Interface of Plug-Compatible Cryomodule Components
KEK
Norihito Ohuchi
2008/3/4 1GDE-Sendai Meeting
![Page 2: Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d835503460f94a68d6d/html5/thumbnails/2.jpg)
2008/3/4 2GDE-Sendai Meeting
From the presentation by Hitoshi Hayano at KEK-kick-off meeting on 2007/9/12-14
Vacuum vessel and cold mass
Cavity package
Quadrupole package
HOM absorber unit
Beam line pumping unit
![Page 3: Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d835503460f94a68d6d/html5/thumbnails/3.jpg)
Previous Works for Cryomodule Component Engineering Design
• Defined cavity parameters by Lutz at FNAL-GDE Meeting on 2007/10/23– Cavity length = 1247 mm
– Maximum outer diameter• Cells = 210 mm, HOM coupler = 232 mm Max. Radius = 116 mm
• Definition of the responsible group to the interface components at FNAL-GDE Meeting on 2007/10/23
• Helium vessel parameters at SCRF technology meeting on 2008/1/18 after TTC meeting at DESY– Max. allowable pressure at room temp. and vacuum inside = 2 bar
2008/3/4 GDE-Sendai Meeting 3
![Page 4: Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d835503460f94a68d6d/html5/thumbnails/4.jpg)
C1 level (cryomodule) interface for engineering designC1-level : Cryomodule (1)
2008/3/4 4GDE-Sendai Meeting
![Page 5: Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d835503460f94a68d6d/html5/thumbnails/5.jpg)
C1 level (cryomodule) interface for engineering designC1-level : Cryomodule (2)
2008/3/4 5GDE-Sendai Meeting
![Page 6: Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d835503460f94a68d6d/html5/thumbnails/6.jpg)
C2 level interface for engineering design (1)C2-level : Cold Mass (Vacuum vessel, support post, cooling pipes, shields)
2008/3/4 6GDE-Sendai Meeting
![Page 7: Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d835503460f94a68d6d/html5/thumbnails/7.jpg)
C2 level interface for engineering design (2)C2-level : Cavity Package (cavity jacket, tuner, input coupler)-1
2008/3/4 7GDE-Sendai MeetingLL-cavity-package
![Page 8: Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d835503460f94a68d6d/html5/thumbnails/8.jpg)
C2 level interface for engineering design (2)C2-level : Cavity Package (cavity jacket, tuner, input coupler)-2
2008/3/4 8GDE-Sendai Meeting
LL-cavity-package
![Page 9: Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d835503460f94a68d6d/html5/thumbnails/9.jpg)
C2 level interface for engineering design (3)C2-level : Quadrupole Package
2008/3/4 9GDE-Sendai Meeting
Quadrupole design by FNAL
![Page 10: Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d835503460f94a68d6d/html5/thumbnails/10.jpg)
C2 level interface for engineering design (4)C2-level : HOM Absorber, Vacuum Pump System
2008/3/4 10GDE-Sendai Meeting
![Page 11: Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d835503460f94a68d6d/html5/thumbnails/11.jpg)
C3 level interface for engineering designC3-level :Cold Mass, Cavity Package, Quadrupole Package
2008/3/4 11GDE-Sendai Meeting
Each component has interfaces between the other components.
![Page 12: Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d835503460f94a68d6d/html5/thumbnails/12.jpg)
Discussion
2008/3/4 12GDE-Sendai Meeting
1. Which level of the compatibility will be required for ILC cryomodule design work?• C1? C2? C3?
– Mass-production strategy in three regions• Production of one-third of total cryomodules in each region
• Cryomodule tests in each region
– Strategy of component exchange during the accelerator operation• Accident of component inside the cryomodule
![Page 13: Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649d835503460f94a68d6d/html5/thumbnails/13.jpg)
Proposal
2008/3/4 13GDE-Sendai Meeting
1. Compatibility at C1 level: “MUST”
2. Compatibility at C2 level – Cold mass
• Vacuum vessel, support post, gas return pipe and cavity support, cooling pipes
– Cavity-string• Cavities, input couplers, HOM couplers, tuner, connection bellows and flanges
• In the string, NO COMPATIBILITY in the base design
– Quadrupole package
– HOM absorber
– Pumping system
3. No compatibility at C3 level
4. Assign the responsible people for designing the interface components– FNAL: Don Mitchell, DESY: Lutz Lilje, KEK: Norihito Ohuchi