Page 1: Implementing Innovative Process Improvement & Lean Practices

Implementing Innovative Process Improvement & Lean

Practices

January 23, 2014

Page 2: Implementing Innovative Process Improvement & Lean Practices

Agenda

1. Introduction: Challenges facing the Public Sector

2. Laying the groundwork for a successful implementation

3. Developing well defined goals & objectives

4. Team Selection

5. Getting organizational buy-in

Page 3: Implementing Innovative Process Improvement & Lean Practices

1. Introduction: Challenges facing the Public Sector

Public organizations face at least five key challenges:

1. Creating a truly transformational government 2. Meeting heightened constituent expectations3. Managing workforce transitions4. Minimizing the risks of implementing new technologies, and,5. Monetary issues, which are much more of operating realities

that color all decisions, are the fifth challenge.

Lean manufacturing processes have emerged as a means to help break the politicized cycle and short term pressures

Page 4: Implementing Innovative Process Improvement & Lean Practices

2. Laying the Groundwork

LEAN THINKINGThe relentless effort to systematically reduce waste while improving the flow of value to the customer”

•Focused on eliminating waste•Provides principles, for improving work•Provides levers to drive system improvements

Page 5: Implementing Innovative Process Improvement & Lean Practices

2. Laying the Groundwork - The Six Overarching Principles & Practices:

Partnership between supplier and producer• Fewer, better managed

suppliers• Quality at the source• Shared destiny

relationships• Supplier development

LEAN WORK METHODS Tactical shop-floor policies used to implement Lean

• Service oriented production• Standard work• Visual control• Good housekeeping/5S • Set-up time reduction• Total Preventive Maintenance

• Education and development

• Flat organizations• Decentralized

management

ORGANIZATION & CULTUREProgressive employee relations and change leadership

• Workplace safety • Multi-skilled, flexible

workforce• Worker job security• Improvement incentives

• U-shaped lines• Autonomation• Line stops and andons• Error proofing

PULL Everything produced at the rate of production of the final

product -- “pull” production control• Just-In-Time production and delivery • Linked production at Takt time• Kanbans• Level scheduling• Machines available on demand

PURSUING PERFECTIONContinuous improvement attitude and empowerment

• Kaizen events and continuous improvement • Self-inspected quality, not inspected in quality • Process ownership and responsibility• Advanced quality concepts and measures

– Hardware Variability Control (HVC)– Statistical Process Control (SPC)

SOURCING & SUPPLIER INTEGRATION

FLOW Maximizing value by producing only what is desired in the

shortest time possible with the least resources• Single piece flow• Physically and visually linked operations• Consolidated operations• Simplified and standardized processes

Some lean operations principles and tools may not apply, but the methodology will identify and help you to eliminate waste, thereby making your value streams leaner

Page 6: Implementing Innovative Process Improvement & Lean Practices

2. Laying the Groundwork

However, adopting Lean means getting past some of the misunderstandings and misperceptions surrounding Lean:• “Another management fad that will disappear within a year”• “Cost cutting”• “Headcount reduction” • “Won’t work in my area” e.g. Engineering department

Page 7: Implementing Innovative Process Improvement & Lean Practices

2. Laying the Groundwork

The Benefits of Lean• The percentage of patients being met within the target of 62 days rose from

around 40% to 75-80%.• A reduction in the average time to first appointment from 23 to 12 days.• The average time taken for processing a planning application was reduced from 5

days to 2 days.• A reduction in flow time of patients of 48%.• More calls answered at first attempt (30% - 85%)• More queries answered without the need for passing the customer to another

department• Cutting end-to-end time for adaptations to housing for disabled people from over

200 days to 12 days.• Reducing payroll errors from 75% to 2%.• Reducing backlogs in lost and found departments by 80%.• Reducing the time taken in report preparation in the Justice system from 77 to 6

days.Source: International Public Sector Research & Case studies

Page 8: Implementing Innovative Process Improvement & Lean Practices

3. Developing well-defined Goals & Objectives: Setting the Stage

1. What is the overall business challenge? What problems does the business need to resolve?

2. What is the local problem you’re trying to resolve?

3. How will you measure this problem?

4. Did the solution work or not?

Page 9: Implementing Innovative Process Improvement & Lean Practices

3. Developing Well-defined Goals & Objectives - Current State:

• Managers count the “value added” by an organization

• “Value added is the cost of inputs from outside the organization subtracted from the selling price (or fees, tax collected, costs recovered) of an organization’s products and services.

• But much of the “value” being added is actually waste: Rework, excess handling, excess processing, wait time, inventories (to be picked up, put down and stored), etc.

Page 10: Implementing Innovative Process Improvement & Lean Practices

3. Developing Well-defined Goals & Objectives – Future State:• We want to increase value and minimize waste, so what can

managers and finance people do to count value and waste separately and more usefully?

• For a start, perhaps we can all start by talking about “value created”– the useful activities in organizations from the standpoint of their customers- instead of “value added” – which is the cost (including waste) plus recoveries and margins added by the provider.

• What managers need and want is a way to think about the future so a business can be managed & improved.

• This can only be done by creating, sustaining and improving better processes that engage the people actually creating value

Page 11: Implementing Innovative Process Improvement & Lean Practices

Starts with an assessment of current performance – where are we now?

Seven Deadly WastesTIMWOOD

Transportation

Inventory

Motion

Waiting

Over-Production

Over-Processing

Defects

e.g. Fire Inspection Services“Violation Orders”

Searching for information

Defects/Rework

Approval Wait Time

Meetings & Conference

Calls

Value-Added ~35%

Other

3. Developing Well-defined Goals & Objectives - Current State:

Page 12: Implementing Innovative Process Improvement & Lean Practices

3. Developing Well-defined Goals & Objectives: Current State

Mechanic:

Electrician:

Operator:

• Client sets the expectation on how much of the gap they want to close

• Bench mark against “best in class”

KCB’s experience is that clients can recover a minimum of 50% of theNon Value Add activity

Opportunity

Opportunity

12

Facilities Management Services e.g.

Page 13: Implementing Innovative Process Improvement & Lean Practices

3. Developing Well-defined Goals & Objectives: Current State Supervisory Study - Facilities Management ServicesTypical “Day-in-the-Life

13

Page 14: Implementing Innovative Process Improvement & Lean Practices

Intra-site FlowInformation Flow

Inter-site FlowDenotes site changeDenotes building change

Intra-site FlowInformation Flow

Inter-site FlowIntra-site FlowInformation Flow

Inter-site FlowDenotes site changeDenotes building change

Sample Part: XXX

Transactional StatisticsTotal Systems Employed: 19Total Info Transactions: 399- Manual Trans: 277- Systems-based Trans: 122

Information Pathway Distance- Inter-site: 4,105 miles- Intra-site: 44,960 feet- Time Variation: 3 hours

DM

Program Off ice

Eng-Design

Drafter-CentaurDrafter-Booster

Eng-StructuresEng-Av ionics

Eng-Fluids

Eng-Checking

Eng-Mission Int

Eng-Sof tware

Supplier Data

Eng-Chief

Conf iguration Management

Admin

Saf ety

Eng-Sy stems

Model Control

ReleaseMission Success

Order Control

Quality

Contracts

Subcontract-AdminMaterial

Planning0

Eng-Production

Process Planning

Eng-QA

Asset SpecialistsPrint Crib

Machinist-Tool

Eng-Mechanical

Eng-Test

Production Planning

Product AssuranceReproduction

Repro-Data Entry

Repro-Lead

Reproduction-Photographer

Repro-Copy

Repro-Distribution

Receiv ing

Receiv ing-Asset Specialist

Receiv ing-Data

Receiv ingQuality Inspection

Truck Driv er

Mission Integration

Cape Receiv ing

Eutelsat

Purchasing-Planning

Buy er-Labarge Eng-Labarge

CSC HarlingenCODS EDE

ProE

TRMS

CODSProE

CODS

CODSCVSPADR

CODSProE

ProEPADR

TSOCODSPADR

Support

Support

Support

MACPAC

MPPS

Support

CODS

MACPAC

CODS

MPPS

PADRCODS

ELC

MPPS

CVS

FMP

MACPAC

PIRSPODS

KSAEMAS

Ref lections

CADS

CADS

CADS

Support

Support

Support

Support

MACPAC

Liv eLink

TSO ELC

DM

Program Off ice

Eng-Design

Drafter-CentaurDrafter-Booster

Eng-StructuresEng-Av ionics

Eng-Fluids

Eng-Checking

Eng-Mission Int

Eng-Sof tware

Supplier Data

Eng-Chief

Conf iguration Management

Admin

Saf ety

Eng-Sy stems

Model Control

ReleaseMission Success

Order Control

Quality

Contracts

Subcontract-AdminMaterial

Planning0

Eng-Production

Process Planning

Eng-QA

Asset SpecialistsPrint Crib

Machinist-Tool

Eng-Mechanical

Eng-Test

Production Planning

Product AssuranceReproduction

Repro-Data Entry

Repro-Lead

Reproduction-Photographer

Repro-Copy

Repro-Distribution

Receiv ing

Receiv ing-Asset Specialist

Receiv ing-Data

Receiv ingQuality Inspection

Truck Driv er

Mission Integration

Cape Receiv ing

Eutelsat

Purchasing-Planning

Buy er-Labarge Eng-Labarge

CSC HarlingenCODS EDE

ProE

TRMS

CODSProE

CODS

CODSCVSPADR

CODSProE

ProEPADR

TSOCODSPADR

Support

Support

Support

MACPAC

MPPS

Support

CODS

MACPAC

CODS

MPPS

PADRCODS

ELC

MPPS

CVS

FMP

MACPAC

PIRSPODS

KSAEMAS

Ref lections

CADS

CADS

CADS

Support

Support

Support

Support

MACPAC

Liv eLink

TSO ELC

DM

Program Off ice

Eng-Design

Drafter-CentaurDrafter-Booster

Eng-StructuresEng-Av ionics

Eng-Fluids

Eng-Checking

Eng-Mission Int

Eng-Sof tware

Supplier Data

Eng-Chief

Conf iguration Management

Admin

Saf ety

Eng-Sy stems

Model Control

ReleaseMission Success

Order Control

Quality

Contracts

Subcontract-AdminMaterial

Planning0

Eng-Production

Process Planning

Eng-QA

Asset SpecialistsPrint Crib

Machinist-Tool

Eng-Mechanical

Eng-Test

Production Planning

Product AssuranceReproduction

Repro-Data Entry

Repro-Lead

Reproduction-Photographer

Repro-Copy

Repro-Distribution

Receiv ing

Receiv ing-Asset Specialist

Receiv ing-Data

Receiv ingQuality Inspection

Truck Driv er

Mission Integration

Cape Receiv ing

Eutelsat

Purchasing-Planning

Buy er-Labarge Eng-Labarge

CSC HarlingenCODS EDE

ProE

TRMS

CODSProE

CODS

CODSCVSPADR

CODSProE

ProEPADR

TSOCODSPADR

Support

Support

Support

MACPAC

MPPS

Support

CODS

MACPAC

CODS

MPPS

PADRCODS

ELC

MPPS

CVS

FMP

MACPAC

PIRSPODS

KSAEMAS

Ref lections

CADS

CADS

CADS

Support

Support

Support

Support

MACPAC

Liv eLink

TSO ELC

DM

Program Off ice

Eng-Design

Drafter-CentaurDrafter-Booster

Eng-StructuresEng-Av ionics

Eng-Fluids

Eng-Checking

Eng-Mission Int

Eng-Sof tware

Supplier Data

Eng-Chief

Conf iguration Management

Admin

Saf ety

Eng-Sy stems

Model Control

ReleaseMission Success

Order Control

Quality

Contracts

Subcontract-AdminMaterial

Planning0

Eng-Production

Process Planning

Eng-QA

Asset SpecialistsPrint Crib

Machinist-Tool

Eng-Mechanical

Eng-Test

Production Planning

Product AssuranceReproduction

Repro-Data Entry

Repro-Lead

Reproduction-Photographer

Repro-Copy

Repro-Distribution

Receiv ing

Receiv ing-Asset Specialist

Receiv ing-Data

Receiv ingQuality Inspection

Truck Driv er

Mission Integration

Cape Receiv ing

Eutelsat

Purchasing-Planning

Buy er-Labarge Eng-Labarge

CSC HarlingenCODS EDE

ProE

TRMS

CODSProE

CODS

CODSCVSPADR

CODSProE

ProEPADR

TSOCODSPADR

Support

Support

Support

MACPAC

MPPS

Support

CODS

MACPAC

CODS

MPPS

PADRCODS

ELC

MPPS

CVS

FMP

MACPAC

PIRSPODS

KSAEMAS

Ref lections

CADS

CADS

CADS

Support

Support

Support

Support

MACPAC

Liv eLink

TSO ELC

Findings• Sign-off processes lack system

efficiency and result in manual reproduction effort (44 of the 56 change order steps are manually completed)

• Non-interfaced systems require re-keying of data

• Multiple systems generate additional work to maintain and update data (EBOM vs. MBOM configuration)

• Local application used to track and manage data flowing through the release and configuration management areas duplicates work in CODS (File Maker Pro)

Information space maps reveal complexity added to the value stream through inefficient system and data flows

3. Developing Well-defined Goals & Objectives: Current State

Page 15: Implementing Innovative Process Improvement & Lean Practices

3. Developing Well-defined Goals & Objectives

So what types of objectives should be developed that can help managers envision and and implement better processes that create more value and less waste?

• Physical measures of the current state to spur improvement

• Changes in these physical measures in the future state – determined in the C step PDCA – to confirm improvement?

Page 16: Implementing Innovative Process Improvement & Lean Practices

3. Developing Well-defined Goals & Objectives

Lean goals & measures need to reinforce the new configuration of work and encourage the minimization of “distance, friction, space and time”.

Sample Lean Metrics• Cycle times• Customer service levels (e.g., late orders, delivery performance)• Total product throughput time• Resources consumed per unit of output• Resources employed per unit of output• Inventory / working capital turns• Return on assets• Hand-offs in critical processes• Distance parts/materials, travel• % of workforce cross-trained

Page 17: Implementing Innovative Process Improvement & Lean Practices

4. Team Selection• Cross-functional and include customers and suppliers

– People who have a “stake” in the value stream• Customers: e.g. Hospital Patients, Building owners (Fire Prevention Services)• Suppliers e.g. Facilities maintenance, Procurement

• People who actually “do” the work• Managers who are prepared to go the gemba and “roll up

their sleeves” (you may have to “help” prepare them)• Ideally, people who are familiar with the PDCA cycle

– Plan, Do, Check, Act (See Appendix for explanation of the PDCA cycle)• People who’ve had some exposure and training on the

application Lean tools & techniques, in particular– Value stream mapping– Observations (Day-in-life)

Page 18: Implementing Innovative Process Improvement & Lean Practices

5. Organizational Buy-in: The Roots of Engagement

So what is it that prevents an organization from implementing its Lean Strategy?

In our experience responses can generally be categorized into one of the two following gaps:

1. The first gap occurs when an organization tries to execute its lean strategy despite its people, rather than through them.

2. The second gap is formed by the organization’s failure to create a process that clearly outlines how the strategy will be executed, and most important, connects the people to each other in that execution.

Page 19: Implementing Innovative Process Improvement & Lean Practices

5. Organizational Buy-in: The Engaged Difference

So:

1. How do we convince an entire organization to think and act differently?

2. How do we encourage those discretionary efforts so critical to success?

3. How do we get the full workforce to become engaged?

Page 20: Implementing Innovative Process Improvement & Lean Practices

5. Organizational Buy-in: The Engaged Difference

1. PEOPLE WANT TO BE PART OF SOMETHING BIG.

2. PEOPLE WANT TO FEEL A SENSE OF BELONGING

3. PEOPLE WANT TO GO ON A MEANINGFUL JOURNEY

4. PEOPLE WANT TO KNOW THAT THEIR CONTRIBUTIONS MAKE A SIGINIFICANT IMPACT OR DIFFERENCE

Page 21: Implementing Innovative Process Improvement & Lean Practices

5. Organizational Buy-in: An Engagement Technique

“Oranging” it: An innovative Problem Solving and Value Stream Improvement Technique

Michael Rosenberg – Author of “The Flexible Thinker”