': meters and incorporate a change in
direction o not greater than 1=I'
;')= !lexible ducting will be manuactured rom aluminum+polyester+aluminum
laminate enclosing a high tensile steel wire helix' 0here required Kexible ducting
will be o the insulated type with an outer >acket o reinorced aluminum laminate
gi*ing a Class FA@ rating'
;')) oints between Kexible and rigid ductwork to be secured by worm dri*e clip
with the rigid ductwork spigot incorporating a JswagedH end'
;') %nsulation will be applied to the ollowing ductwork systems( E !resh air intake
ductwork, *entilation return air ducts passing through unheated spaces E $ll
conditioned air ductwork 7unless an architectural eature and adequate control is
pro*ided to pre*ent condensation orming on the ductwork8'
;')9 %nsulation shall be either ockwool duct wrap minimum :mm thick, or
phenolic oam, with reinorced aluminum oil *apor barrier gi*ing a Class FA@ rated
fnish and a thermal conducti*ity o ='=)?0+6+O&' The insulation is to be applied in
accordance with the manuacturerHs recommendations' $ll >oints to be securely
taped with 2:mm wide sel adhesi*e aluminium tape and urther secured with wire
loops at )'=m inter*als'
;')3 $ll ductwork will be ftted with identifcation bands and directional arrows in
accordance with B/ )2)=()1?3'
;'): $ir terminal de*ices will be selected to pro*ide the required air Kows+throws or
the system design, are to pro*ide a draught ree en*ironment in all operating
conditions and take into account the acoustic requirements o the installation'
Generally terminal neck *elocities will not exceed 9':m+s to pre*ent noiseregeneration'
;'); $ll outdoor duct work will be insulated with a :=mm thick ockwool duct wrap
minimum or phenolic oam , with reinorced aluminum oil *apor barrier gi*ing a
Class FA@ rated fnish and a thermal conducti*ity o ='=)?0+6+O&, with additional
aluminum cladding as anti weather'
-
7/25/2019 HVAC VRF Installation Method Statement
7/8
-. reco//i))ioning
The ollowing items must be checked prior to any systems being switched on'
2') $ marked up scale site drawing showing all V! units and rerigeration pipework, address settings 7or units and remote controllers and BC branch connections8
and model+serial numbers must be produced'
2' City 6ulti %ndoor
-
7/25/2019 HVAC VRF Installation Method Statement
8/8
?') Connect 6onitor Tool and check system connect inormation is correct i'e'
Autdoor