Improving Planning Services
PAS Spring Conference 2015
Martin Hutchings, Toby Hamilton
Date: March 2015 www.pas.gov.uk
![Page 2: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/2.jpg)
this session
“the pre-requisites for improvement”
1. Understand what is happening
2. Use a sensible approach to changing things
3. Measure the things that help you understand and act
![Page 3: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/3.jpg)
Presentation and discussion
• Part 1 – Understanding what’s really happening in our planning services?
Tea / Coffee
• Part 2 – Rethinking Planning (revolutionising ways of working for our customers)
![Page 4: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/4.jpg)
Part 1 What is really happening in planning services?
![Page 5: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/5.jpg)
Benchmark roundup – why bother?
• Benchmarking since 2009– 276 councils participated, many more
than once– Confidential, but valuable dataset
• Publish aggregate as a “state of the nation”– Before we forget– for future benefit
![Page 6: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/6.jpg)
What we’ll cover
• Costs and subsidy of planning• Fees• Productivity• Customer survey• Planning Quality Framework
![Page 7: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/7.jpg)
What do councils spend the money on?
![Page 8: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/8.jpg)
![Page 9: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/9.jpg)
Percentage of LPA cost not covered by fees and income
• Each vertical line represents a different LPA• Average subsidy = almost 70% (at the time)
![Page 10: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/10.jpg)
Cost per hour
Average cost per person per productive hour
Work type 2011 2012/13 Combined Planning applications (direct) £48 £48 £48 Planning applications (other) £40 £40 £40 Compliance work - enforcement etc. £41 £41 £41 Strategic Planning £51 £55 £52 All planning activities £46 £46 £46
- Productive hourly rate = £46- Compare this with pre-app charges (!)
![Page 11: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/11.jpg)
Majors = profit. Avoid conditions!
Application count
Cost of processing per
app
Fee per app at time of
benchmark
% not covered by fee
Major non residential 2170 2886 6251 -117%All dwellings 14166 1668 1294 22%Minor non residential 21288 794 410 48%Householders 48020 408 131 68%Heritage 12006 450 2 100%All waste 210 6292 2604 59%All minerals 191 2411 2248 7%All others 48817 392 158 60%Conditions 12781 270 92 66%All app types 159649 602 356 41%
![Page 12: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/12.jpg)
Productivity
• “We are not updating the 150 cases per officer thing”
![Page 13: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/13.jpg)
Productivity
• “We are not updating the 150 cases per officer thing”
– In the end, we have (sort of)
![Page 14: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/14.jpg)
Caseload = 144 / case officer
![Page 15: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/15.jpg)
Productivity revisited
• In 2002, it was professional case officer + admin types. Now less differentiation.
• Not cases per DC officer, but cases per person– Derives total head count– In the ODPM study, this was “less than 100”
![Page 16: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/16.jpg)
All-in figure is 88 cases per person
![Page 17: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/17.jpg)
All-in figure is 88 cases per person
![Page 18: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/18.jpg)
Why is there such a difference?
![Page 19: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/19.jpg)
Work mix
– high numbers of simple applications. Fast track.
![Page 20: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/20.jpg)
Size seems to make some difference
Large authorities = often higher productivity
![Page 21: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/21.jpg)
Customers
• In aggregate there were clear messages– Talk to us, generally. It’s just manners. – Talk to us *especially* when there are issues– Let us amend– Councils (generally) fail on customer care
• We fail because we don’t communicate and follow a target culture
![Page 22: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/22.jpg)
Reflections on the old benchmark results• One size does not fit all• National indicators hide almost everything
about performance• Subsidy represents a risk to development• Communication is often weak
![Page 23: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/23.jpg)
http://qualityframework.net/
![Page 24: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/24.jpg)
The real performance ‘story’
• Facts; real-time data on planning applications.
• Opinion; what customers say about the planning service
• Practice: how the service is delivered and goes about negotiating the best developments and outcomes
![Page 25: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/25.jpg)
The real performance story• More focused on customers• Internal management tool / external
‘declaration’• Not annual snapshot, but a continuous
process• Benchmark and compare• No ‘start’ date – just get going • External ‘badge’ of quality
![Page 26: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/26.jpg)
Your work profileCouncil 1 Council 2 Council 3
Council 4 Council 5 Council 6
• Variety• Benchmarking • Data integrity
![Page 27: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/27.jpg)
Your fee profile
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
• Variety• Income • Improvement focus• Risk
![Page 28: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/28.jpg)
Outcomes – approvals
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
• Trends• Messages• Differences
![Page 29: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/29.jpg)
Withdrawn applications
Value Vs Non-value
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
• Waste• Trend – positive/negative• Cost: work + free go• Message to community
![Page 30: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/30.jpg)
No fee (exc. heritage & trees)
Value Vs Non-value
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
![Page 31: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/31.jpg)
Process performance
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
Valid on receipt
• Avoidable time/cost• Is it you or them?• Application type
![Page 32: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/32.jpg)
Customer or Target-driven?
Process performance
![Page 33: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/33.jpg)
Box Plots
Most (50%) of the data
median
Upper 25%
Lower 25%
Average
![Page 34: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/34.jpg)
Customer or Target-driven?
Process performance
GOOD
Decisions asap
BAD
Last minute
![Page 35: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/35.jpg)
More to come
• Resources • Investment
[need more testing]
![Page 36: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/36.jpg)
Is it getting busier ? [yes]
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
![Page 37: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/37.jpg)
Development value in our place = £60m/yr
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
![Page 38: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/38.jpg)
Customer Surveys• Agents, Applicants, Neighbours, Peers• Staff, councillors, amenities• Tied to an individual application• Help, Time, Information, Straightforward.
![Page 39: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/39.jpg)
Customer Surveys
• “We may be slow, but we offer a quality service”– This allows you to test, prove
• Same questions nation-wide• Early days
![Page 40: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/40.jpg)
survey results Application Ref: HA/FUL/4456/14
![Page 41: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/41.jpg)
Q: how many expensive process reviews focus on speeding things up but fail to notice that the service says ‘yes’ more often than its peers, creates less waste and has happier customers?
PQF = the real performance story
![Page 42: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/42.jpg)
“PAS Planning Quality Framework = consistent, relevant information to benchmark performance” (p12):
![Page 43: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/43.jpg)
Solution in search of a problem ?
• Purpose• Routine• Value
• Or do something else …• Use it or lose it ?
![Page 44: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/44.jpg)
Part 2 Rethinking Planning (revolutionising ways of working for our customers)
![Page 45: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/45.jpg)
![Page 46: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/46.jpg)
![Page 47: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/47.jpg)
EVERY GROUP YOU’VE EVER WORKED WITH
Time with peers
Away from the day job
Easy-to-implement ideas
Time with peers
Away from the day job
Easy-to-implement ideas
![Page 48: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/48.jpg)
Project plans Wide ranging Big bang
Project plans
Wide ranging Big bang
![Page 49: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/49.jpg)
Start here
![Page 50: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/50.jpg)
![Page 51: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/51.jpg)
What we’re learning from other disciplines
• Start with the customer, purpose
• Understand how everything relates
• Re-think the ‘why?’ not just ‘what?’ & ‘how?’
• Experiment ‘in the work’
• Avoid too much change at once
• Test, learn, change as you go (forever)
![Page 52: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/52.jpg)
A Revolution in Planning
Nick SmithCheshire West & Cheshire
![Page 53: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/53.jpg)
Performing well against the national targets but felt we could do better for customers.
We had seen Case Studies of how some authorities had improved their planning service by designing it around their customers.
Volunteered for the Planning Advisory Service project pilot in July 2014.
The purpose of this presentation is to show you what we have achieved since that time and see what you think.
Introduction
![Page 54: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/54.jpg)
Planning decisions by number of days (March 2014-September 2014)
8 weeks
Time – March 2014 to September 2014
Num
ber
of d
ays
![Page 55: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/55.jpg)
Current case load (per Officer at any one time)
![Page 56: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/56.jpg)
‘As is’ process
![Page 57: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/57.jpg)
‘As is’ process
Pre-app phone
Formal pre-app
Consultations
Planning application
Discharge of conditions Committee?Appeals?
![Page 58: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/58.jpg)
Systems thinking diagrams
![Page 59: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/59.jpg)
To enable the best development
without delay
Purpose
![Page 60: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/60.jpg)
![Page 61: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/61.jpg)
![Page 62: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/62.jpg)
![Page 63: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/63.jpg)
![Page 64: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/64.jpg)
1. Can I build?2. Appraise it3. Get the information you need (to make a
decision)4. Tell the customer they can do it (or why
they can’t)
MethodValue adding steps that help us to enable the
best development without delay
![Page 65: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/65.jpg)
Tested 77 householder applications (as of 23/2/2015)
Issued 30 householder planning permissions Average number of days from first contact to
decision being issued for householder applications was 59 days (2014) and with experiment is now 29 days
Agents/applicants are more open to negotiation to improve schemes
Results so far…
![Page 66: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/66.jpg)
“From submitting the application via the Planning Portal to registration with the LPA, the process was quick and efficient.
It was refreshing to receive feedback on the application at the start of the planning process and not the end which is usually the case with other LPA's, leaving little or no time to make any required amendments.
Overall, we could not be happier with the process”
![Page 67: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/67.jpg)
“It gives us as agents maximum chance to help resolve queries or respond to suggestions”
![Page 68: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/68.jpg)
This is absolutely fabulous - my Client will be extremely pleased at the speed and efficiency with which this has been dealt with.
![Page 69: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/69.jpg)
I can't believe you are calling so quickly - you are obviously not Cheshire East! Direct quote from Michael Gore (MEG Design)
![Page 70: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/70.jpg)
I wish a few more local authorities were as helpful and informative as yours, I was very impressed. (I submit applications across the UK).
![Page 71: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/71.jpg)
Next steps
Test more applications of different type and size
Introduce more Officers to the method (whilst minimising the disruption to the old system)
Keep learning! Looking at opportunities for integration with
the Joint Venture project over the coming months
![Page 72: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/72.jpg)
Shorter end-to-end times Happier customers Staff morale Focusing on one application at a time means
improved quality of decision making
Benefits
![Page 73: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/73.jpg)
Freeing up capacity to support you Having a named Planning Officer who is
aware of the application and the issues from the start
Happier constituents means fewer complaints
Better quality decision making – improves local environment
Benefits for Members
![Page 74: Improving planning services](https://reader030.vdocuments.net/reader030/viewer/2022032618/55b73f90bb61ebba388b464e/html5/thumbnails/74.jpg)
There is nothing so useless as doing efficiently that which should not be done at all
Peter Drucker
Any questions?