Transcript
IGS-803SM-8PH24 ERPS Test Case
Figure 1
1. Prepare connects as in the above case, but leave unconnected Switch 1 and 2 to avoid loop.
2. Please Spanning tree Disable.
3. For all switches 1~10, set fiber ports 1&2 to C-Port.
IGS-803SM-8PH24 ERPS Test Case
Figure 1
1. Prepare connects as in the above case, but leave unconnected Switch 1 and 2 to avoid loop.
2. Please Spanning tree Disable.
3. For all switches 1~10, set fiber ports 1&2 to C-Port.