Innovative technology cluster “Zelenograd”
Zaytsev Vladimir, CEO
Zelenograd TechnoUnity: an ecosystem for innovation
SEZTerritory 146 haIncome – €128 millionJobs - 827
Industrial park (plan)Territory 61,9 ha, Building area 640 000 m2
Jobs - 17000
Business IncubatorBuilding area - 6670 m2
Income - €2,5 million.Jobs - 200
TechnopolisTerritory 12 haArea 108 000 m2(plan)Area 25 112 m2(fact)Income - €40 million.Jobs - 3000
Educational and innovative infrastructure
NR UETManpower, R&D
Zelenograd background:Total area – 3720 ha, Population – 226 600, industrial personnel – 23 00060% of the population have higher education , More than 1 000 graduates annually
More than 150 members includes:-business – 108 enterprises;-scientific, project & design enterprises – 28;-education - 2 institutes;-institutions for development, structure of innovation activity support, government
institutions (Moscow Government and Zelenograd’s Prefecture), mass media – 14.
The largest companies of the cluster: JSC “Angstrem”, JSC “Mikron”, Zelenograd’s Innovation and Technology Center, Zelenograd’s Nanotechnological Center, Group of companies “Elvis”, “Komponent” Plant, Scientific and Technical Center “Elins”, JSC “NT-MDT”.
The total volume of revenue research-and-production companies - about $1 billion per year.
Annual GRP growth of Zelenograd - more than 15%
Cluster specialization
Specializes in:•micro- and nanoelectronics•electronic instruments and apparatus •integrated technical IT-systems on the basis of electronic
instruments and apparatus
Apparatus and equipmentNano - and microelectronics
Design
Photomasks
Microelectronic devices
IS
MEMS
RFID
Sensors
R&D
Epitaxy
Equipment
Vacuum
TestingApparatus
Laser processing
Control and measuring
Technology
Energy
Microassembly
Radiation control
Materials
Solar cells
HCS
Industrial gas
Nondestructive testing
Smart cards Energy system
Industrial gas
Cluster companies main competence
New materials & Epitaxy
АIIВVI semiconductors Garnet semiconductors Quartz plate for photomasks
Silicon Epitaxy Silicon on Sapphire (SOS) Epitaxy
Silicon wafers
Cluster specialization
Mic
roch
ips
Fina
l tes
ting
Pack
age
Waf
er p
robi
ng
Fabr
icati
on
Mas
k
DRC
, ERC
, LVS
Verifi
catio
n
APR
Gat
e le
vel
Sim
ulati
on
Synt
hesi
s
RTL
Dev
elop
Spec
. defi
nitio
n
Mod
el d
evel
op
Syst
em
spec
ifica
tion
Complete system description
RTL code, testbench, IP-blocks
Netlist
GDSII format data
Logs, checklistsFinal product,
fabrication reports
EKB & microelectronics
Memory chips, microcontrollers
and processorsSensorsAero-space chips Structures on silicon wafers
Cluster specialization
Devices & apparatus
Solar modules Electric energy meter Medical equipment
Energy-efficient appliances
Radiation control Security systems POS terminals Transport Validator
Telecom apparatus
Cluster specialization
Equipment
Microelectronics control Microscopes (ATM)
Epitaxial equipmentThermal processingNanotube productionLaser equipment for micro-
and nano-processing
Cluster specialization
The main purpose is to create the environment for development of innovative entrepreneurship
Radio electronics, instrumentation,
energy
Navigation, aerospace technology
Automation, control systems and resource
accounting
Electronic components and
equipment
Medical equipment, training equipment
IT, telecommunications
Total area 12 hectare
The total construction area of 108 thousand
m2
All communications included
Total construction investment of up to 145 million Euros
Technopolis Zelenograd
1
2
3
4
Ready
Proceeding
Innovation & industrial infrastructure
Construction stages
Stage 1 Stage 2
Stage 3 Stage 4
1 stagePeriod – 2006-2009
2 stagePeriod – 2013-2015
3 stagePeriod — 2014-2016
4 stagePeriod — 2015-2017
Five-storied administrative building to accommodate:
- Managing Company's staff and engineering functions.
- Public premises. - Offices of SME's businesses.
25 100 m2 space
Five 3-storey research and production laboratories – 17710 m2
Industrial building 3-6 floors - 27420 m2
Underground parking for 150 cars Open parking for 148 cars
Cap. investments – €74 millionThe area – 45130 m2
Community Center - 3470 m2
Storage building - 5210 m2
CHP - 1020 m2
Cap. investments – €34,1 millionThe area – 9700 m2
Three 3-storey industrial bldgs – 3x5860 m2
Four 2-storey research and production laboratories – 2x1262 m2
Multi-storey car park - 6700 m2
Cap. investments – €36,1 millionThe area – 29400 m2
State funding, loans, investors
Loans, investors
Technopolis construction plan
Loans, investors
Innovation & industrial infrastructure
Industrial park Zelenograd
Industrial park general plan
1.2.3.4.5.
6.7.8.9.
10.
Jobs – 13000…17000
BASIC TECHNICAL AND ECONOMIC INDICATORS (approximately)
BUILDINGS URBAN INFRASTRUCTURE Business center Office building Cultural and Sports Center Shopping and entertainment center Socio-cultural service
ENGINEERING AND TECHNOLOGY AREA Branch technical college A business incubator Hotel Industry Laboratory and pilot production Above ground, underground parking TOTAL
212 t. m2 42 t. m2
29 t. m2
27 t. m2
90 t. m2
24 t. m2
428 t. m2
38 t. m2
18 t. m2
50 t. m2
252 t. m2
70 t. m2
640 t. m2
6
8.1
3
1
4
2
10
10
10
10
10
10
10
9
9
9
9
9
9 9
9
9
11
11
11
11
5
5
5
5
8.2
8.3
7
Industrial park - "growth point" of production with advanced logistics.
Innovation & industrial infrastructure
Services & preferences
ServicesConsultations in the field of
legal support, marketing and advertising
Consultations in sphere of customs regulation
Consultations on IP protection, licensing and certification
Research and analytical activities
Business incubator
Technopark
Technopolis
SEZ
Preferential rents, rooms adapted for small businesses
Tax incentives, 5% quota in the state procurement of innovative products,
government support
Developed logistics, 5% quota in the state procurement of innovative products,
government support
Tax and customs preferences,government support
Preferences
Sheremetyevo International Airport 15 km
Leningradskoe highway 6 km
Moscow – St. Petersburg highway 10 km
Freight railway station 4 km
Terminal rail Express (since 2014) 0.3 km
Central ring road (since 2016)
13 km
Centre of Moscow
40 km
Sheremetyevo International
Airport
MOSCOW
ZELENOGRAD
Pyatnitskoye highway
Oktyabrskaya railway
Leningradskoe highway
Moscow – St. Petersburg highway (under construction)
Central ring road (under construction)
How to get here
WELLCOME TO MOSCOW!
Thank you for your attention!