Max. Lifting Capacity: 550 ton x 8.3 mMax. Crane Boom Length: 126 mMax. Luffing Jib Combination: 84 m + 84 m
HYDRAULIC CRAWLER CRANE
1
CONFIGURATION
STD Heavy Duty Crane BoomMax. Lifting Capacity: 450 metric tons x 6.7 mMax. Boom Length: 42 m
STDLuffing BoomMax. Lifting Capacity: 300 metric tons x 9.0 mMax. Boom Length: 84 m
STDLong BoomMax. Lifting Capacity: 98 metric tons x 15.0 mMax. Boom Length: 108 m
HL Heavy Duty Crane BoomMax. Lifting Capacity: 367.5 metric tons x 8.3 mMax. Boom Length: 42 m
HL Luffing BoomMax. Lifting Capacity: 300 metric tons x 8.5 mMax. Boom Length: 84 m
2
The following abbreviations are used throughout this catalog:STD: Standard HL: Heavy Lift SHL: Super Heavy Lift
SHLLuffing JibMax. Lifting Capacity: 200 metric tons x 14.4 mMax. Combination: 84 m + 84 m
SHL Heavy Duty Crane BoomMax. Lifting Capacity: 550 metric tons x 8.3 mMax. Combination: 42 m
3
CONFIGURATION
STD Heavy Fixed Jib (Type A)Max. Lifting Capacity: 105 metric tons x 20.0 mMax. Combination: 78 m + 18 m
HL Heavy Fixed Jib (Type B1)Max. Lifting Capacity: 120 metric tons x 20.0 mMax. Combination: 78 m + 18 m
4
CONTENTS
Configuration ························· 1
Specifications ·························· 5
General Dimensions ·················· 7
STANDARD Boom and Jib Arrangements ························· 9
Working Ranges ··················· 12
Crane Boom Supplemental Data ··············· 19
Heavy Fixed Jib Supplemental Data ·············· 21
Luffing Jib Supplemental Data ·············· 23
Heavy Duty Crane BoomLifting Capacities ···················· 25
Long BoomLifting Capacities ···················· 25
Heavy Fixed JibLifting Capacities ···················· 25
Luffing Boom Lifting Capacities ···················· 26
Luffing JibLifting Capacities ···················· 27
HEAVY LIFT Boom and Jib Arrangements ······················· 31
Working Ranges ··················· 34
Heavy Duty Crane BoomLifting Capacities ···················· 41
Long BoomLifting Capacities ···················· 41
Heavy Fixed JibLifting Capacities ···················· 41
Luffing Boom Lifting Capacities ···················· 42
Luffing JibLifting Capacities ···················· 43
SUPER HEAVY LIFT Boom and Jib Arrangements ······················· 47
Working Ranges ··················· 50
Heavy Duty Crane BoomLifting Capacities ···················· 59
Long BoomLifting Capacities ···················· 59
Heavy Fixed JibLifting Capacities ···················· 60
Luffing Boom Lifting Capacities ···················· 61
Luffing JibLifting Capacities ···················· 62
Transportation Plan ················· 67
Parts and Attachments ············ 69
SHL Heavy Fixed Jib (Type B2)Max. Lifting Capacity: 120 metric tons x 20.0 mMax. Combination: 78 m + 18 m
SHL Heavy Fixed Jib (Type C)Max. Lifting Capacity: 105 metric tons x 30.0 mMax. Combination: 102m + 18 m
5
SPECIFICATIONS
Model:Hino diesel engine E13C-UVType:Water-cooled, direct fuel injection, with turbochargerComplies with US EPA Tier III.Displacement: 12.913 liters Rated Power: 320 kW/2,000 min-1
Max. torque: 1,650 N•m/1,300 min-1
Cooling system: Liquid, recirculating bypassStarter: 24 V/6 kWRadiator: Corrugated type core, thermostatically controlledAir cleaner: Dry type with replaceable paper elementThrottle: Twist grip type hand throttle, electrically actuatedFuel filter: Replaceable paper elementBatteries: Two 12V x 136Ah/5HR capacity batteries, parallelconnected.Fuel tank capacity: 600 liters
Six variable displacement piston pumps are driven by heavy-duty pump drive. Two variable displacement pumps are used inH1 (main hook hoist) and right hand side propel circuit. Twovariable displacement pumps are used in H2 (auxiliary hookhoist) and left hand side propel circuit. One of the other twopumps is used in W1 (boom), W2 (jib) or W3 (SHL mast) hoistcircuit, and the other is used in the swing circuit.Control: Full-flow hydraulic control system for infinitely variablepressure to all winches, propel and swing.Controls respond instantly to the touch, delivering smooth func-tion operation. Cooling: Oil-to-air heat exchanger (plate-fin type)Filtration: Full-flow and bypass type with replaceable elementElectrical system: All wiring corded for easy servicing, individ-ual fused branch circuits.
Max. relief valve pressure: 31.9 MPa {325 kgf/cm2}Reservoir capacity: 710 liters
Powered by a hydraulic motor through a planetary reducer.Brake: A spring-set, hydraulically released multiple-disc brakeis mounted on the boom hoist motor and operated through acounter-balance valve.Drum lock: External ratchet for locking drum.Drum: Double drum, grooved for 28 mm dia. wire rope.Line speed: Double line on first drum layer
Hoisting/Lowering: 20~2 m/min x 2Boom hoist reeving: 30 parts of 28 mm dia.high strengthwire rope
Boom backstops: Required for all boom lengths
H1 and H2 drums for load hoist powered by a hydraulic vari-able plunger motors, driven through planetary reducers.Brake: A spring-set, hydraulically released multiple-disc brakeis mounted on the hoist motor and operated through a counter-balance valve.Drum lock: External ratchet for locking drum.Drums:
H1 and H2: 640 mm P.C.D. x 1,367.1 mm Lg. wide drum, grooved for 28 mm wire rope. Rope capacity is 830 mworking length and 1,080 m storage length.Note: Rope lengths listed above denote drum capacity and may differ from actual rope lengths supplied when machinery is shipped.
Line speed: 110 ~ 3 m/minSingle line on the first layer
Rated line pull: 137 kN {14.0 tf}
Swing unit is powered by hydraulic motor driving spur gearsthrough planetary reducers (4 sets), the swing system provides360° rotation.Swing parking brakes: A spring-set, hydraulically releasedmultiple-disc brake is mounted on swing motor.Swing circle: Triple-row roller bearing with an integral internal-ly cut swing gear.Swing speed: 0.9 min-1 {rpm}
Torsion-free precision machined upper frame. All componentsare located clearly and service friendly. Engine with low noiselevel.
Totally enclosed, full vision cab with safety glass, fullyadjustable, high backed seat with a head-rest and armrests,and intermittent wiper and window washer (roof and front win-dow).Cab fittings:Air conditioner, convenient compartment (for tool), cup holder,ashtray, cigarette lighter, sun visor, roof blind, tinted glass, floormat, foot-rest, shoe trayControls:Five adjustable levers for all winches and swing controls
Power Plant Load Hoist System
Hydraulic System
Boom Hoisting System
Swing System
Upper Structure
Cab & Control
6
Steel-welded carbody with axles. Crawler assemblies aredesigned with quick disconnect feature for individual removalas a unit from axles. Crawler belt tension is maintained byhydraulic jack force on the track-adjusting bearing block.Crawler drive: Two independent hydraulic propel drive is builtinto each crawler side frame. Each drive consists of a hydraulicmotor propelling a driving tumbler through a planetary gearbox. Hydraulic motor and gear box are built into the crawlerside frame within the shoe width.Crawler brakes: Spring-set, hydraulically released parkingbrakes are built into each propel drive.Steering mechanism: A hydraulic propel system provides bothskid steering (driving one track only) and counter-rotating steer-ing (driving each track in opposite directions).Track rollers: Sealed track rollers.Shoes (flat): 1,500 mm wide each crawlerMax. travel speed: 1.0/0.4 km/hMax. gradeability: 20%
Including base machine, counterweights = 180 t, carbodyweights = 50 t, 24 m boom with heavy boom tip and 450 t hookblock. Not include quick connection devise and uppertranslifter.
Weight: 424 metric tonGround pressure: 136 kPa {1.4 kgf/cm2}
Boom and Jib: Welded lattice construction using tubular, high-tensile steelchords with pin connections between sections.
Boom and Jib Length
Min. Length Max. Length(Min. Combination) (Max. Combination)
STANDARD
Crane Boom 24 m 108 m
Heavy Fixed Jib 66 m + 18 m 78 m + 18 m
Luffing Jib 30 m + 24 m 60 m + 72 m
HEAVY LIFT
Crane Boom 36 m 108 m
Heavy Fixed Jib 66 m + 18 m 78 m + 18 m
Luffing Jib 36 m + 24 m 66 m + 72 m
SUPER HEAVY LIFT
Crane Boom 36 m 126 m
Heavy Fixed Jib 66 m + 18 m 78 m + 18 m
84 m + 18 m 102 m + 18 m
Luffing Jib 36 m + 24 m 84 m + 84 m
Attachment
Main Specifications (Model: SL6000)Lift EnhancerHL Mast
STD--
450 t6.7 m
24 ~ 42 m
300 t9 m
30 ~ 84 m
90 ~ 108 m
105 t78 m18 m
184 t60 m72 m
HL30 m
-
367.5 t
36 ~ 42 m
300 t
36 ~ 84 m
90 ~ 108 m
120 t78 m18 m
200 t66 m72 m
66˚ ~ 86˚
110 m/min (1st layer)137 kN {14.0 tf}
28 mm830 m
0.9 min-1 {rpm}1.0/0.6 km/h
6 variable displacement31.9 MPa {325 kgf/cm2}
710 liters
Approx. 424 t136 kPa {1.4 kgf/cm2}
Upper: 180 metric tons Lower: 50 metric tons
SHL30 m~250 t
550 t
36 ~ 42 m
300 t
36 ~ 84 m
90 ~ 126 m
120 t 78 m 18 m
200 t84 m84 m
105 t102 m18 m
Additional WeightHeavy Duty Crane Boom
Max. Lifting Capacity
LengthCrane Boom
Max. Lifting Capacity
Length
LengthLong Boom
Heavy Fixed JibMax. Lifting CapacityMax. Combination (Boom)
(Jib)
Luffing Angle
Luffing JibMax. Lifting CapacityMax. Combination (Boom)
(Jib)
Hino E13C-UV320 kW/2,000 min-1 {rpm}
600 liters
Power PlantModelEngine OutputFuel Tank CapacityHoist Winch (H1, H2)Max. Line SpeedRated Line Pull (Single line)Wire Rope DiameterWire Rope Length
SwingTravel
PumpsMax. PressureHydraulic Tank Capacity
Working Weight*3
Ground Pressure*3
Counterweight
Working Speed
Hydraulic System
Weight
*1 Heavy Fixed Jib Type B2 *2 Heavy Fixed Jib Type C *3 Including base machine, counterweights =180 metric ton, carbody weights = 50 metric ton, 24 m boom with heavy boom tip and 450 metric ton hook block. Not include quick connection device and upper translifter.
*1 *2
Lower Structure
Weight
7
GENERAL DIMENSIONS
Crane Boom Unit: mm
Lift Enhancer
8
Luffing Jib Unit: mm
9
STANDARD
Boom length m (ft) Boom arrangement
30 (98)
36 (118)
42 (138)
48 (157)
54 (177)
66 (217)
78 (256)
60 (197)
72 (236)
84 (276)
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft)1.0 m (3.3 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert BoomBoom Top
indicates the most flexible combination of insert luffing booms, which can be modified to form all shorter luffing boom arrangements.6.0
12.0
8T
L
LUL 12.0 12.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 12.0 8T
LUL 6.0 12.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 8T
LUL 12.012.0 12.0 8T
LUL 6.0 12.0 12.0 12.0 12.0 8T
LUL 12.0 12.0 12.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 12.0 12.0 8T
LUL 6.0 12.0 12.0 12.0 12.0 12.0 8T
LUL 6.0 12.0 12.0 8T
LU
LUL 12.0 8T
LUL 6.0 6.0 8T
LUL 6.0 12.0 8T
LUL 6.0 6.0 12.0 8T
LUL 12.012.0 8T
Boom length m (ft) Boom arrangement
24 (79)
30 (98)
36 (118)
42 (138)
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft)1.0 m (3.3 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert BoomBoom Top
indicates the most flexible combination of insert heavy duty booms, which can be modified to form all shorter hevy duty boom arrangements.
HU
HU
L 6.0 6.0
6.0
12.0
12.0
12.0
8T
HUL 12.012.0 8T
8T
HUL
L
6.0 8T
HUL 6.0
6.0
6.0 8T
HUL 8T
12.0 HUL 8T
Heavy Duty Crane Boom Arrangements
BOOM AND JIB ARRANGEMENTSLuffing Boom Arrangementsfor Crane
Boom length m (ft) Boom arrangement
90 (295)
96 (315)
102 (335)
108 (354)
L 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 6.0JU
L 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0JU
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 6.0JU
L 12.012.0 12.0 12.0 12.0 8T 5.0 6.0 6.0JU
L 12.012.0 12.0 12.0 12.0 8T 5.0 6.0 12.0JU
6.0 6.0L 12.0 12.0 12.0 12.0 8T 5.0JU
12.0
L 12.012.0 12.0 12.0 12.0 8T 5.0JU
12.0
L 6.0 12.0 12.0 12.0 12.0 8T 5.0JU
12.0
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft) 5.0 m (16.4 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft) 8.0 m (26.2 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert Boom
Luffing Insert JibLuffing Insert JibLuffing Insert Jib
Jib Top
indicates the most flexible combination of insert long booms, which can be modified to form all shorter long boom arrangements.
6.0
12.0
8T
L
5.0
6.0
JU
12.0
L 6.0 6.0 12.0 12.0 12.0 12.0 8T 5.0 6.0 12.0JU
Long Boom Arrangements
10
Boom length m (ft) Boom arrangement
66 (217)
72 (236)
78 (256)
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft)1.0 m (3.3 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert BoomBoom Top
mark shows the guy line installing position when the fixed jib is used. indicates the most flexible combination of insert luffing booms, which can be modified to form all shorter luffing boom arrangements.
6.0
12.0
8T
L
LUL 12.0 12.0 12.0 12.0 8T
12.0 12.0 12.0 LUL 6.0 6.0 8T
LUL 6.0 12.0 12.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 12.0 12.0 8T
LUL 12.0 12.0 12.0 12.012.0 8T
LU
Heavy Fixed Jib Boom Arrangements
Jib length m (ft) Jib arrangement
18 (59) JUJL
Symbol Jib Length10.0 m (32.8 ft) 8.0 m (26.2 ft)
RemarksJib BaseJib TopJU
JL
Heavy Fixed Jib Arrangements
11
STANDARD
Boom length m (ft) Boom arrangement
30 (98)
36 (118)
42 (138)
48 (157)
54 (177)
60 (197)
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft)1.0 m (3.3 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert BoomBoom Top
indicates the most flexible combination of insert luffing booms, which can be modified to form all shorter luffing boom arrangements.6.0
12.0
8T
L
LUL 12.0 8T
LUL 6.0 6.0 8T
LUL 6.0 12.0 8T
LUL 6.0 6.0 12.0 8T
LUL 12.012.0 8T
LUL 6.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 8T
LUL 12.012.0 12.0 8T
LUL 6.0 12.0 12.0 12.0 8T
LU
Luffing Boom Arrangements for Luffing
Jib length m (ft) Jib arrangement
24 (79)
30 (98)
36 (118)
48 (157)
60 (197)
72 (236)
42 (138)
54 (177)
66 (217)
Symbol Jib Length10.0 m (32.8 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft) 8.0 m (26.2 ft)
RemarksJib Base
Luffing Insert JibLuffing Insert Jib
Jib Top
indicates the most flexible combination of insert luffing jibs, which can be modified to form all shorter luffing jib arrangements.
6.0
JU
12.0
6.0 12.0 12.0 12.0 12.0JUJL
6.0 6.0 12.0 12.0 12.0JUJL
6.0 12.0 12.0 12.0JUJL
6.0 6.0 12.0 12.0JUJL
6.0 12.0 12.0JUJL
12.012.0 12.0JUJL
12.012.0 12.0 12.0JUJL
6.0 6.0 12.0JUJL
6.0 12.0JUJL
12.0JUJL
6.0 6.0JUJL
6.0JUJL
12.012.0JUJL
JL
Luffing Jib Arrangements
12
90
80
70
60
50
40
30
20
10
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚
42 m36 m
30 m24 m
8070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
2.0 m
H
Center of rotation
Radius from center of rotation (m)
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Heavy Duty Crane Boom
WORKING RANGES
13
STANDARD
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚42 m
48 m
54 m
60 m
66 m
72 m
78 m
84 m
36 m30 m
8070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
90
80
70
60
50
40
30
20
10
Luffing Boom
WORKING RANGES
14
80˚82˚ 70˚ 60˚
50˚
40˚
30˚
90 m
96 m
102 m
108 m
120
110
100
90
80
70
60
50
40
30
20
10
8070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Long Boom
15
STANDARD
WORKING RANGES
80˚83˚
70˚
60˚
50˚
40˚
8070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
H=2.86 m Without quick connection ringH=3.08 m With quick connection ring
90
100
110
80
70
60
50
40
30
20
10
78 m Boom + 18 m Jib
72 m Boom + 18 m Jib
66 m Boom + 18 m Jib
Heavy Fixed Jib (Type A)
16
73˚
60˚
45˚
73˚
30˚
15˚
15˚24 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
24 m30 m
36 m42 m
48 m54 m
60 m66 m
72 m
140
130
120
110
100
90
80
70
60
50
40
30
20
10
908070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)
60 m
30 m
2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Luffing JibBoom Angle: 86°
17
STANDARD
63˚
60˚
45˚
63˚ 30˚
15˚
15˚24 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
24 m30 m
36 m42 m
48 m54 m
60 m66 m
72 m
140
130
120
110
100
90
80
70
60
50
40
30
20
10
908070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)
60 m
30 m
2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Luffing JibBoom Angle: 76°
WORKING RANGES
18
53˚
40˚
20˚
15˚
15˚24 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
24 m
30 m
36 m
42 m
48 m
54 m
140
130
120
110
100
90
80
70
60
50
40
30
20
10
908070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)
60 m
30 m
2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Luffing JibBoom Angle: 66°
19
CRANE BOOM SUPPLEMENTALDATA
1. Designed and rated to comply with EN13000.
2. Operating radius is the horizontal distance from centerlineof rotation to a vertical line through the center of gravity ofthe load.
3. Deduct weight of hook blocks, slings and all other load han-dling accessories from main boom ratings shown.
4. Ratings shown are based on freely suspended loads andmake no allowance for such factors as wind effect on liftedload, ground conditions, out-of-level operating speeds orany other condition that could be detrimental to the safeoperation of this equipment. The operator, therefore, hasthe responsibility to judge the existing conditions andreduce lifted load and operating speeds accordingly.
5. Ratings are for operation on a firm and level surface, up to 1 % gradient.
6. At radii and boom lengths where no ratings are shown onchart, operation is not intended nor approved.
7. Boom inserts, guy pipe and guy lines must be arranged asshown in the "OPERATOR'S MANUAL".
8. Boom hoist reeving is 30 part line.HL/SHL boom hoist reeving is 18 part line.
9. Boom backstops are required for all boom lengths.
10. The boom should be erected over the front of the crawlers,not laterally.
11. Ratings inside of boxes are limited by strength ofmaterials.
12. When erecting and lowering the boom length of 102 m orover, the blocks for erection must be placed at the end ofthe crawlers. (for STD MAST).
13. When erecting and lowering the boom length of 108 m, theblocks for erection must be placed at the end of thecrawlers. (for HL MAST).
14. The minimum rated show below.
15. (Main Boom Lifting)The total load that can be lifted is the value for weight ofhook block, slings, and all other load handling accessoriesdeducted from main boom rating shown.
16. (Main Boom Lifting with Auxiliary Sheave Frame)The total load that can be lifted is weight of auxiliary sheaveframe, hook block(s), slings, and all other load handlingaccessories deducted from main boom ratings shown.
17. (Auxiliary Sheave Lifting)The total load that can be lifted is weight of auxiliary sheaveframe, hook block(s), slings, and all other load handlingaccessories deducted from main boom ratings shown.
18. Ratings shown, but it should not exceed 14.0 ton in case ofone reeve, and it should not exceed 28.0 ton in case of tworeeve.
19. Auxiliary sheave ratings at any radius from center of rotationare the same as crane ratings shown in table for main boomwhen operated at the same radius. But maximum angle isthe same main boom maximum angle.
20. Boom lengths for auxiliary sheave mounting show below.
STD HL SHL
Heavy Crane NONE NONE NONE
Minimum Rated LoadHeavy Duty Crane Standard Crane Long Crane
- 7.7 ton 6.2 ton
STD HL SHL
STD Crane 30 m ~ 84 m 36 m ~ 84 m 36 m ~ 84 m
STD HL SHL
Long Crane 90 m ~ 102 m 90 m ~ 108 m 90 m ~ 120 m
Deduction auxiliary sheave frameHeavy Duty Crane Standard Crane Long Crane
0.7 ton 0.7 ton 0.7 ton
Deduction auxiliary sheave frameHeavy Duty Crane Standard Crane Long Crane
0.7 ton 0.7 ton 0.7 ton
20
21. Maximum hoist load for number of reeving parts of line forhoist rope.
22. Weight of hook block
*1: 6.82 ton: when hanger sheave is not equipped.*2: To reeve 11 parts of line or over, the hanger sheave (2 ton) is required.
Operation of this equipment in excess of rated loads ordisregard of instruction voids the warranty.
Main Hoist Loads for Standard Boom (Double Drum)No. of Parts of Line 8 12 16 20 24Maximum Loads (t) 112.0 164.0 220.0 280.0 300.0
No. of Parts of Line 1 2Maximum Loads (tons) 14.0 28.0
Auxiliary Hoist Loads
Weight of hook block
Hook block 550/450 ton 300 ton 200 ton 120 ton(with hanger sheave) (w/o hanger sheave)
Weight (t) 11.7 9.9 (*1) 7.1 (*2) 4.5
Weight of hook block
Hook block 70 ton 40 ton 14 tonBall hook
Weight (t) 3.1 2.0 0.9
No. of Parts of Line 36 44Maximum Loads (t) 450.0 550.0
Main Hoist Loads for Heavy Boom (Double Drum)No. of Parts of Line 8 12 16 20 24 28Maximum Loads (t) 112.0 164.0 220.0 280.0 336.0 370.0
Main Hoist Loads (Single Drum)No. of Parts of Line 1 2 3 4 5Maximum Loads (t) 14.0 28.0 42.0 56.0 70.0
No. of Parts of Line 6 7 8 9 10Maximum Loads (t) 84.0 98.0 112.0 126.0 140.0
No. of Parts of Line 11 12 13 14 15Maximum Loads (t) 152.0 164.0 174.0 184.0 192.0
No. of Parts of Line 16Maximum Loads (t) 200.0
21
HEAVY FIXED JIB SUPPLEMENTALDATA
1. Designed and rated to comply with EN13000.
2. Rated loads included in the charts are the maximum allow-able freely suspended loads at a given boom length, boomangle and load radius, and have been determined for themachine standing level on firm supporting surface underideal operating conditions. The user must limit or de-raterated loads to allow for adverse conditions (such as soft oruneven ground, out-of-level conditions, wind, side loads,pendulum action, jerking or sudden stopping of loads, inex-perience of personnel, multiple machine lifts, and travelingwith a load).
3. Rated loads do not exceed 75% of minimum tipping loads.Ratings inside of boxes are limited by strength ofmaterial or other factor except machine stability.
4. The machine must be reeved and set-up as stated in theoperation manual and all the instruction manuals. If thesemanuals are missing, obtain replacements. • Boom backstops are required for all boom lengths.• The crane must be leveled to within 1% on a firm support-ing surface.
5. Do not attempt to lift where no radius on load is listed ascrane may tip or collapse.
6. Attempting to lift more than rated loads may cause machineto tip or collapse. Do not tip machine to determine ratedloads.
7. Weight of hooks, hook blocks, slings and other liftingdevices are a part of the total load. Their total weight mustbe subtracted from the rated load to obtain the weight thatcan be lifted.
8. Configuration
9. Boom and Heavy Fixed Jib combinations
10. The boom should erected lowered over the front of thecrawlers
11. To prevent the boom from leaning toward backward, theown weight of hook block attached to heavy fixed jib pointmust be equal to or more than 4.5 t.
12. Maximum hoist load for number of reeving parts of line forhoist rope.
13. Rated loads listed apply only to the machine as originallymanufactured and designed by KOBELCO CRANESCO.,LTD. Modifications to this machine or use of equip-ment other than that specified can reduce operating capaci-ty.
Main Boom Hoist Loads (Double Drum)No. of Parts of Line 8(2x4) 10(2x5)
Maximum Loads (kN) 1,098 1,177Maximum Loads (t) 112.0 120.0
Main Boom Hoist Loads (Single Drum)No. of Parts of Line 1 2 3 4 5
Maximum Loads (kN) 137 275 412 549 686Maximum Loads (t) 14.0 28.0 42.0 50.0 70.0
No. of Parts of Line 6 7 8Maximum Loads (kN) 824 961 1,098
Maximum Loads (t) 84.0 98.0 112.0
Symbol Counterweight Carbody Weight HL Mast Radius Pallet Weight
A 200 t 50 t NONE NONE
B1 200 t 50 t 11 m NONE
B2 200 t 50 t 11 m 10 t
C 200 t 50 t 11 m 130 t
Boom JibType of configuration
A B1 B2 C
66 m 18 m N N N
72 m 18 m N N N
78 m 18 m Y N N
84 m 18 m N
90 m 18 m N
96 m 18 m N
102 m 18 m N
Boom JibType of configuration
A B1 B2 C
66 m 18 m Y Y Y
72 m 18 m Y Y Y N
78 m 18 m Y Y Y
84 m 18 m Y
90 m 18 mN
Y
96 m 18 m Y
102 m 18 m Y
Y: Applicable boom and heavy fixed jib combinationN: Not applicable boom and heavy fixed jib combination
Y: the blocks must be placed at the end of the crawlers for erection and lowering.
N: the blocks is not needed for erection and lowering.
Operation of this equipment in excess of rated loads ordisregard of instruction voids the warranty.
22
23
LUFFING JIB SUPPLEMENTAL DATA
1. Designed and rated to comply with EN13000.
2. Operating radius is the horizontal distance from centerlineof rotation to a vertical line through the center of gravity ofthe load.
3. Deduct weight of hook blocks, slings and all other load han-dling accessories from luffing jib ratings shown.
4. Ratings shown are based on freely suspended loads andmake no allowance for such factors as wind effect on liftedload, ground conditions, out-of-level operating speeds orany other condition that could be detrimental to the safeoperation of this equipment. The operator, therefore, hasthe responsibility to judge the existing conditions andreduce lifted load and operating speeds accordingly.
5. Ratings are for operation on a firm and level surface, up to1 % gradient.
6. At radii and boom lengths where no ratings are shown onchart, operation is not intended nor approved.
7. Boom and jib inserts and guy lines must be arranged asshown in the "OPERATOR'S MANUAL".
8. Boom hoist reeving is 30 part line.HL/SHL boom hoist reeving is 18 part line.Jib hoist reeving is 18 part line.
9. Boom and jib backstops are required for all boom lengths.
10. The boom should be erected over the front of crawlers, notlaterally.
11. Ratings inside of boxes are limited by strength ofmaterials.
12. When erecting and lowering the boom length of 54 m orover, the blocks for erection must be placed at the end ofthe crawlers. (for STD MAST).
13. The minimum rated load is 4.0 ton.
14. (Luffing Jib Rating Loads)The total load that can be lifted is the value for weight ofhook block, slings, and all other loads handling accessoriesdeducted from luffing jib ratings shown.
15. (Luffing Jib Lifting with Auxiliary Sheave Frame)The total load that can be lifted is the weight of hook block,slings, and all other loads handling accessories deductedfrom luffing jib ratings shown.
16. (Auxiliary Sheave Lifting)The total load that can be lifted over an auxiliary sheave isweight of hook block, slings, and all other loads handlingaccessories deducted from luffing jib ratings shown, but itshould not exceed 14.0 ton in case of one reeve.It should not exceed 28.0 ton in case of two reeves. Boom and jib combinations for auxiliary sheave mountingare all boom and jib combinations. Auxiliary sheave ratings at any radius from center of rota-tion are the same as luffing ratings shown in table for jibwhen operated at the same radius. But maximum angle is the same jib maximum angle.
17. Luffing boom and jib combinations.
Jib Length24 m 30 m 36 m 42 m 48 m 54 m 60 m 66 m 72 m 78 m 84 m(79 ft) (98 ft) (118 ft) (138 ft) (157 ft) (177 ft) (197 ft) (217 ft) (236 ft) (256 ft) (276 ft)
30 m (98 ft) * * * * * * * * *
36 m (118 ft) ** **
42 m (138 ft) ** **
48 m (157 ft) ** **
54 m (177 ft) ** **
60 m (197 ft) ** **
66 m (217 ft) *** *** *** *** *** *** *** *** *** ** **
72 m (236 ft) ** ** ** ** ** ** ** ** ** ** **
78 m (256 ft) ** ** ** ** ** ** ** ** ** **
84 m (276 ft) ** ** ** ** ** ** ** ** ** **: All luffing jib combinations which is not allowed.
: All luffing jib combinations which is allowed.
* : Standard-luffing jib combinations which is allowed.
** : Super heavy lift-Luffing jib combinations which is allowed.
*** : Heavy lift and Super heavy lift-Luffing jib combinations which is allowed.
Boo
m L
engt
h
Luffing jib pointhook block
21. Hook block and number of reeving parts of line restriction (1) The self-weight of luffing jib point hook block must be heavier than or equal to the table below.(2) Total number of reeving parts of line on luffing jib point hook block must be larger than or equal to the table below.
Follow the both (1) and (2) above at a same time for the luffing jib operation.Otherwise luffing jib may tip over the backwards due to lack of weight on front side of boom.Failure to observe this precaution may lead to the jib tipping backwards and resulted to machine collapsing.
24
18. Maximum hoist load for number of reeving parts of line forhoist rope.
19. Lifting capacities listed apply only to the machine as origi-nally manufactured and designed by KOBELCO CRANESCO.,LTD. Modifications to this machine or use of equipmentother than that specified can reduce operating capacity.
20. Designed and rated to comply with ASME Code B30.5.
No. of Parts of Line 8 12 16Maximum Loads (t) 112.0 164.0 200.0
Jib Hook (Double Drum)
No. of Parts of Line 1 2 3 4 5Maximum Loads (t) 14.0 28.0 42.0 56.0 70.0
No. of Parts of Line 6 7 8 9 10Maximum Loads (t) 84.0 98.0 112.0 126.0 140.0
No. of Parts of Line 11 12 13 14 15Maximum Loads (t) 152.0 164.0 174.0 184.0 192.0
No. of Parts of Line 16Maximum Loads (t) 200.0
Jib Hook Loads (Single Drum)
No. of Parts of Line 1 2Maximum Loads (t) 14.0 28.0
Auxiliary Sheave
Operation of this equipment in excess of rated loads ordisregard of instruction voids the warranty.
Danger!
Weight of hook block
Hook 200 ton 120 ton 70 ton 14 tonblock 40 ton Ball Hook
Weight (t) 7.05 4.5 3.1 2.0 0.9
SL6000 minimum hook block self-weight and minimum number of reeving parts of line on hook blockBoom Jib Length 24 m 30 m 36 m 42 m 48 m 54 m 60 m 66 m 72 m 78 m 84 mLength (79 ft) (98 ft) (118 ft) (138 ft) (157 ft) (177 ft) (197 ft) (217 ft) (236 ft) (256 ft) (276 ft)
30 m Hook Block Self-Weight (kg) 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000(98 ft) No. of Part Line 13 6 4 2 2 2 2 2 2 2 2
36 m Hook Block Self-Weight (kg) 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000(118 ft) No. of Part Line 11 6 4 2 2 2 2 2 2 2 2
42 m Hook Block Self-Weight (kg) 7,050 7,050 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000(138 ft) No. of Part Line 10 9 4 2 2 2 2 2 2 2 2
48 m Hook Block Self-Weight (kg) 7,050 7,050 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000(157 ft) No. of Part Line 9 9 4 2 2 2 2 2 2 2 2
54 m Hook Block Self-Weight (kg) 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000(177 ft) No. of Part Line 9 8 6 2 2 2 2 2 2 2 2
60 m Hook Block Self-Weight (kg) 7,050 7,050 7,050 3,100 2,000 2,000 2,000 2,000 2,000 2,000 2,000(197 ft) No. of Part Line 8 7 7 3 2 2 2 2 2 2 2
66 m Hook Block Self-Weight (kg) 7,050 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000(217 ft) No. of Part Line 7 7 6 2 2 2 2 2 2 2 2
72 m Hook Block Self-Weight (kg) 7,050 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000(236 ft) No. of Part Line 7 6 6 2 2 2 2 2 2 2 2
78 m Hook Block Self-Weight (kg) 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000(256 ft) No. of Part Line 6 5 2 2 2 2 2 2 2 2
84 m Hook Block Self-Weight (kg) 7,050 7,050 4,500 3,100 2,000 2,000 2,000 2,000 2,000 2,000(276 ft) No.of Part Line 5 5 3 2 2 2 2 2 2 2
Weight of KOBELCO genuine hook block.200 t hook block 7,050 kg 70 t hook block 3,100 kg120 t hook block 4,500 kg 40 t hook block 2,000 kg
Note: Designed and rated to comply with EN13000 . Ratings shown in are determined by the strength of the boom or other structural components.
Note: Designed and rated to comply with EN13000 . Ratings shown in are determined by the strength of the boom or other structural components.
BoomLength
(m)WorkingRadius (m)
24.0 30.0 36.0 42.0
6.0 7.0 8.0 9.010.012.014.016.018.020.022.024.026.028.030.034.038.042.0
Reeves
BoomLength (m) Working
Radius (m)
6.0 7.0 8.0 9.010.012.014.016.018.020.022.024.026.028.030.034.038.042.0
Reeves
6.7 m/450.0425.0375.0330.0294.0233.3192.0158.7133.3114.4 97.4
36
7.5 m/390.0365.0325.0292.0232.8191.5158.8133.3114.4 97.3 87.0 78.5 70.7
28.6 m/68.5
36
8.3 m/340.0322.0290.0232.1190.7158.9133.4114.3 97.2 86.9 78.3 70.4 63.7
33.8 m/53.5
28
9.2 m/311.7280.1225.0187.0158.6133.1114.0 97.1 86.4 77.8 69.8 63.1 52.4 44.4
39.0 m/42.624
BoomLength
(m)WorkingRadius (m)
90.0 96.0 102.0 108.0
14.016.018.020.022.024.026.028.030.034.038.042.046.050.054.058.062.066.070.072.0
Reeves
BoomLength (m) Working
Radius (m)
14.016.018.020.022.024.026.028.030.034.038.042.046.050.054.058.062.066.070.072.0
Reeves
15.0 m/98.096.093.090.081.172.664.958.452.944.137.031.026.021.818.114.812.0 9.5 7.2 6.2
7
15.8 m/84.083.781.178.576.070.864.258.352.843.335.830.225.421.317.614.411.6 9.0 6.7
6
16.6 m/70.068.566.364.262.160.057.351.342.135.129.724.920.817.114.011.1 8.5 6.2
5
17.5m /60.058.855.151.448.445.442.940.436.733.228.622.617.312.7 8.7
60.0m /6.8
5
Note: Designed and rated to comply with EN13000 . Ratings shown in are determined by the strength of the boom or other structural components.
BoomLength
(m)WorkingRadius (m)
72.0 78.066.0
18.0
20.022.024.026.028.030.034.038.042.046.050.054.058.062.0
Reeves
BoomLength(m) Working
Radius (m)
Jib Length (m)Jib Length (m)
20.022.024.026.028.030.034.038.042.046.050.054.058.062.0
Reeves
105.0 98.1 88.1 79.6 71.1 63.6 51.5 42.0 34.4 28.2 23.1 18.7 14.9 11.6
8
100.0 94.7 85.0 76.7 69.5 62.3 50.1 40.6 33.0 26.8 21.7 17.3 13.5 10.3
8
95.091.281.973.866.860.648.639.131.525.320.115.711.9 8.7
8
LIFTING CAPACITIESHeavy Duty Crane Boom Lifting Capacities
Long Boom Lifting Capacities
25
STANDARD
Counterweight: 180.0 ton, Carbody weight: 50.0 tonUnit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 tonUnit: ton
Heavy Fixed Jib (Type A) Lifting Capacities
Counterweight: 200.0 ton Carbody weight: 50.0 ton
Unit: ton
BoomLength
(m)WorkingRadius (m)
30.0 36.0 42.0 48.0 54.0 60.0 66.0 72.0 78.0 84.0
7.0 8.0 9.010.012.014.016.018.020.022.024.026.028.030.034.038.042.046.050.054.058.062.066.0
Reeves
BoomLength (m) Working
Radius (m)
7.0 8.0 9.010.012.014.016.018.020.022.024.026.028.030.034.038.042.046.050.054.058.062.066.0
Reeves
7.7 m/300.0300.0300.0292.1230.2188.9157.8132.4113.4 98.6 86.9 77.3 69.4
28.7 m/66.8
24
8.5 m/300.0300.0291.4229.5188.2157.6132.1113.0 98.3 86.5 76.9 68.9 62.2
33.9 m/51.7
24
9.3 m/300.0278.2222.9184.8156.9131.4112.3 97.5 85.7 76.1 68.1 61.4 50.7 42.6
39.1 m/40.7
24
10.2 m/258.6212.7177.0150.7130.5111.8 96.9 85.1 75.5 67.4 60.7 49.9 41.8 35.4
44.3 m/32.3
20
11.0 m/224.6203.2169.8145.0125.7110.3 96.4 84.6 74.9 66.8 60.1 49.3 41.0 34.6 29.5
49.5 m/25.7
20
11.8 m/197.3194.3163.0139.4121.0106.2 94.2 83.9 74.2 66.1 59.3 48.4 40.2 33.7 28.3 23.8 20.6
54.7 m/19.6
16
12.7 m/175.1156.5134.1116.5102.4 90.7 81.0 72.7 65.4 58.6 47.7 39.4 32.7 27.2 22.6 18.9 15.7
59.9 m/14.4
16
13.5 m/156.1149.9128.6111.9 98.3 87.0 77.6 69.6 62.7 56.7 46.7 38.4 31.4 25.9 21.3 17.5 14.3 11.6
65.1 m/9.712
14.3 m/140.3123.8107.8 94.7 83.9 74.8 67.0 60.3 54.4 44.7 37.0 30.4 24.8 20.2 16.4 13.1 10.3 7.6
12
15.2 m/126.4119.0103.6 91.1 80.6 71.8 64.2 57.7 52.0 42.4 34.9 28.7 23.6 19.0 15.1 11.9 8.8
12
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
26
Counterweight: 180.0 ton, Carbody weight: 50.0 tonUnit: ton
Luffing Boom Lifting Capacities
27
STANDARD
LIFTING CAPACITIES
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
30.0
Reeves 16 8 8 8 8
14.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
14.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
184.0
173.5
160.5
151.0
141.6
125.3
112.2
100.1
89.8
81.3
93.7
84.2
76.2
69.5
58.8 54.9
47.3
111.6
107.1
97.9
89.3
80.9
73.8
62.5
54.0
47.2
41.8
57.7
49.7
43.5
38.4
34.3
35.1
31.3
28.1
85.2
85.2
78.9
73.1
61.9
53.3
46.6
41.2
36.7
32.7
28.5
48.8
42.6
37.5
33.4
29.9
27.0
24.5
30.2
27.0
24.2
21.9
19.9
67.3
67.3
60.4
52.2
45.5
40.1
34.6
29.5
25.2
21.6
18.6
16.1
36.2
31.9
28.3
25.2
22.6
20.5
18.6
17.1
21.9
19.5
17.5
15.8
14.3
13.0
60.2
58.7
51.8
45.1
39.4
33.0
27.8
23.5
19.8
16.7
14.1
11.9
35.0
30.7
27.1
24.1
21.5
19.3
17.4
15.8
14.4
18.3
16.3
14.5
13.0
11.7
10.6
9.8
30.0 m B
oo
m L
eng
th
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
36.0
Reeves 16 8 8 8 8
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
167.8
157.0
148.2
139.4
124.3
111.3
99.8
89.6
81.1
73.8
82.5
74.7
68.1
57.6
45.4
39.6
111.0
103.7
95.0
87.6
80.7
73.6
62.4
53.8
47.1
41.7
56.4
48.6
42.5
37.5
33.4
33.5
29.8
26.7
24.0
84.7
82.7
76.6
71.3
61.5
53.0
46.3
40.9
36.5
32.4
28.1
41.4
36.4
32.4
29.0
26.1
23.7
25.1
22.4
20.1
18.1
16.3
66.8
66.8
58.7
51.9
45.2
39.8
34.4
29.2
24.9
21.2
18.1
15.5
34.8
30.5
27.0
24.0
21.5
19.4
17.5
16.0
17.7
15.8
14.1
12.7
11.3
10.1
59.7
57.0
50.3
44.9
39.2
32.8
27.5
23.1
19.4
16.3
13.6
11.3
29.4
25.8
22.9
20.3
18.2
16.3
14.7
13.4
11.4
14.5
12.8
11.4
10.1
9.1
8.2
36.0 m B
oo
m L
eng
th
Counterweight: 180.0 ton, Carbody weight: 50.0 tonUnit: tonLuffing Jib Lifting Capacity
28
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
42.0
Reeves 12 8 8 8 8
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
15.4 m/156.2
151.0
142.7
134.4
121.0
110.0
99.3
89.1
80.6
73.4
72.9
66.4
56.2
48.3 43.1
37.6
96.6
92.1
85.0
78.8
73.4
62.2
53.7
47.0
41.6
47.4
41.4
36.5
32.5
29.2
27.8
24.8
22.2
19.9
84.1
80.2
74.4
69.2
60.7
52.7
46.0
40.6
36.2
32.0
27.7
40.1
35.2
31.3
27.9
25.0
22.6
20.6
20.1
17.9
16.0
14.3
12.9
66.3
65.1
57.0
50.4
44.9
39.5
34.0
28.8
24.4
20.8
17.6
15.0
33.2
29.1
25.6
22.7
20.3
18.2
16.4
14.9
13.6
15.8
13.9
12.3
10.8
9.5
8.4
59.2
55.3
48.9
43.5
38.7
32.4
27.1
22.7
19.0
15.8
13.1
10.8
27.9
24.5
21.6
19.1
17.0
15.1
13.6
12.3
11.2
12.6
11.0
9.6
8.4
7.4
6.6
5.7
42.0 m B
oo
m L
eng
th
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
48.0
Reeves 12 8 8 8 8
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
16.2 m/143.5
137.4
129.6
116.9
106.4
97.7
88.8
80.3
73.2
71.1
64.8
54.7
47.1
35.2
30.9
96.0
89.1
82.3
76.4
71.2
61.8
53.3
46.6
41.2
45.9
40.0
35.3
31.4
28.1
25.0
22.2
19.7
17.6
82.4
77.6
72.0
67.1
58.9
51.9
45.4
40.2
35.9
31.4
27.1
38.6
33.9
29.9
26.5
23.7
21.2
19.1
17.6
15.6
13.8
12.2
10.9
65.7
63.0
55.2
48.8
43.6
39.2
33.5
28.3
23.9
20.2
17.1
14.4
27.6
24.2
21.4
19.0
16.9
15.2
13.7
12.3
11.7
10.1
8.8
7.6
6.5
58.6
53.5
47.3
42.2
37.9
31.9
26.6
22.2
18.4
15.2
12.5
10.2
26.3
23.0
20.1
17.8
15.7
13.9
12.4
11.1
10.1
9.1
7.8
6.7
48.0 m B
oo
m L
eng
th
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
Counterweight: 180.0 ton, Carbody weight: 50.0 tonUnit: tonLuffing Jib Lifting Capacity
29
STANDARD
BOOM AND JIB ARRANGEMENTS
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
54.0
Reeves 12 8 8 8 8
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
132.2
124.8
112.8
102.8
94.5
87.3
80.0
72.8 63.0
53.2
45.7
32.1
28.1
93.7
86.1
79.6
74.0
69.0
60.6
52.9
46.2
40.9
43.8
38.5
33.8
29.9
26.7
23.9
19.5
17.2
15.2
13.6
74.0
69.7
65.0
57.0
50.6
45.2
39.9
35.5
30.7
26.4
31.9
28.0
24.8
22.1
19.7
17.7
13.1
11.5
10.0
8.8
7.7
64.2
60.9
53.4
47.2
42.2
37.9
32.7
27.6
23.2
19.6
16.5
13.8
25.9
22.7
19.9
17.6
15.6
13.9
12.4
11.0
58.1
51.7
45.8
40.8
36.6
31.2
25.9
21.5
17.8
14.6
11.9
9.6
21.5
18.7
16.4
14.4
12.7
11.2
9.9
8.9
8.0
54.0 m B
oo
m L
eng
th
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
60.0
Reeves 12 8 8 8 8
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
17.8 m/121.3
120.1
108.7
99.3
91.3
84.5
78.6
72.5
51.3
44.2
38.4
25.1
22.0
90.4
83.2
77.0
71.5
66.7
58.7
52.3
45.8
40.5
36.1
31.6
27.9
24.8
22.2 14.4
12.7
11.1
72.4
67.3
62.8
55.2
49.0
43.9
39.6
34.8
29.8
25.6
29.8
26.4
23.3
20.7
18.4
16.4
14.7
10.9
9.4
8.0
6.9
58.3
51.5
45.6
40.7
36.6
31.7
26.7
22.4
18.8
15.8
13.1
23.8
21.1
18.4
16.2
14.3
12.6
11.2
10.0
8.8
47.7
44.2
39.4
35.3
30.1
25.0
20.7
17.1
14.0
11.3
9.0
7.0
19.4
17.0
14.8
13.0
11.3
9.9
8.7
7.7
6.8
60.0 m B
oo
m L
eng
th
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
Counterweight: 180.0 ton, Carbody weight: 50.0 tonUnit: tonLuffing Jib Lifting Capacity
30
31
HEAVY LIFT
BOOM AND JIB ARRANGEMENTS
Boom length m (ft) Boom arrangement
36 (118)
42 (138)
48 (157)
54 (177)
60 (197)
72 (236)
84 (276)
66 (217)
78 (256)
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft)1.0 m (3.3 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert BoomBoom Top
indicates the most flexible combination of insert luffing booms, which can be modified to form all shorter luffing boom arrangements.6.0
12.0
8T
L
1UL 6.0 6.0 12.0 12.0 12.0 12.0 8T
1UL 6.0 6.0 12.0 12.0 12.0 8T
1UL 6.0 6.0 12.0 12.0 8T
1UL 12.012.0 12.0 8T
1UL 12.012.0 12.0 12.0 8T
1UL 12.012.0 12.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 8T
1UL 6.012.0 12.0 8T
1UL 12.0 12.0 8T
1UL 6.06.0 12.0 8T
1UL 6.0 12.0 8T
1U
Boom length m (ft) Boom arrangement
36 (118)
42 (138)
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft)1.0 m (3.3 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert BoomBoom Top
indicates the most flexible combination of insert heavy duty booms, which can be modified to form all shorter heavy duty boom arrangements.
6.0
12.0
U
UL 6.0 6.012.0 8T
UL 6.0 12.0 8T
UL 12.0 12.0 8T
8T
L
Heavy Duty Crane Boom Arrangements
Luffing Boom Arrangementsfor Crane
Boom length m (ft) Boom arrangement
90 (295)
96 (315)
102 (335)
108 (354)
L 6.012.012.0 12.0 12.0 8T 5.0 6.0 6.0U
L 6.0 6.0 12.012.0 12.0 12.0 8T 5.0 6.0 12.0U
L 6.0 6.0 12.012.0 12.0 12.0 8T 5.0 6.0 6.0U
L 12.012.012.0 12.0 12.0 8T 5.0 6.0 6.0U
L 12.012.012.0 12.0 12.0 8T 5.0 6.0 12.0U
L 6.0 6.0 12.012.0 12.0 12.0 8T 5.0U
12.0
L 12.012.012.0 12.0 12.0 8T 5.0U
12.0
L 6.012.012.0 12.0 12.0 8T 5.0U
12.0
L 6.012.012.0 12.0 12.0 8T 5.0 6.0U
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft) 5.0 m (16.4 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft) 8.0 m (26.2 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert Boom
Luffing Insert JibLuffing Insert JibLuffing Insert Jib
Jib Top
indicates the most flexible combination of insert long booms, which can be modified to form all shorter long boom arrangements.
6.0
12.0
8T
L
5.0
6.0
U
12.0
Long Boom Arrangements
32
Boom length m (ft) Boom arrangement
66 (217)
72 (236)
78 (256)
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft)1.0 m (3.3 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert BoomBoom Top
mark shows the guy line installing position when the fixed jib is used. indicates the most flexible combination of insert luffing booms, which can be modified to form all shorter luffing boom arrangements.
6.0
12.0
8T
L
1UL 6.0 6.0 12.0 12.0 12.0 8T
1UL 12.012.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 12.0 8T
1UL 6.0 6.012.0 12.0 12.0 12.0 8T
1UL 12.0 12.0 12.0 12.0 12.0 8T
1U
Heavy Fixed Jib Boom Arrangements (Type B1)
Jib length m (ft) Jib arrangement
18 (59) JUJL
Symbol Jib Length10.0 m (32.8 ft) 8.0 m (26.2 ft)
RemarksJib BaseJib TopJU
JL
Heavy Fixed Jib Arrangements (Type B1)
Symbol Mast Length 9.0 m (29.5 ft)12.0 m (39.4 ft)10.0 m (32.8 ft)
RemarksMast BaseInsert MastMast Top
12.0
UM
ML
ML
12.0
UM
Boom length m (ft) Boom arrangement
36 (118)
42 (138)
48 (157)
54 (177)
60 (197)
66 (217)
LUL 6.012.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 8T
LUL 6.012.0 12.0 8T
LUL 12.06.0 12.0 8T
LUL 6.0 12.0 8T
LUL 12.0 12.0 8T
LUL 12.012.0 12.0 8T
LUL 12.012.0 12.0 12.0 8T
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft)1.0 m (3.3 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert BoomBoom Top
indicates the most flexible combination of insert luffing booms, which can be modified to form all shorter luffing boom arrangements.
6.0
12.0
8T
L
LU
Luffing Boom Arrangements for Luffing
Jib length m (ft) Jib arrangement
24 (79)
30 (98)
36 (118)
48 (157)
60 (197)
72 (236)
42 (138)
54 (177)
66 (217)
Symbol Jib Length10.0 m (32.8 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft) 8.0 m (26.2 ft)
RemarksJib Base
Luffing Insert JibLuffing Insert Jib
Jib Top
indicates the most flexible combination of insert luffing jibs, which can be modified to form all shorter luffing jib arrangements.
6.0
JU
12.0
6.0 6.0 12.0 12.0JUJL
12.012.0 12.0JUJL
6.0 12.0 12.0 12.0JUJL
6.0 12.0 12.0JUJL
6.0 6.0 12.0JUJL
6.0 12.0JUJL
6.0 6.0JUJL
6.0JUJL
12.0JUJL
12.012.0JUJL
6.06.0 12.0 12.0 12.0JUJL
12.012.0 12.0 12.0JUJL
6.0 12.0 12.0 12.0 12.0JUJL
JL
Luffing Jib Arrangements
HL MAST
33
HEAVY LIFT
BOOM AND JIB ARRANGEMENTS
34
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚
42 m36 m
90
80
70
60
50
40
30
20
10
8070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Heavy Duty Crane Boom
WORKING RANGES
35
HEAVY LIFT
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚
42 m
48 m
54 m
60 m
66 m
72 m
78 m
84 m
36 m
90
80
70
60
50
40
30
20
10
8070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Luffing Boom
WORKING RANGES
36
80˚82˚ 70˚ 60˚
50˚
40˚
30˚
90 m
96 m
102 m
108 m
120
110
100
90
80
70
60
50
40
30
20
10
8070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Long Boom
37
HEAVY LIFT
WORKING RANGES
80˚83˚
70˚
60˚
50˚
40˚
30˚
9070 80605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
H=2.86 m Without quick connection ringH=3.08 m With quick connection ring
90
100
110
80
70
60
50
40
30
20
10
78 m Boom + 18 m Jib
72 m Boom + 18 m Jib
66 m Boom + 18 m Jib
Heavy Fixed Jib (Type B1)
38
73˚
60˚
45˚
73˚
30˚
15˚
15˚24 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
24 m30 m
36 m42 m
48 m54 m
60 m66 m
72 m
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
908070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)
66 m
36 m
2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Luffing JibBoom Angle: 86°
39
HEAVY LIFT
63˚
60˚
45˚
63˚ 30˚
15˚
15˚24 m30 m
36 m
42 m48 m
54 m
60 m
66 m
72 m
24 m30 m
36 m42 m
48 m54 m
60 m66 m
72 m
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
908070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)
66 m
36 m
2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Luffing JibBoom Angle: 76°
WORKING RANGES
40
53˚
45˚
53˚ 30˚
15˚
15˚24 m
30 m
36 m
42 m
48 m
54 m
60 m
66 m
72 m
24 m30 m
36 m42 m
48 m54 m
60 m
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
908070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)
66 m
36 m
2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Luffing JibBoom Angle: 66°
BoomLength
(m)WorkingRadius (m)
36.0 42.0
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
BoomLength (m) Working
Radius (m)
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
8.3 m/367.5330.0286.4225.4184.9156.0134.4117.7104.1 93.2 84.0 76.2 69.5 63.5
33.8 m/58.7
28
9.2 m/323.3286.9225.9185.2156.1134.3117.4103.9 92.8 83.6 75.9 69.1 63.3 58.2 53.7 49.7
39.0 m/47.824
BoomLength
(m)WorkingRadius (m)
90.0 96.0 102.0 108.0
14.016.018.020.022.024.026.028.030.032.034.036.038.040.044.048.052.056.060.064.068.072.076.080.0
Reeves
BoomLength (m) Working
Radius (m)
14.016.018.020.022.024.026.028.030.032.034.036.038.040.044.048.052.056.060.064.068.072.076.080.0
Reeves
15.0 m/98.098.098.098.089.981.073.566.961.156.051.547.443.539.933.828.924.721.218.215.413.010.8 8.9
80.1 m/7.27
15.8 m/98.098.098.097.587.478.871.565.159.454.449.945.942.339.033.228.324.220.717.614.812.410.2 8.3 6.7
7
16.6 m/84.084.084.084.075.968.762.356.851.847.543.540.036.731.126.422.418.915.913.310.9 8.9 7.0
6
17.5 m /84.084.084.081.973.866.760.555.150.346.042.138.735.530.025.321.418.015.012.410.0 8.0 6.2
6
Note: Designed and rated to comply with EN13000 . Ratings shown in are determined by the strength of the boom or other structural components.
Note: Designed and rated to comply with EN13000 . Ratings shown in are determined by the strength of the boom or other structural components.
41
HEAVY LIFT
LIFTING CAPACITIESHeavy Duty Crane Boom Lifting Capacities
Long Boom Lifting Capacities
Counterweight: 180.0 ton, Carbody weight: 50.0 tonHL Mast point radius: 11 m to 16 m
Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 tonHL Mast point radius: 11 m to 16 m
Unit: ton
Note: Designed and rated to comply with EN13000 . Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
BoomLength
(m)WorkingRadius (m)
72.0 78.066.0
20.022.024.026.028.030.034.038.042.046.050.054.058.062.066.070.0
Reeves
BoomLength (m) Working
Radius (m)
20.022.024.026.028.030.034.038.042.046.050.054.058.062.066.070.0
Reeves
120.0107.9 95.5 85.1 76.3 68.8 56.6 47.1 39.5 33.3 28.2 23.8 20.1 16.9 14.1 11.6
10
120.0107.2 94.6 84.2 75.4 67.8 55.6 46.0 38.4 32.2 27.0 22.6 18.9 15.7 12.9 10.4
10
117.0104.8 93.7 83.2 74.4 66.8 54.4 44.9 37.2 31.0 25.8 21.4 17.6 14.4 11.5 9.1
10
18.0Jib Length (m) Jib Length (m)
Heavy Fixed Jib (Type B1) Lifting Capacities
Counterweight: 200.0 ton, Carbody weight: 50.0 tonHL Mast point radius: 11 m
Unit: ton
42
BoomLength
(m)WorkingRadius (m)
36.0 42.0 48.0 54.0 60.0 66.0 72.0 78.0 84.0
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.042.044.046.048.050.052.054.056.058.060.062.064.066.068.070.072.0
Reeves
BoomLength (m) Working
Radius (m)
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.042.044.046.048.050.052.054.056.058.060.062.064.066.068.070.072.0
Reeves
8.5 m/300.0300.0286.5224.9184.0154.8132.9116.0102.4 91.3 82.0 74.2 67.5 61.6
33.9 m/56.6
24
9.3 m/300.0287.1225.3184.2154.9132.9115.9102.2 91.1 81.8 74.0 67.2 61.4 56.3 51.7 47.7
39.1 m/45.6
24
10.2 m/280.5225.0183.8154.6132.6115.5101.9 90.7 81.4 73.5 66.8 60.9 55.8 51.3 47.3 43.6 40.4 37.4
44.3 m/37.0
24
11.0 m/252.1224.6183.3153.9132.0114.8101.2 90.1 80.8 72.9 66.1 60.3 55.1 50.6 46.6 43.0 39.7 36.8 34.1 31.6
49.5 m/29.9
20
11.8 m/225.4221.9183.0153.4131.4114.3100.6 89.6 80.3 72.4 65.7 59.8 54.7 50.2 46.1 42.5 39.3 36.3 33.7 31.2 29.0 26.9 25.0
54.7 m/24.3
20
12.7 m/199.7178.8152.7129.7113.5 99.8 88.6 79.3 71.5 64.8 58.9 53.8 49.3 45.3 41.7 38.4 35.5 32.8 30.4 28.1 26.0 24.1 22.4 20.7
59.9 m/19.2
16
13.5 m/178.2171.2147.4128.5112.6 98.9 87.7 78.3 70.4 63.8 58.0 52.8 48.3 44.3 40.7 37.5 34.5 31.8 29.3 27.1 25.0 23.0 21.2 19.5 18.0 16.6 15.4
65.1 m/14.8
16
14.3 m/160.6142.2124.1109.5 97.3 87.1 77.6 69.7 63.0 57.1 52.0 47.4 43.6 40.0 36.7 33.7 31.0 28.5 26.1 23.9 21.8 20.0 18.3 16.7 15.3 14.0 12.8 11.7 10.6
70.3 m/10.512
15.2 m/145.2137.0119.7105.6 93.8 84.0 75.5 68.2 61.8 56.1 51.1 46.4 42.6 39.0 35.6 32.7 30.0 27.3 24.9 22.6 20.6 18.7 16.9 15.3 13.9 12.5 11.2 10.0 8.8 7.7
12
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Boom Lifting Capacities Counterweight: 180.0 ton, Carbody weight: 50.0 ton
HL Mast point radius: 11 m to 16 m
Unit: ton
43
HEAVY LIFT
LIFTING CAPACITIES
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
36.0
Reeves 16 12 8 8 8
14.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
14.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
14.4 m/200.0
193.2
181.9
170.3
159.4
141.1
126.4
114.4
103.2
93.9
85.9
96.0
87.3
79.9
68.2
54.8
48.2
132.7
120.5
110.2
101.4
92.1
84.3
71.7
62.2
54.7
48.7
65.9
57.0
50.1
44.5
39.9
40.4
36.2
32.6
29.7
101.5
96.5
89.3
83.0
70.9
61.3
53.8
47.7
42.7
38.6
35.1
48.1
43.3
38.7
34.8
31.6
28.8
30.5
28.3
25.7
23.5
21.6
76.0
74.1
68.8
60.2
52.7
46.6
41.6
37.4
33.8
30.8
28.2
25.9
40.5
37.4
33.5
30.2
27.4
25.0
22.9
21.0
22.8
22.0
20.0
18.3
16.8
15.5
64.3
60.0
54.2
49.3
45.1
41.1
36.9
33.4
30.3
27.7
25.4
23.4
35.0
33.0
29.7
26.9
24.5
22.3
20.5
18.8
17.4
19.4
19.4
17.7
16.2
14.9
13.7
36.0 m B
oo
m L
eng
th
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
42.0
Reeves 16 12 8 8 8
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
15.4 m/181.6
175.9
166.1
156.3
140.0
125.4
113.5
102.7
93.4
85.5
85.4
78.2
66.6
57.8 52.5
46.1
116.7
106.9
98.4
91.2
83.8
71.3
61.8
54.3
48.4
55.5
48.7
43.2
38.7
35.0
34.1
30.9
28.0
25.6
94.1
93.1
86.7
80.6
70.4
60.9
53.4
47.4
42.4
38.3
34.8
46.7
42.1
37.6
33.8
30.6
27.8
25.5
25.7
24.1
22.0
20.2
18.6
74.9
73.6
66.9
59.1
52.3
46.3
41.3
37.1
33.5
30.5
27.9
25.7
39.1
36.2
32.4
29.2
26.5
24.1
22.0
20.2
18.7
20.9
20.5
18.6
17.0
15.5
14.3
61.0
58.9
54.0
48.9
45.0
40.8
36.7
33.1
30.0
27.4
25.1
23.1
33.7
32.0
28.7
26.0
23.6
21.5
19.7
18.0
16.6
17.4
17.4
16.3
14.8
13.5
12.3
11.2
42.0 m B
oo
m L
eng
th
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonHL Mast point radius: 16 m
Unit: ton
44
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
48.0
Reeves 16 12 8 8 8
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
16.2 m/167.4
160.1
150.8
135.8
123.4
112.6
102.2
92.9
85.0
83.4
76.3
65.0
56.3
43.9
38.9
113.0
103.6
95.5
88.4
82.3
70.9
61.4
53.9
48.0
53.9
47.3
41.9
37.5
33.8
32.1
29.0
26.2
23.8
90.2
88.0
84.1
78.3
68.5
60.5
53.1
47.0
42.1
37.9
34.5
45.1
40.8
36.4
32.6
29.5
26.8
24.6
23.8
22.5
20.4
18.6
17.1
67.3
66.0
62.9
57.4
51.2
45.9
41.0
36.8
33.3
30.2
27.6
25.4
33.2
31.1
28.2
25.5
23.2
21.1
19.4
17.8
16.5
16.5
15.0
13.7
12.5
11.6
58.4
56.3
53.8
48.6
44.8
40.4
36.4
32.8
29.8
27.2
24.9
22.9
32.3
30.0
27.1
24.6
22.4
20.5
18.8
17.2
15.8
13.5
13.5
12.7
11.5
10.4
9.5
48.0 m B
oo
m L
eng
th
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
54.0
Reeves 12 8 8 8 8
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
154.3
145.5
131.2
119.3
109.4
101.0
92.4
84.5 74.3
63.2
54.7
41.4
36.7
109.3
100.2
92.5
85.7
79.8
69.9
60.9
53.5
47.6
51.7
45.8
40.5
36.2
32.6
29.6
26.7
24.3
22.0
20.1
80.7
78.2
75.6
66.5
58.9
52.6
46.7
41.7
37.6
34.2
38.2
34.8
31.5
28.4
25.8
23.5
19.0
18.2
16.6
15.2
14.1
63.1
61.8
58.7
55.2
49.6
44.6
40.3
36.5
33.0
30.0
27.4
25.1
31.8
28.9
26.1
23.7
21.6
19.8
18.2
16.8
12.6
12.6
11.4
10.3
9.3
8.6
55.1
52.9
50.3
47.5
43.4
39.2
35.5
32.4
29.5
26.9
24.6
22.6
27.2
25.1
22.7
20.6
18.8
17.1
15.7
14.4
13.4
9.8
9.8
9.3
8.3
7.4
6.7
54.0 m B
oo
m L
eng
th
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonHL Mast point radius: 16 m
Unit: ton
45
HEAVY LIFT
LIFTING CAPACITIES
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
60.0
Reeves 12 8 8 8 8
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
17.8 m/141.8
140.3
126.7
115.4
105.9
97.8
90.8
84.0
61.4
53.1
46.6
34.5
30.7
103.2
97.0
89.5
83.0
77.3
67.8
60.2
53.1
47.1
43.2
38.7
34.9
31.3
28.4 21.7
19.7
18.0
76.5
74.2
71.7
64.4
57.1
51.0
46.0
41.3
37.2
33.8
36.1
32.5
29.3
26.6
24.3
22.4
20.6
16.8
15.6
14.1
12.8
11.7
58.2
55.3
52.1
48.1
43.2
39.0
35.4
32.3
29.6
27.1
24.8
29.7
26.7
24.1
21.8
19.8
18.0
16.5
15.1
14.1
10.5
10.3
9.1
8.1
7.2
6.5
49.4
47.0
44.3
41.6
37.9
34.4
31.3
28.6
26.3
24.2
22.4
20.6
25.7
23.1
20.8
18.8
17.0
15.5
14.1
12.9
11.9
60.0 m B
oo
m L
eng
th
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
66.0
Reeves 12 8 8 8 8
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 72.0Jib length (m) Jib length (m)
18.5 m/131.7
122.2
111.4
102.3
94.5
87.8
82.0
57.5
50.8
45.0
28.0
25.4
95.3
91.5
86.5
80.3
74.8
65.6
58.2
52.2
46.7
40.1
35.9
32.3
29.3
26.8 18.4
16.6
15.0
13.7
71.3
68.1
66.6
61.6
55.2
49.3
44.5
40.3
36.9
33.4
33.4
29.9
26.9
24.4
22.2
20.3
18.7
12.5
11.4
10.2
9.1
8.3
55.1
52.2
49.0
45.7
41.7
37.6
34.2
31.2
28.6
26.3
24.4
24.4
21.9
19.7
17.8
16.1
14.7
13.4
12.3
46.4
44.0
41.4
38.8
36.2
33.1
30.1
27.5
25.3
23.3
21.5
20.1
23.4
20.9
18.8
16.9
15.2
13.7
12.4
11.2
10.2
9.4
66.0 m B
oo
m L
eng
th
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonHL Mast point radius: 16 m
Unit: ton
46
Boom length m (ft) Boom arrangement
90 (295)
114 (374)
126 (413)
96 (315)
120 (394)
102 (335)
108 (354)
L 6.012.012.0 12.0 12.0 12.0 8T 5.0 6.0 6.0 12.0U
L 6.012.012.0 12.0 12.0 12.0 8T 5.0 6.0 12.0U
L 6.012.012.0 12.0 12.0 8T 5.0 6.0 6.0U
L 6.0 6.0 12.012.0 12.0 12.0 8T 5.0 6.0 12.0U
L 6.0 6.0 12.012.0 12.0 12.0 8T 5.0 6.0 6.0U
L 12.012.012.0 12.0 12.0 8T 5.0 6.0 6.0U
L 12.012.012.0 12.0 12.0 8T 5.0 6.0 12.0U
L 6.0 6.0 12.012.0 12.0 12.0 8T 5.0U
12.0
L 12.012.012.0 12.0 12.0 8T 5.0U
12.0
L 6.012.012.0 12.0 12.0 8T 5.0U
12.0
L 6.012.012.0 12.0 12.0 12.0 8T 5.0 12.012.0U
L 6.012.012.0 12.0 12.0 12.0 8T 5.0 6.0 12.0 12.0U
L 6.012.012.0 12.0 12.0 8T 5.0 6.0U
indicates the most flexible combination of insert long booms, which can be modified to form all shorter long boom arrangements.
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft) 5.0 m (16.4 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft) 8.0 m (26.2 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert Boom
Luffing Insert JibLuffing Insert JibLuffing Insert Jib
Luffing Top
6.0
12.0
8T
L
5.0
6.0
U
12.0
Boom length m (ft) Boom arrangement
36 (118)
42 (138)
48 (157)
54 (177)
60 (197)
72 (236)
84 (276)
66 (217)
78 (256)
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft)1.0 m (3.3 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert BoomBoom Top
indicates the most flexible combination of insert luffing booms, which can be modified to form all shorter luffing boom arrangements.6.0
12.0
8T
L
1UL 6.0 6.0 12.0 12.0 12.0 12.0 8T
1UL 6.0 6.0 12.0 12.0 12.0 8T
1UL 6.0 6.0 12.0 12.0 8T
1UL 12.012.0 12.0 8T
1UL 12.012.0 12.0 12.0 8T
1UL 12.012.0 12.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 8T
1UL 6.012.0 12.0 8T
1UL 12.0 12.0 8T
1UL 6.06.0 12.0 8T
1UL 6.0 12.0 8T
1U
Boom length m (ft) Boom arrangement
36 (118)
42 (138)
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft)1.0 m (3.3 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert BoomBoom Top
indicates the most flexible combination of insert heavy duty booms, which can be modified to form all shorter heav duty boom arrangements.
6.0
12.0
U
UL 6.0 6.012.0 8T
UL 6.0 12.0 8T
UL 12.0 12.0 8T
8T
L
Heavy Duty Crane Boom Arrangements
Luffing Boom Arrangements for Crane
Long Boom Arrangements
BOOM AND JIB ARRANGEMENTS
47
SUPER HEAVY LIFT
48
Boom length m (ft) Boom arrangement
66 (217)
72 (236)
78 (256)
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft)1.0 m (3.3 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert BoomBoom Top
mark shows the guy line installing position when the fixed jib is used. indicates the most flexible combination of insert luffing booms, which can be modified to form all shorter luffing boom arrangements.
6.0
12.0
8T
L
1UL 6.0 6.0 12.0 12.0 12.0 8T
1UL 12.012.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.0 12.0 8T
1UL 6.0 6.012.0 12.0 12.0 12.0 8T
1UL 12.0 12.0 12.0 12.0 12.0 8T
1U
Heavy Fixed Jib Boom Arrangements (Type B2)
Boom length m (ft) Boom arrangement
84 (276)
90 (296)
96 (316)
102 (336)
1UL 6.012.0 12.0 12.0 12.0 12.0 8T
1UL 6.0 6.012.0 12.0 12.0 12.0 12.0 8T
1UL 6.012.0 12.0 12.012.0 12.0 12.0 8T
1UL 6.0 6.012.0 12.0 12.012.0 12.0 12.0 8T
1UL 12.0 12.0 12.0 12.0 12.0 12.0 8T
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft)1.0 m (3.3 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert BoomBoom Top
6.0
12.0
8T
L
1U
mark shows the guy line installing position when the fixed jib is used.
indicates the most flexible combination of insert heavy duty booms, which can be modified to form all shorter hevy duty boom arrangements.
Heavy Fixed Jib Boom Arrangements (Type C)
Jib length m (ft) Jib arrangement
18 (59) JUJL
Symbol Jib Length10.0 m (32.8 ft) 8.0 m (26.2 ft)
RemarksJib BaseJib TopJU
JL
Heavy Fixed Jib Arrangements (Type B2)
Jib length m (ft) Jib arrangement
18 (59) JUJL
Symbol Jib Length10.0 m (32.8 ft) 8.0 m (26.2 ft)
RemarksJib BaseJib TopJU
JL
Heavy Fixed Jib Arrangements (Type C)
49
SUPER HEAVY LIFT
Jib length m (ft) Jib arrangement
24 (79)
30 (98)
36 (118)
48 (157)
60 (197)
72 (236)
84 (276)
42 (138)
54 (177)
66 (217)
78 (256)
Symbol Jib Length10.0 m (32.8 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft) 8.0 m (26.2 ft)
RemarksJib Base
Luffing Insert JibLuffing Insert Jib
Jib Top
indicates the most flexible combination of insert luffing jibs, which can be modified to form all shorter luffing jib arrangements.
6.0
JU
12.0
6.012.0 12.0 12.0 12.0 12.0JUJL
6.012.0 12.0 12.0 12.0JUJL
6.0 6.012.0 12.0 12.0JUJL
6.0 12.0 12.0 12.0JUJL
6.0 6.0 12.0 12.0JUJL
6.0 12.0 12.0JUJL
12.0 12.0JUJL
6.0 6.0 12.0JUJL
6.0 6.0JUJL
6.0JUJL
12.0JUJL
6.0 12.0JUJL
12.0 12.0 12.0 12.0JUJL
12.0 12.0 12.0JUJL
6.0 6.012.0 12.0 12.0 12.0JUJL
12.0 12.0 12.0 12.012.0JUJL
JL
Symbol Mast Length 9.0 m (29.5 ft)12.0 m (39.4 ft)10.0 m (32.8 ft)
RemarksMast BaseInsert MastMast Top
12.0
UM
ML
16.0 m52.5 ft
12.0
UM
ML
ML
12.0
UM
ML
12.0
UM
13.0 m42.7 ft
11.0 m36.3 ft
Luffing Jib Arrangements
SHL MAST
Boom length m (ft) Boom arrangement
36 (118)
42 (138)
48 (157)
54 (177)
60 (197)
72 (236)
84 (276)
78 (256)
66 (217)
LUL 6.012.0 12.0 12.0 12.0 8T
LUL 6.012.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 12.0 8T
LUL 6.0 6.0 12.0 12.0 8T
LUL 6.012.0 12.0 8T
LUL 6.06.0 12.0 8T
LUL 6.0 12.0 8T
LUL 12.0 12.0 8T
LUL 12.012.0 12.0 8T
LUL 12.012.0 12.0 12.0 8T
LUL 12.012.0 12.0 12.0 12.0 8T
LUL 6.012.0 12.0 12.0 12.0 12.0 8T
Symbol Boom Length 9.0 m (29.5 ft) 8.0 m (26.2 ft) 6.0 m (19.7 ft)12.0 m (39.4 ft)1.0 m (3.3 ft)
RemarksBoom Base
Tapered BoomInsert BoomInsert BoomBoom Top
indicates the most flexible combination of insert luffing booms, which can be modified to form all shorter luffing boom arrangements.
6.0
12.0
8T
L
LU
Luffing Boom Arrangements for Luffing
BOOM AND JIB ARRANGEMENTS
50
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚
42 m36 m
90
80
70
60
50
40
30
20
10
8070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Heavy Duty Crane Boom
WORKING RANGES
51
SUPER HEAVY LIFT
WORKING RANGES
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚
42 m
48 m
54 m
60 m
66 m
72 m
78 m
84 m
36 m
90
80
70
60
50
40
30
20
10
8070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Luffing Boom
52
80˚82˚ 70˚ 60˚ 50˚
40˚
30˚
90 m
96 m
102 m
108 m
114 m
120 m
126 m
130
120
110
100
90
80
70
60
50
40
30
20
10
110100908070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Long Boom
WORKING RANGES
53
SUPER HEAVY LIFT
80˚83˚
70˚
60˚
50˚
40˚
30˚
9070 80605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
H=2.86 m Without quick connection ringH=3.08 m With quick connection ring
90
100
110
80
70
60
50
40
30
20
10
78 m Boom + 18 m Jib
72 m Boom + 18 m Jib
66 m Boom + 18 m Jib
Heavy Fixed Jib (Type B2)
80˚83˚
70˚
60˚
50˚
40˚
30˚
70 80605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
H=2.86 m Without quick connection ringH=3.08 m With quick connection ring
90
100
110
120
130
80
70
60
50
40
30
20
10
102 m Boom + 18 m Jib
96 m Boom + 18 m Jib
90 m Boom + 18 m Jib
84 m Boom + 18 m Jib
Heavy Fixed Jib (Type C)
54
84 m
36 m
73˚
73˚
60˚
45˚
15˚
30˚
15˚24 m30 m
36 m42 m
48 m54 m
60 m66 m
72 m78 m
84 m
30 m36 m
42 m48 m
54 m60 m
66 m72 m
78 m84 m
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
100908070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Luffing JibBoom Angle: 86°
WORKING RANGES
55
SUPER HEAVY LIFT
84 m
36 m
63˚
63˚
60˚
45˚
15˚
30˚
15˚
24 m30 m
36 m42 m
48 m54 m
60 m66 m
72 m78 m
84 m
30 m36 m
42 m48 m
54 m60 m
66 m72 m
78 m84 m
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
110100908070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Luffing JibBoom Angle:76°
56
78 m
36 m
53˚
53˚
45˚
15˚
30˚
15˚
24 m30 m
36 m42 m
48 m54 m
60 m66 m
72 m78 m
84 m
30 m36 m
42 m48 m
54 m60 m
66 m72 m
78 m84 m
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
110 120100908070605040302010
Hei
gh
t ab
ove
gro
un
d (
m)
Radius from center of rotation (m)2.0 m
H
Center of rotation
*1: 2
.86
m*2
: 3.0
8 m
1: Without upper/lower connecting device2: With upper/lower connecting device
Luffing JibBoom Angle:66°
57
SUPER HEAVY LIFT
WORKING RANGES
58
Note: Designed and rated to comply with EN13000. Ratings shown in are determined by the strength of the boom or other structural components.
BoomLength
(m)WorkingRadius (m)
36.0 42.0
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
BoomLength (m) Working
Radius (m)
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
8.3 m/550.0544.9511.1428.0367.7321.8285.5255.6228.2205.8187.2170.5154.2139.6
33.8 m/127.4
44
9.2 m/523.4510.0427.0366.6320.8284.9255.9228.5206.0187.3171.4157.8146.0135.7126.3115.7
39.0 m/110.544
BoomLength
(m)WorkingRadius (m)
36.0 42.0
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
BoomLength (m) Working
Radius (m)
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
8.3 m/550.0544.9537.4461.6396.6347.3308.5277.3250.3225.9204.5184.3166.7151.0
33.8 m/137.7
44
9.2 m/526.0519.0460.5395.6346.3307.6276.4250.5226.0205.6188.4173.6160.7149.1136.6125.1
39.0 m/119.544
BoomLength
(m)WorkingRadius (m)
36.0 42.0
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
BoomLength (m) Working
Radius (m)
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.0
Reeves
8.3 m/550.0544.9537.4511.5439.6385.3342.4307.9279.5250.7224.9201.5178.8157.9
33.8 m/139.6
44
9.2 m/527.3519.9503.7438.8384.2341.4306.9278.5253.5230.9211.7195.2179.2164.0148.3132.8
39.0 m/124.844
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.
BoomLength
(m)WorkingRadius (m)
90.0 96.0 102.0 108.0
14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0 32.0 34.0 36.0 38.0 40.0 44.0 48.0 52.0 56.0 60.0 64.0 68.0 72.0 76.0 80.0 84.0 88.0 92.0 96.0100.0104.0108.0112.0
Reeves
BoomLength (m) Working
Radius (m)
14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0 32.0 34.0 36.0 38.0 40.0 44.0 48.0 52.0 56.0 60.0 64.0 68.0 72.0 76.0 80.0 84.0 88.0 92.0 96.0100.0104.0108.0112.0
Reeves
15.0 m/98.098.098.098.098.098.098.098.098.096.392.789.286.083.475.969.264.259.655.452.450.248.146.3
80.1 m/44.2
7
15.8 m/98.098.098.098.098.098.097.793.189.084.279.874.969.865.055.748.143.840.738.136.034.533.332.231.430.8
85.3 m/30.6
7
16.6 m/84.084.084.084.084.084.084.084.084.084.081.177.374.868.263.058.454.250.147.145.042.841.038.937.936.9
90.5 m/36.2
6
17.5 m /84.084.084.084.084.083.980.176.673.269.966.462.960.154.851.347.644.641.838.936.534.633.031.230.329.328.5
95.7 m/28.0
6
114.0
18.3 m /80.079.478.778.077.376.675.975.272.269.366.563.758.853.450.347.745.142.740.939.237.636.135.134.333.632.930.9
100.9 m/30.4
6
120.0
19.2 m /70.070.070.069.368.768.067.366.063.060.257.855.150.347.244.542.340.238.436.935.634.333.332.431.731.130.530.128.2
106.1 m/27.2
5
126.0
20.0 m /60.059.358.557.857.053.851.148.445.743.441.939.437.034.732.731.029.628.427.426.525.825.124.623.923.522.922.322.0
111.3 m/21.85
Long Boom Lifting Capacities
59
SUPER HEAVY LIFT
LIFTING CAPACITIESHeavy Duty Crane Boom Lifting Capacities
Counterweight: 180.0 tonCarbody weight: 50.0 tonPallet weight: 250.0 ton x 11 m
Unit: ton
Counterweight: 180.0 tonCarbody weight: 50.0 tonPallet weight: 250.0 ton x 13 m
Unit: ton
Counterweight: 180.0 tonCarbody weight: 50.0 tonPallet weight: 250.0 ton x 16 m
Unit: ton
Counterweight: 180.0 ton, Carbody weight: 50.0 tonPallet weight: 250.0 ton x 11 m, 13 m, 16 m
Unit: ton
60
Note: Designed and rated to comply with EN13000. Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
BoomLength
(m)WorkingRadius (m)
72.0 78.066.0
18.0
20.022.024.026.028.030.034.038.042.046.050.054.058.062.066.070.074.0
Reeves
BoomLength (m) Working
Radius (m)
20.022.024.026.028.030.034.038.042.046.050.054.058.062.066.070.074.0
Reeves
120.0116.4103.1 92.0 82.7 74.6 61.6 51.5 43.5 36.9 31.4 26.8 22.8 19.4 16.5 13.9 11.6
10
120.0114.0102.2 91.1 81.7 73.6 60.6 50.4 42.3 35.7 30.2 25.6 21.6 18.2 15.2 12.6 10.3
10
120.0108.6 97.7 88.3 80.1 72.6 59.4 49.2 41.1 34.4 28.9 24.2 20.3 16.8 13.8 11.2 8.9
10
Jib Length (m) Jib Length (m)
Heavy Fixed Jib (Type B2) Lifting Capacities Heavy Lift Mast Point Radius: 11 m
Counterweight: 200.0 tonCarbody weight: 50.0 tonPallet weight: 10.0 ton x 11 m
Unit: ton
Note: Designed and rated to comply with EN13000. Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
BoomLength
(m)WorkingRadius (m)
84.0 90.0 96.0 102.0
18.0
22.024.026.028.030.034.038.042.046.050.054.058.062.066.070.074.078.082.086.0
Reeves
BoomLength (m) Working
Radius (m)
22.024.026.028.030.034.038.042.046.050.054.058.062.066.070.074.078.082.086.0
Reeves
105.0105.0105.0105.0105.0 96.7 82.2 70.6 61.2 53.3 46.6 40.9 36.0 31.7 27.9 24.6 21.6 18.9
84.0 m/17.78
95.095.095.095.095.081.269.560.052.145.439.734.830.526.723.320.317.6
84.0 m/16.48
85.085.085.085.085.080.068.358.850.844.138.433.429.125.321.918.916.2
84.0 m/15.08
80.080.080.080.078.867.157.649.642.937.132.127.824.020.617.614.8
84.0 m/13.68
Jib Length (m) Jib Length (m)
Heavy Fixed Jib (Type C) Lifting Capacities
Counterweight: 200.0 tonCarbody weight: 50.0 tonPallet weight: 130.0 ton x 11 m
Unit: ton
BoomLength
(m)WorkingRadius (m)
36.0
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.042.044.046.048.050.052.054.056.0
Reeves
BoomLength (m) Working
Radius (m)
8.0 9.010.012.014.016.018.020.022.024.026.028.030.032.034.036.038.040.042.044.046.048.050.052.054.056.0
Reeves
8.5 m/300.0300.0300.0300.0300.0300.0283.9253.4226.0203.6185.0168.6152.2137.6
33.9 m/124.8
24
9.3 m/300.0300.0300.0300.0300.0282.9253.8226.3203.8185.1169.2155.6143.8133.5124.2113.6
39.1 m/107.9
24
10.2 m/300.0300.0300.0300.0281.9252.9226.3203.7184.9169.0155.4143.6133.2124.1116.0108.7102.1 95.5
44.3 m/94.2
24
8.5 m/300.0300.0300.0300.0300.0300.0300.0275.4248.1223.7202.5182.3164.7149.0
33.9 m/135.1
24
9.3 m/300.0300.0300.0300.0300.0300.0274.4248.3223.8203.4186.2171.4158.5147.1134.5123.0
39.1 m/116.9
24
10.2 m/300.0300.0300.0300.0300.0273.4247.7223.6203.2185.9171.1158.2147.0137.1128.2120.3112.4103.6
44.3 m/102.2
24
8.5 m/300.0300.0300.0300.0300.0300.0300.0300.0277.5248.9223.0199.8177.0156.1
33.9 m/136.8
24
9.3 m/300.0300.0300.0300.0300.0300.0300.0276.6251.3228.6209.5193.0177.2161.9146.4130.7
39.1 m/122.1
24
10.2 m/300.0300.0300.0300.0300.0300.0275.6251.0228.3209.1192.6178.4165.9154.9145.1134.3123.2111.0
44.3 m/109.1
24
11.0 m/280.0280.0280.0280.0280.0251.7225.8203.2184.4168.4154.8142.9132.6123.4115.3108.0101.4 95.5 90.1 85.2
49.5 m/81.7
20
11.0 m/280.0280.0280.0280.0280.0272.2246.5223.1202.6185.2170.4157.5146.3136.3127.5119.6112.4106.0100.1 94.7
49.5 m/89.7
20
11.0 m/280.0280.0280.0280.0280.0280.0274.4250.2227.5208.3191.9177.6165.1154.1144.3135.5127.6120.4113.1104.6
49.5 m/97.3
20
11.8 m/280.0280.0280.0280.0279.7250.7225.6203.0184.1168.1154.4142.5132.1123.0114.8107.5101.0 95.0 89.6 84.7 80.2 76.0 72.1
54.7 m/70.820
11.8 m/280.0280.0280.0280.0280.0271.3245.6222.7202.2184.8170.0157.1145.8135.8127.0119.1112.0105.5 99.6 94.3 89.4 84.8 80.6
54.7 m/79.220
11.8 m/280.0280.0280.0280.0280.0280.0273.5249.7227.1207.8191.3177.0164.5153.5143.7134.9127.0119.9113.4107.4102.0 96.9 90.0
54.7 m/87.220
Palette weight13 m 16 m11 m
42.0Palette weight
13 m 16 m11 m
48.0Palette weight
13 m 16 m11 m
54.0Palette weight
13 m 16 m11 m
60.0Palette weight
13 m 16 m11 m
BoomLength
(m)WorkingRadius (m)
66.0
12.014.016.018.020.022.024.026.028.030.032.034.036.038.040.042.044.046.048.050.052.054.056.058.060.062.064.066.068.070.072.074.076.0
Reeves
BoomLength (m) Working
Radius (m)
12.014.016.018.020.022.024.026.028.030.032.034.036.038.040.042.044.046.048.050.052.054.056.058.060.062.064.066.068.070.072.074.076.0
Reeves
12.7 m/280.0280.0280.0278.4249.4224.9202.2183.3167.2153.5141.6131.2122.0113.9106.6100.0 94.1 88.7 83.8 79.2 75.1 71.2 67.6 64.3
59.9 m/61.4
20
13.5 m/252.0252.0252.0252.0248.1224.1201.4182.4166.3152.6140.7130.2121.1112.9105.6 99.0 93.1 87.6 82.7 78.2 74.0 70.2 66.6 63.3 60.2 57.3 54.6
65.1 m/53.2
20
14.3 m/213.5213.5213.5213.5213.5200.8181.7165.7151.9140.0129.5120.3112.1104.8 98.2 92.3 86.9 81.9 77.4 73.2 69.4 65.8 62.5 59.4 56.5 53.8 51.3 48.9 46.7
70.3 m/46.4
16
12.7 m/280.0280.0280.0280.0269.9244.3221.9201.3184.0169.1156.1144.9134.9126.0118.1111.0104.5 98.7 93.3 88.4 83.9 79.7 75.8 72.2
59.9 m/69.0
20
13.5 m/252.0252.0252.0252.0252.0243.0221.0200.4183.0168.1155.1143.8133.9125.0117.1109.9103.5 97.6 92.2 87.3 82.8 78.6 74.7 71.1 67.8 64.7 61.7
65.1 m/60.2
20
14.3 m/213.5213.5213.5213.5213.5213.5199.7182.3167.3154.4143.1133.1124.2116.3109.1102.7 96.8 91.4 86.5 82.0 77.8 73.9 70.3 67.0 63.9 60.9 58.2 55.6 53.2
70.3 m/52.8
16
12.7 m/280.0280.0280.0280.0280.0272.2248.4226.1206.8190.3176.0163.5152.5142.7133.9126.0118.8112.3106.4100.9 95.9 91.3 87.0 83.0
59.9 m/77.8
20
13.5 m/252.0252.0252.0252.0252.0252.0247.1225.1205.8189.3175.0162.5151.4141.6132.8124.9117.7111.2105.3 99.8 94.8 90.2 85.9 81.9 78.2 74.7 71.5
65.1 m/69.4
20
14.3 m/213.5213.5213.5213.5213.5213.5213.5205.0188.5174.2161.6150.6140.8132.0124.0116.9110.4104.4 99.0 94.0 89.3 85.1 81.1 77.4 73.9 70.7 67.6 64.7 62.0
70.3 m/61.7
16
15.2 m/182.8182.8182.8182.8182.8182.8180.8164.7150.9138.9128.5119.2111.0103.7 97.1 91.2 85.7 80.8 76.3 72.1 68.2 64.7 61.4 58.3 55.4 52.7 50.2 47.8 45.6 43.4 41.4
75.5 m/40.016
15.2 m/182.8182.8182.8182.8182.8182.8182.8181.2166.3153.3142.0132.0123.1115.1108.0101.5 95.6 90.3 85.3 80.8 76.6 72.8 69.2 65.8 62.7 59.8 57.0 54.4 52.0 49.7 47.6
75.5 m/46.016
15.2 m/182.8182.8182.8182.8182.8182.8182.8182.8182.5173.0160.5149.4139.6130.8122.9115.7109.2103.3 97.8 92.8 88.2 83.9 79.9 76.2 72.7 69.5 66.4 63.6 60.9 58.3 55.9
75.5 m/54.216
Palette weight13 m 16 m11 m
72.0Palette weight
13 m 16 m11 m
78.0Palette weight
13 m 16 m11 m
84.0Palette weight
13 m 16 m11 m
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Boom Lifting CapacitiesCounterweight: 180.0 ton, Carbody weight: 50.0 tonPallet weight: 250.0 ton x 13 m
Unit: tonLIFTING CAPACITIES
61
SUPER HEAVY LIFT
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
36.0
Reeves 16 12 8 8 8 8
14.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
14.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
14.4 m/200.0
193.2
181.9
175.5
169.5
163.4
158.1
155.5
145.9
129.4
98.3
154.6
149.5
143.8
125.2
105.7
94.6
139.6
133.8
126.8
120.7
115.5
111.2
104.4
89.9
78.0
64.8
105.8
101.8
95.6
86.7
78.8
82.3
74.8
68.4
63.0
101.5
99.3
97.1
94.4
88.2
81.9
75.6
69.4
63.7
56.8
45.3
78.9
78.9
76.1
70.4
64.7
58.5
66.5
61.1
56.4
52.3
48.7
76.0
74.1
72.1
69.5
65.6
61.7
58.1
53.9
48.0
42.9
38.4
32.1
68.8
68.8
67.7
59.8
53.2
47.6
42.7
38.3
53.3
50.0
46.4
43.2
40.4
37.5
54.8
53.1
51.2
49.0
46.6
44.6
42.2
39.7
37.4
35.1
31.6
28.5
23.5
52.0
50.0
46.8
44.0
41.4
39.1
37.0
34.9
31.5
28.5
39.0
39.0
38.6
36.0
33.7
30.8
27.8
48.4
47.2
45.8
42.7
39.7
37.0
34.5
32.3
30.3
28.5
26.8
25.3
22.8
19.1
39.9
38.3
35.9
33.6
31.6
29.7
28.1
26.5
25.1
23.8
22.6
31.9
31.0
29.3
27.7
26.3
24.9
23.8
36.0 m B
oo
m L
eng
th
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
42.0
Reeves 16 12 8 8 8 8
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
15.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
15.4 m/190.6
187.1
181.8
177.2
169.7
164.4
158.2
146.3
132.6
108.4
153.0
141.7
123.3
109.0 102.9
92.1
127.7
122.6
117.2
111.8
106.2
95.3
85.2
76.4
67.6
102.4
94.5
85.3
77.5
70.9
72.6
66.4
61.1
56.5
94.1
93.1
90.6
87.7
81.5
75.1
68.8
62.9
57.5
52.6
47.2
84.5
83.4
75.7
69.1
63.5
58.7
51.6
59.2
54.6
50.6
47.1
44.0
74.9
73.6
70.4
66.7
62.8
58.9
54.9
51.1
47.5
43.2
38.7
33.5
72.9
72.9
66.9
61.3
54.9
49.0
43.9
39.4
35.3
52.2
48.2
44.7
41.6
38.9
36.4
52.0
50.2
48.1
45.8
43.1
41.1
38.8
36.5
34.3
32.2
30.3
28.5
24.7
49.7
47.9
44.9
42.3
39.9
37.7
35.7
32.6
29.5
26.5
42.8
39.8
37.0
34.6
32.3
30.3
28.4
46.2
44.9
43.3
41.6
39.7
37.2
34.7
32.5
30.4
28.6
26.9
25.3
21.5
17.6
41.6
39.8
37.1
34.7
32.6
30.6
28.8
27.2
25.7
24.3
23.1
33.1
32.1
30.3
28.6
27.1
25.7
24.4
23.3
42.0 m B
oo
m L
eng
th
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonPallet weight: 130.0 ton x 16 m
Unit: ton
62
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
48.0
Reeves 16 12 8 8 8 8
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
16.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
16.2 m/190.8
186.6
181.8
174.2
165.1
152.8
141.6
131.6
117.7
150.5
139.4
121.3
107.2
89.4
80.8
119.4
114.7
109.7
104.5
99.4
89.4
80.1
71.9
64.9
104.0
92.8
83.7
76.1
69.6
70.2
64.2
59.1
54.7
90.2
88.0
85.4
82.7
76.9
70.8
64.9
59.3
54.3
49.7
45.8
88.9
81.8
74.2
67.8
62.3
57.5
53.4
57.1
52.7
48.8
45.4
42.4
67.3
66.0
62.9
59.5
55.8
52.0
48.4
44.6
41.7
38.8
36.1
33.8
70.5
65.5
60.0
55.3
51.1
45.9
41.2
36.9
46.3
43.0
40.0
37.3
34.9
32.7
49.7
47.9
45.8
43.6
41.3
39.0
36.7
34.5
32.4
30.4
28.6
26.9
24.6
50.9
49.0
45.9
43.1
40.6
38.4
36.3
33.7
30.5
27.5
38.1
35.4
33.0
30.8
28.9
27.1
25.4
44.1
42.8
41.3
39.6
37.6
36.0
34.1
32.3
30.5
28.7
27.0
24.7
20.1
16.1
39.0
37.5
35.1
32.9
31.0
29.1
27.5
26.0
24.6
23.3
32.2
31.3
29.5
27.9
26.2
24.6
23.1
48.0 m B
oo
m L
eng
th
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
54.0
Reeves 16 8 8 8 8 8
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
191.0
179.8
167.2
155.0
143.6
133.0
123.6
115.5 136.7
118.9
105.1
86.4
78.0
110.4
105.9
101.2
96.3
91.5
82.1
73.5
65.9
59.4
101.8
90.9
81.9
74.4
68.1
62.7
61.8
56.8
52.5
48.7
80.7
78.2
75.6
69.9
64.2
58.7
53.6
48.9
44.8
41.2
79.9
72.5
66.2
60.9
56.2
52.1
50.5
46.7
43.4
40.5
37.9
63.1
61.8
58.7
55.2
51.6
48.0
44.5
41.2
38.2
35.4
32.9
30.7
67.1
63.9
58.5
53.9
49.8
46.3
42.3
37.9
40.9
38.1
35.5
33.2
31.1
29.1
46.9
45.1
42.9
40.7
38.4
36.1
33.9
31.7
29.7
27.8
26.1
24.5
23.0
50.6
49.9
46.9
44.0
41.4
39.1
37.0
34.9
31.5
28.5
36.1
33.5
31.2
29.2
27.3
25.5
24.0
22.5
42.0
40.6
39.0
37.3
35.4
33.6
31.7
29.9
28.1
26.5
24.9
23.3
18.6
14.6
40.0
38.4
35.9
33.6
31.6
29.7
28.0
26.5
25.0
23.7
19.2
32.6
30.3
28.3
26.4
24.7
23.1
21.7
20.3
54.0 m B
oo
m L
eng
th
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonPallet weight: 130.0 ton x 16 m
Unit: ton
63
SUPER HEAVY LIFT
LIFTING CAPACITIES
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
60.0
Reeves 12 8 8 8 8 8
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
17.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
17.8 m/162.3
161.4
150.8
140.5
130.7
121.7
113.5
106.4
116.7
103.1
92.3
75.3
68.6
103.2
99.1
94.8
90.4
86.0
77.4
69.5
62.5
56.6
89.0
80.2
72.9
66.7
61.4 54.6
50.4
46.8
76.5
74.2
71.7
66.4
61.0
55.9
51.1
46.7
42.8
39.5
78.2
70.9
64.7
59.5
54.9
50.9
47.4
48.3
44.7
41.6
38.7
36.2
58.2
55.3
52.1
48.7
45.3
42.0
38.9
36.1
33.5
31.1
29.1
63.5
61.9
57.1
52.5
48.6
45.1
42.0
39.2
35.2
39.0
36.2
33.7
31.5
29.5
27.6
44.5
42.7
40.7
38.5
36.3
34.0
32.0
30.0
28.1
26.3
24.7
23.2
21.4
47.6
46.3
44.9
42.2
39.8
37.4
34.9
32.6
29.5
26.3
31.7
29.5
27.5
25.7
24.1
22.5
21.1
40.0
38.6
37.1
35.4
33.6
31.9
30.1
28.3
26.6
25.1
23.6
21.8
17.1
13.1
41.6
39.8
37.1
34.7
32.5
30.5
28.7
27.1
25.6
24.2
19.3
28.6
26.5
24.8
23.2
21.7
20.3
19.0
17.8
60.0 m B
oo
m L
eng
th
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
66.0
Reeves 12 8 8 8 8 8
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
18.5 m/144.7
137.9
128.7
120.0
111.9
104.5
98.0
114.0
100.7
90.1
65.6
60.2
95.3
91.5
87.5
83.3
79.2
71.4
64.1
57.7
52.3
86.8
78.2
71.0
64.9
59.8 52.0
48.0
44.5
41.4
71.3
68.1
66.6
61.6
56.6
51.7
47.3
43.2
39.6
36.5
76.1
69.0
63.0
57.8
53.4
49.5
46.0
42.4
39.3
36.6
34.2
32.1
55.1
52.2
49.0
45.7
42.4
39.3
36.4
33.7
31.2
29.1
27.1
59.1
55.4
51.0
47.1
43.7
40.6
37.9
35.5
34.1
31.7
29.6
27.6
25.9
24.3
41.9
40.1
38.1
36.0
33.8
31.7
29.7
27.7
25.9
24.2
22.7
21.4
19.6
45.1
44.0
42.5
41.7
38.8
36.1
33.7
31.5
29.5
26.2
27.5
25.6
23.9
22.3
20.9
19.5
18.3
35.9
34.4
32.7
31.0
29.3
27.5
25.9
24.3
22.8
21.4
20.1
15.6
11.6
8.3
39.1
37.6
35.1
32.9
30.9
29.1
27.5
25.9
24.5
19.1
24.7
23.0
21.4
20.0
18.7
17.4
16.3
66.0 m B
oo
m L
eng
th
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonPallet weight: 130.0 ton x 16 m
Unit: ton
64
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
72.0
Reeves 12 8 8 8 8 8
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
114.0
18.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
114.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
24.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
19.2 m/130.3
127.2
119.3
111.7
104.5
98.0
92.2
111.2
98.2
87.9
62.5
57.3
84.5
80.9
77.3
73.6
66.6
60.1
54.3
49.3
45.4
84.4
76.0
69.0
63.1
58.1
53.7 45.4
42.1
39.1
36.5
66.6
64.6
62.4
57.8
53.2
48.8
44.7
40.9
37.6
34.7
67.0
61.1
56.1
51.8
47.9
44.6
41.6
37.0
34.4
32.1
30.1
28.2
51.2
48.5
45.6
42.5
39.5
36.7
34.0
31.6
29.2
27.2
25.5
54.9
51.3
49.3
45.5
42.2
39.3
36.6
34.2
29.5
27.5
25.7
24.0
22.5
39.5
37.8
35.9
33.9
31.9
29.9
28.0
26.2
24.5
22.9
21.5
20.2
17.6
42.7
41.8
40.4
39.7
37.4
34.8
32.4
30.3
28.3
25.6
25.5
23.6
22.0
20.5
19.1
17.9
16.7
33.8
32.4
30.8
29.2
27.4
25.9
24.3
22.9
21.5
19.9
18.3
13.9
10.0
37.0
36.2
35.8
33.7
31.6
29.7
28.0
26.4
24.8
18.7
13.1
22.7
21.1
19.6
18.2
17.0
15.8
14.7
13.7
72.0 m B
oo
m L
eng
th
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
78.0
Reeves 8 8 8 8 8 8
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
114.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
102.0
106.0
110.0
114.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
30.0 42.0 54.0 66.0 78.0 84.0Jib length (m) Jib length (m)
20.6 m/102.8
99.2
93.8
88.5
83.4
78.6
69.5
59.8 94.5
84.4
74.2
64.2
48.9
45.2
77.9
74.7
71.3
68.0
61.6
55.6
50.4
45.8
42.2
73.9
66.6
59.1
52.6
46.6 42.8
39.7
36.9
34.4
59.4
57.4
53.1
48.9
44.8
41.1
37.7
34.6
32.0
29.9
64.9
59.2
53.2
47.9
43.2
39.0
35.0
34.7
32.3
30.1
28.1
26.4
47.7
45.1
42.4
39.5
36.7
34.0
31.5
29.0
27.1
25.2
23.6
51.3
49.7
47.4
44.0
40.8
37.9
35.3
33.0
30.9
27.4
25.5
23.8
22.2
20.7
19.4
37.0
35.3
33.5
31.6
29.7
27.8
26.0
24.3
22.7
21.2
19.9
18.7
15.6
39.5
38.2
36.7
35.9
33.5
31.2
29.1
27.2
24.5
18.7
21.7
20.1
18.7
17.4
16.2
15.1
14.1
31.6
30.2
28.6
27.1
25.5
24.0
22.5
21.1
19.8
18.6
16.3
12.1
8.4
34.9
34.2
33.7
32.6
31.3
29.9
28.4
27.0
23.6
17.9
12.6
19.3
19.2
17.8
16.5
15.3
14.2
13.2
78.0 m B
oo
m L
eng
th
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonPallet weight: 130.0 ton x 16 m
Unit: tonLIFTING CAPACITIES
65
SUPER HEAVY LIFT
86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66° 86° 76° 66°
84.0
Reeves 8 8 8 8 8 8
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
20.0
22.0
24.0
26.0
28.0
30.0
34.0
38.0
42.0
46.0
50.0
54.0
58.0
62.0
66.0
70.0
74.0
78.0
82.0
86.0
90.0
94.0
98.0
Reeves
Wo
rkin
g R
adiu
s (m
) Wo
rking
Rad
ius (m
)
Boom angle
Boom length (m)
Boom angle
Boom length (m)
30.0 42.0 54.0 66.0 72.0 78.0Jib length (m) Jib length (m)
21.4 m/92.8
90.8
83.7
77.4
71.7
66.6
57.6
49.6
73.6
63.6
55.1
47.2
75.6
72.6
69.5
65.9
58.8
51.9
45.9
40.7
35.8
64.0
56.3
49.8
44.2
39.2
55.5
53.7
49.9
46.0
42.3
38.9
35.7
32.9
29.5
26.2
55.5
49.4
44.2
39.7
35.7
32.1
28.8
40.9
38.4
35.9
33.4
31.0
28.8
26.7
24.8
23.2
21.7
20.5
45.2
43.2
40.9
38.4
36.0
33.5
29.6
25.6
38.2
36.2
34.1
31.9
29.8
27.8
25.9
24.1
22.5
21.0
19.8
18.7
42.0
40.5
39.1
37.2
35.2
33.0
30.6
27.1
23.7
20.0
34.0
32.5
30.8
29.0
27.3
25.5
23.9
22.4
20.9
19.6
18.4
17.3
13.5
36.3
35.3
33.9
33.1
31.6
29.8
27.8
24.8
21.8
17.7
84.0 m B
oo
m L
eng
th
Note: Designed and rated to comply with EN13000.Ratings shown in are determined by the strength of the boom or other structural components.Ratings enclosed in gray-color box in the table require double-drum specifications.
Luffing Jib Lifting CapacityCounterweight: 180.0 ton, Carbody weight: 50.0 tonPallet weight: 130.0 ton x 16 m
Unit: ton
66
67
TRANSPORTATION PLAN
Base machine with mast and lower translifter without upper/lower connecting devices.
Base machine (1)
Base machine (2)
WeightWidthHeight(Machine)Length
64,000 kg 3.0 m 3.4 m
14.25 m
Base Machine
Upper Structure (1)
Upper Structure (2)
WeightWidthHeight(Machine)Length
45,300 kg 3.0 m 2.37 m
14.25 m
Upper structure with mast and upper connecting devices.
Base machine with lower translifter without upper/lower connecting devicesand mast.
Upper structure and upper connecting devices without mast.
Upper Structure
Upper translifter: 2,400 kgLower translifter: 2,300 kgUpper connecting device: 900 kgLower connecting device: 2,500 kg
Attachments
WeightWidthHeight(Machine)Length
51,500 kg 3.0 m 3.4 m
11.67 m
WeightWidthHeight(Machine)Length
32,000 kg 3.0 m 2.37 m
11.67 m
WeightWidthHeight(Boom)
29,300 kg 3.0 m 2.9 m
With 1 x 12 m insert boom 1 x 12 m insert jib2 x counterweights
68
69
PARTS AND ATTACHMENTS
70
Bulletin No. SL6000-2SPEC-EU3 100301IF Printed in Japan
HYDRAULIC CRAWLER CRANE
KOBELCO is the corporate mark used by Kobe Steel on a variety of productsand in the names of a number of Kobe Steel Group companies.
Note: Standard equipment may vary depending on your areas or countries.Due to our policy of continual product improvements all designs and specifications are subject to change without advance notice.Copyright by KOBELCO CRANES CO., LTD. No part of this catalog may be reproduced in any manner without notice.
Inquiries To:17-1, Higashigotanda 2-chome, Shinagawa-ku, Tokyo 141-8626 JAPANTel: +81-3-5789-2130 Fax: +81-3-5789-3372URL: http://www.kobelco-cranes.com/