Background The Workday is one of eight units that makes up the non-profit entity Restore St. Louis. The overarching goal of Workday is to equip local and non-local volunteers to “directly assist the fatherless, the widow, immigrants and refugees” [1]. This assistance comes to fruition in many different ways, from mowing a lawn to performing major repairs to make a bathroom handicap-friendly. The work is done entirely by a volunteer force through monthly workdays and week-long team events throughout the summer.
A major facet of the Workday is building wheelchair ramps for homes in the city.
[1] http://restorestlouis.org/workday/
![Page 3: IMPROVEMENT OF RAMP SITE FOR WORKDAY- RESTORE ST. LOUIS Wheelchair Lift Project](https://reader036.vdocuments.net/reader036/viewer/2022082518/56649ecb5503460f94bd95c8/html5/thumbnails/3.jpg)
Design Problem To develop a solution that would take the inhabitant from their front door to street-level while maintaining a cost comparable to building a traditional ramp.
![Page 4: IMPROVEMENT OF RAMP SITE FOR WORKDAY- RESTORE ST. LOUIS Wheelchair Lift Project](https://reader036.vdocuments.net/reader036/viewer/2022082518/56649ecb5503460f94bd95c8/html5/thumbnails/4.jpg)
RequirementsMeet standards as per the ADA (weight, safety, speed constraints, etc.)
Generic or modular elements
Meet cost constraints (<$2,300)
Ease of assembly (low-skilled volunteers should be able to implement)
Subject to change over the course of the semester
![Page 5: IMPROVEMENT OF RAMP SITE FOR WORKDAY- RESTORE ST. LOUIS Wheelchair Lift Project](https://reader036.vdocuments.net/reader036/viewer/2022082518/56649ecb5503460f94bd95c8/html5/thumbnails/5.jpg)
Preferred ElementsTransferable, can be re-used
Lift (a lift that is door-to-street has a budget increase to $3,000)
Power source could be a household outlet
![Page 6: IMPROVEMENT OF RAMP SITE FOR WORKDAY- RESTORE ST. LOUIS Wheelchair Lift Project](https://reader036.vdocuments.net/reader036/viewer/2022082518/56649ecb5503460f94bd95c8/html5/thumbnails/6.jpg)
Current Design
![Page 7: IMPROVEMENT OF RAMP SITE FOR WORKDAY- RESTORE ST. LOUIS Wheelchair Lift Project](https://reader036.vdocuments.net/reader036/viewer/2022082518/56649ecb5503460f94bd95c8/html5/thumbnails/7.jpg)
Contact Information Paul [email protected](314) 495-85431142 Hodiamont Ave St. Louis, MO 63112
Paul’s Engineering Contact?
![Page 8: IMPROVEMENT OF RAMP SITE FOR WORKDAY- RESTORE ST. LOUIS Wheelchair Lift Project](https://reader036.vdocuments.net/reader036/viewer/2022082518/56649ecb5503460f94bd95c8/html5/thumbnails/8.jpg)
Monthly Saturday Workday 2nd Saturday of Every Month:
September 12…