Audiovisual Design ProfessionalsPartnering with Architects for More Successful Projects
Tony SprandoAudio Visual Presentations, [email protected]
InfoComm Arch v 6.0
![Page 2: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/2.jpg)
This Program AIA/CES Registered
InfoComm is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned upon completion of this program will be reported to CES Records for AIA members. Certificates of Completion for non-AIA members are available on request.
This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.
![Page 3: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/3.jpg)
Copyright Materials
This presentation is protected by USand International Copyright laws.
Reproduction, distribution, display anduse of the presentation without written
permission of the speaker is prohibited.© InfoComm International 2006
![Page 4: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/4.jpg)
Learning Objectives
To be aware of best practices in the design and integration of audiovisual technology into building spaces
To understand the role of AV Design Professionals in the building process
To learn about the latest AV technologies and applications
![Page 5: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/5.jpg)
The Audiovisual/Communications Industry…A lot has changed!
![Page 6: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/6.jpg)
ARCHITECTURE
Business
G o v e r n m e n t
SpecialEvents
EDUCATION
WORSHIP
Sports Healthcare Transportation
Entertainment& Hospitality
Museums
Changing the way the world does
audiovisual
Proliferation of AV Needs Are All Around Us!
![Page 7: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/7.jpg)
Conferencing/Collaboration
AV & ITIntegration
Digital Signage& Content
HighDefinition
16x9Format Impact
…And the Needs are Growing Dramatically
AV/Communication’s Five Big Growth Drivers
Source: InfoComm International
![Page 8: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/8.jpg)
Audiovisual Design Professionals Make Us a Part of Your Planning Team
You have access to all the latest AV best practice applications
Professional AV insight provides your team a
competitive advantage
You can avoid costly design mistakes or planning omissions
You have a professional AV partner focused on your complete success
![Page 9: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/9.jpg)
The AV Consultant’s Role
ArchitectGeneral
Contractor
Owner
OtherDesign
Consultants
Sub-ContractorsAVAV
ConsultantConsultant(Design)(Design)
AVAVIntegratorIntegrator
(Supply,Install)(Supply,Install)
![Page 10: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/10.jpg)
The AV Integrator’s Role
ArchitectGeneral
Contractor
Owner
DesignConsultant
Sub-Contractors
Design Build
AVAVIntegratorIntegrator
(Design, Supply,(Design, Supply,Install)Install)
![Page 11: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/11.jpg)
Broad AV Application for Architectural Design
Boardrooms, conference &videoconference rooms, auditoriums
Retail environments
Schools, universities, training centers
Production, broadcast studios
Entertainment venues
Stadiums and arenas
Hotels and conference centers
Houses of worship
Courthouses, legislative facilities
![Page 12: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/12.jpg)
AV Application for Architectural Design
PRESENTER: Create one or more slides with project photos to illustrate vertical markets that you specialize in – business, education, government, healthcare, museums, sports arenas, etc.
![Page 13: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/13.jpg)
Broad Application for Architectural DesignWe Help You Ask All the Right Questions
Users? Purposes?
Flexibility or fixed furniture?
Portable equipment or built-in?
Cable pathways?
Room size/divisibility?
Multiple finish/capability levels in different rooms?
![Page 14: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/14.jpg)
Broad Value for Architectural DesignKeen Insight Into Leading Edge Technologies
HDTV - High Definition TV
Electronic Acoustic Enhancement
Wireless Connections
Full-room Videoconferencing
Collaborative Tools
Digital AudioProcessing
Multipoint Distance Learning
Phenomenal Display Choices
AV Help Desk
![Page 15: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/15.jpg)
Broad Value for Architectural DesignKeen Insight Into Leading Edge Technologies
Audio teleconferencing systems
Video projection – LCDs, DLPs
Presentation monitors – CRTs, LCD’s, PLASMA, LEDs, OLEDs, OLEPs
Document cameras
Computer video interfaces
Remote control systems
![Page 16: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/16.jpg)
Broad Value for Architectural DesignKeen Insight Into Leading Edge Technologies
Surround sound
DSS – satellite television
Distributed videoconferencing
Streaming media
Computer training systems
Simultaneous translation systems
![Page 17: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/17.jpg)
Broad Value for Architectural DesignTechnology-enabled Furniture and Millwork
Lecterns/presentation stations
Student seating
Credenzas
Audiovisual armoires
Media walls
Projector and monitor lift mechanisms
“Smart” conference tables and more
![Page 18: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/18.jpg)
Broad Value for Architectural DesignTechnology-enabled Furniture and Millwork
PRESENTER: Use project photos to illustrate technology-enabled furniture and millwork as appropriate
![Page 19: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/19.jpg)
AV DesignersHelping You Define Essential Technologies
Projection screens
Floor and wallboxes
Raised floors
Equipment racks / closets
Lighting interfaces
Blackout shades
Conduits and wire ways
Data centers/telephone & LAN closets
Acoustical materials
![Page 20: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/20.jpg)
Stay in Compliance with Requirements/Needs Disabled Presenters & Attendees
Auditory assistance systems
Closed captioning
Specialized computer peripherals
Handicapped access lecterns/ workstations
Control Booths
![Page 21: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/21.jpg)
Key Coordination Issues for Successful Architectural Projects
ArchitecturalHandicap, Millwork,
Fit & Finish
ElectricalPower, Infrastructure,
Lighting
Mechanical/HVACVentilation, Noise issues
StructuralEquipment Mounting,
Seismic
![Page 22: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/22.jpg)
AV Program
Data/TelecomProgram
PROGRAMMING BUILDING DESIGN
BASE BUILDING BID
AV BID MOVE-IN
The AV Professionals Role in PlanningLarge Project Design and Construction Process: 2 to 4 Years
PROGRAM
2-4 2-4 monthsmonths
6-12 6-12 monthsmonths
12-24 12-24 monthsmonths
1-3 1-3 monthsmonths
DESIGN CONSTRUCTION OCCUPY
AV
DATA/TELECOM
![Page 23: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/23.jpg)
AV Program
Data/TelecomProgram
AV InfrastructureDesign
Data/TelecomInfrastructure
Design
PROGRAMMING BUILDING DESIGN
BASE BUILDING BID
AV BID MOVE-IN
The AV Professionals Role in PlanningLarge Project Design and Construction Process: 2 to 4 Years
PROGRAM
2-4 2-4 monthsmonths
6-12 6-12 monthsmonths
12-24 12-24 monthsmonths
1-3 1-3 monthsmonths
DESIGN CONSTRUCTION OCCUPY
DATA/TELECOM
AV
![Page 24: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/24.jpg)
AV Program
Data/TelecomProgram
AV InfrastructureDesign
Data/TelecomInfrastructure
Design
PROGRAMMING BUILDING DESIGN
BASE BUILDING BID
AV BID MOVE-IN
CONSTRUCTION OCCUPY
The AV Professionals Role in PlanningLarge Project Design and Construction Process: 2 to 4 Years
PROGRAM
2-4 2-4 monthsmonths
6-12 6-12 monthsmonths
12-24 12-24 monthsmonths
1-3 1-3 monthsmonths
DESIGN
DATA/TELECOM
AV
Monitoring AV Infrastructure & Installation
AV System Design
Monitoring Data/TelecomInfrastructure & Install
Network & PhoneSystem Design
AV System Install
Monitor AV Sys. Install
![Page 25: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/25.jpg)
AV Program
Data/TelecomProgram
AV InfrastructureDesign
Data/TelecomInfrastructure
Design
PROGRAMMING BUILDING DESIGN
BASE BUILDING BID
AV BID MOVE-IN
The AV Professionals Role in PlanningLarge Project Design and Construction Process: 2 to 4 Years
PROGRAM
2-4 2-4 monthsmonths
6-12 6-12 monthsmonths
12-24 12-24 monthsmonths
1-3 1-3 monthsmonths
DESIGN CONSTRUCTION OCCUPY
DATA/TELECOM
AV
Monitoring AV Infrastructure & Installation
AV System Design
Monitoring Data/TelecomInfrastructure & Install
Network & PhoneSystem Design
Training
Install. &Configuration
Monitor AV Sys. Install
AV System Install
![Page 26: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/26.jpg)
PROGRAMMING BUILDING DESIGN
BASE BUILDING BID
AV BID MOVE-IN
The AV Professionals Role in Planning
1-2 1-2 monthsmonths
3-6 3-6 monthsmonths
3-12 3-12 monthsmonths
0-2 0-2 monthsmonths
DATA/TELECOM
AV
Small Project Design and Construction Process: 6 months to 2 Years
PROGRAM DESIGN CONSTRUCTION OCCUPY
AV Program
Data/TelecomProgram
![Page 27: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/27.jpg)
PROGRAMMING BUILDING DESIGN
BASE BUILDING BID
AV BID MOVE-IN
The AV Professionals Role in Planning
1-2 1-2 monthsmonths
3-6 3-6 monthsmonths
3-12 3-12 monthsmonths
0-2 0-2 monthsmonths
DATA/TELECOM
AV
Small Project Design and Construction Process: 6 months to 2 Years
PROGRAM DESIGN CONSTRUCTION OCCUPY
AV Program
Data/TelecomProgram
AV InfrastructureDesign
Data/TelecomInfrastructure
Design
![Page 28: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/28.jpg)
PROGRAMMING BUILDING DESIGN
BASE BUILDING BID
AV BID MOVE-IN
The AV Professionals Role in Planning
1-2 1-2 monthsmonths
3-6 3-6 monthsmonths
3-12 3-12 monthsmonths
0-2 0-2 monthsmonths
DATA/TELECOM
AV
Small Project Design and Construction Process: 6 months to 2 Years
PROGRAM DESIGN CONSTRUCTION OCCUPY
AV Program
Data/TelecomProgram
AV InfrastructureDesign
Monitoring AV Infrastructure & Installation
Monitoring Data/TelecomInfrastructure & Install
Network & Phone System
Design
AV System Install
Monitor AV Sys. Install
Training
Data/TelecomInfrastructure
Design
![Page 29: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/29.jpg)
PROGRAMMING BUILDING DESIGN
BASE BUILDING BID
AV BID MOVE-IN
The AV Professionals Role in Planning
1-2 1-2 monthsmonths
3-6 3-6 monthsmonths
3-12 3-12 monthsmonths
0-2 0-2 monthsmonths
DATA/TELECOM
AV
Small Project Design and Construction Process: 6 months to 2 Years
PROGRAM DESIGN CONSTRUCTION OCCUPY
AV Program
Data/TelecomProgram
Monitoring AV Infrastructure & Installation
Install&Configure
Monitoring Data/TelecomInfrastructure & Install
Network & Phone System
Design
AV System Install
Monitor AV Sys. Install
AV InfrastructureDesign
Training
Data/TelecomInfrastructure
Design
![Page 30: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/30.jpg)
You have access to all the latest AV best practice applications
Professional AV insight provides your team a
competitive advantage
You can avoid costly design mistakes or planning omissions
You have a professional AV partner focused on your complete success
Audiovisual Designers Make Us a Part of Your Planning Team
![Page 31: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/31.jpg)
Three Things You Need to Know About Your AV Partner…
They are the best trained AV professionals in the world today1
2 They are industry savvy and understand today’s issues and tomorrow’s trends
3 They bring a passion for service and a commitment to excellence
![Page 32: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/32.jpg)
Q&AThank you!
Audiovisual Design ProfessionalsPartnering with Architects for More Successful Projects
PresenterLogo
![Page 33: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/33.jpg)
Plus, your AV Design Professional is backed by the communication industry’s largest trade association providing world class education, certification and information
![Page 34: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/34.jpg)
Keeping AV Leaders Around the World Informed
Providing an independent news authority for the AV industry
News & Information
![Page 35: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/35.jpg)
Keeping AV Leaders Around the World Trained
Providing industry leading web-based and onsite
continuing education and specialized certification
Education & Certification
![Page 36: Info comm arch_tony_sprando](https://reader033.vdocuments.net/reader033/viewer/2022052619/555cf801d8b42a08668b5041/html5/thumbnails/36.jpg)
Keeping AV Leaders Around the World Connected
International tradeshow presence keeps AV & Communication
professionals connected with the latest in innovation
World’s Largest AV Tradeshow