Transcript

IGS-803SM-8PH24 ERPS Test Case

Figure 1

1. Prepare connects as in the above case, but leave unconnected Switch 1 and 2 to avoid loop.

2. Please Spanning tree Disable.

3. For all switches 1~10, set fiber ports 1&2 to C-Port.

Switch 1 MEP::::

Instance 1:

Instance 2:

Switch2 MEP

Instance 1:

Instance 2:

Switch3 MEP

Instance 1:

Instance 2:

Switch4 MEP

Instance 1:

Instance 2:

Switch5 MEP

Instance 1:

Instance 2:

Switch6 MEP

Instance 1:

Instance 2:

Switch7 MEP

Instance 1:

Instance 2:

Switch8 MEP

Instance 1:

Instance 2:

Switch9 MEP

Instance 1:

Instance 2:

Switch10 MEP

Instance 1:

Instance 2:

Switch 1 ERPS Setting

Switch 2 ERPS Setting

Switch 3 ~ 10 ERPS Setting


Top Related