Transcript
Page 1: Introduction to Six Sigma

Introduction to

SIX SIGMA

Facilitator: Khan Mohd. IbrahimIndustrial Engineer & Six Sigma Black Belt

Overview: Module # 1

The Helicopter View

Page 2: Introduction to Six Sigma

Hello!This isKhan IbrahimYou can find me at:[email protected]

This presentation is for the personnel who are going to be a part of Six Sigma project as team member & need to know the basics.

The scope of this presentation is “Overview” & “Define” of Six Sigma.

Name: Khan Md. IbrahimProfession: Industrial EngineerCompany: A & E Bangladesh

Page 3: Introduction to Six Sigma

What do martial arts have to do with my job?

BLACK Belt??

Thousands of dollars $$ savings??

Page 4: Introduction to Six Sigma

What is Six Sigma?A process improvement methodology

Developed by Mikel Harry & Richard Schroeder of Motorola in 1980’s

Focuses to deliver near-perfect products & services

First time right of 99.9997% quality

Page 5: Introduction to Six Sigma

A story from Japan▷ “We will only accept 3

defective parts per 10,000”

---- IBM

▷ “The 3 defective parts have been separately manufactured and have been included in the consignment”

------ Japanese

Company

Page 6: Introduction to Six Sigma

How does it improve ?

▷ A statistical measure of the process performance

▷A goal that reaches near perfection

▷A system of management to achieve & sustain the goal

Page 7: Introduction to Six Sigma

Problem- Eat the Elephant

Eat the Elephant

Employee

Elephant

Boss

Page 8: Introduction to Six Sigma

“Henry Ford

Founder of Ford Motor

Page 9: Introduction to Six Sigma

Six Sigma Approach

▷Proceeds through small-small projects

▷3-6 months timeline per project

▷Very precise area of work in each project

Page 10: Introduction to Six Sigma

Six Sigma Learning Curve

White Belt- 1 day workshop

Yellow Belt- 2 to 3 days workshop

Green Belt- 4 to 6 weeks workshop

Black Belt- In depth training of SS

Page 11: Introduction to Six Sigma

Six Sigma…. Wait ... Six What??

What does that “Sigma” mean?

Page 12: Introduction to Six Sigma

Sigma

▷ Sigma is a Greek alphabet

▷Statistics- It stands for “Standard Deviation”

▷Statistics- It depicts deviation from target in a specific process

Page 13: Introduction to Six Sigma

99.9% QualityWHOA! THAT’S A BIG NUMBER, AREN’T WE PROUD?

Page 14: Introduction to Six Sigma

Why not 99.9% Quality?

1 hour of unsafe drinking water every month

Page 15: Introduction to Six Sigma

Why not 99.9% Quality?

2 long or short landing at every American Airport each day

Page 16: Introduction to Six Sigma

Why not 99.9% Quality?

400 letters per hour which never arrive at their destination

Page 17: Introduction to Six Sigma

Why not 99.9% Quality?

500 incorrect surgical operations each week

Page 18: Introduction to Six Sigma

Why not 99.9% Quality?

3000 newborns accidentally falling from the hands of nurses

or doctors every year

Page 19: Introduction to Six Sigma

Why not 99.9% Quality?

4000 incorrect drug prescriptions per year

Page 20: Introduction to Six Sigma

Why not 99.9% Quality?

22,000 checks deducted from the wrong bank account each

year

Page 21: Introduction to Six Sigma

Six Sigma Quality▷Only 3.4 defects per

million opportunities

▷Sigma level of 6 is difficult to achieve

▷Sigma level for Manufacturing companies is 2 – 4

▷Sigma level for Service companies is 3 -4

Page 22: Introduction to Six Sigma

Six Sigma Indicators

▷Defects per Unit (DPU)

▷Defects per Million Opportunities (DPMO)

▷Sigma Level

Page 23: Introduction to Six Sigma

Defects vs. Defectives

▷‘Defect’- A single non-conforming quality characteristics

▷‘Defectives’- items having one or more defects

▷3 defects in 1 defective item

1 Defective item

1. Weight in-accurate2. Inner diameter wrong3. Surface finish poor

Page 24: Introduction to Six Sigma

TransitionNext: Module # 2

Page 25: Introduction to Six Sigma

Facilitator: Khan Mohd. IbrahimIndustrial Engineer & Six Sigma Black Belt

Introduction to

SIX SIGMAOverview: Module # 2

Roles and Phases

Page 26: Introduction to Six Sigma

The Players

Management

Champion

Process Owner

Team Member Others

Master Black Belt

Black Belt

Finance Rep

Green Belt

Page 27: Introduction to Six Sigma

Process Owner: Roles1

• Functionally responsible for an area of the project

2 • Help to lead the culture change

3• Provide and support team

members for the project

4• Implement and Own the solution

provided by the Black belts / Green belts

5• Carry the torch after the

completion of the project

Page 28: Introduction to Six Sigma

Team Member: Roles

1• Receive training on

basic Six sigma tools

2• Helps in data

collection

3• Supply the team with

process Expertise

Page 29: Introduction to Six Sigma

Six Sigma: Phases of a Project

Page 30: Introduction to Six Sigma

Phase: Define

▷Identify problems▷Define project▷Select Black Belt/ Green Belt▷Select Team Member▷Estimate Financial Impact

Define

Page 31: Introduction to Six Sigma

Phase: Measure

▷Map the process▷Identify inputs & outputs▷Identify opportunity of failures▷Analyze measurement system▷Establish baseline capability

Measure

Page 32: Introduction to Six Sigma

Phase: Analyze

▷Identify factors▷Hypothesis Testing▷Graphical &

Statistical analysis to identify critical factors

Analyze

Page 33: Introduction to Six Sigma

Phase: Improve

▷Factorial Designs▷Identify Interactions▷Define Y = f(x)

Improve

Page 34: Introduction to Six Sigma

Phase: Control

▷Optimize outputs▷Implement Control Plan▷Project Closure

Control

Page 35: Introduction to Six Sigma

TransitionNext: Module # 3

Page 36: Introduction to Six Sigma

Introduction to

SIX SIGMAOverview: Module # 3

Basic Statistics

Facilitator: Khan Mohd. IbrahimIndustrial Engineer & Six Sigma Black Belt

Page 37: Introduction to Six Sigma

What is a Statistic?▷ Data or Information from a

sample

Page 38: Introduction to Six Sigma

Population vs. Sample

▷Population: includes all members of a defined group

▷Sample: Sample is a proportion of a population, a slice of it

Sample

Population

Page 39: Introduction to Six Sigma

What to measure?

▷Mean (µ): Weighted average of the measurement

▷Standard Deviation (σ): Statistical measure of variation from mean

Page 40: Introduction to Six Sigma

“Jack Welch

CEO of General Electric

“Variation is Evil”

Page 41: Introduction to Six Sigma

Types of variations

Variations

Common Cause

Variation

Special Cause

Variation

Page 42: Introduction to Six Sigma

TransitionNext: Module # 4

Page 43: Introduction to Six Sigma

Introduction to

SIX SIGMAOverview: Module # 4

Data Collection & Sampling

Page 44: Introduction to Six Sigma

“Mark Twain

American Author

“Data is like garbage.”

“You’d better know what are you going to do with it before you collect it”

Page 45: Introduction to Six Sigma

Data Collection System

Obtain Data

(Collect data needed to answer

the question )

Analyze Method (Define tools

needed to graphs/analyze

the data)

Question (Determine

what questions needs to be answered)

123

Page 46: Introduction to Six Sigma

Types of Data

Data

Qualitative

AttributeMale, Female

Quantitative

Discrete1, 2, 3, 4, etc.

Continuous2.3, 4.5, 2.7,

etc.

Page 47: Introduction to Six Sigma

History of Sampling▷ US Millitary in1934 on the eve of

WWII

Page 48: Introduction to Six Sigma

Why do we need sampling?

▷Study a large population

▷Sampling is for speed

▷Sampling saves the source of data from being all consumed

▷Sampling is for economy

Page 49: Introduction to Six Sigma

TransitionNext: Module # 5

Page 50: Introduction to Six Sigma

Introduction to

SIX SIGMAOverview: Module # 5

Scoping Tools

Facilitator: Khan Mohd. IbrahimIndustrial Engineer & Six Sigma Black Belt

Page 51: Introduction to Six Sigma

What is a project’s scope?

▷ Project's scope explains the boundaries of the project

▷Scope is defined by cascading a business problem into a very concise project idea through the scoping tools

Page 52: Introduction to Six Sigma

Scoping Tools

▷ QuantitativePareto Chart

▷ QualitativeCause & Effect Diagram5 Why AnalysisAffinity Diagram

Page 53: Introduction to Six Sigma

Pareto Chart- Pareto Principle

▷ Vilfredo Pareto- an Italian civil engineer

▷ 80% of land in Italy belongs to 20% people

Page 54: Introduction to Six Sigma

Pareto ChartFr

eque

ncie

s/ C

ount

s

Perc

enta

ge

Problem Types

Cumulative Percentage line

Cut-off line

Page 55: Introduction to Six Sigma

Cause & Effect Diagram

▷Kauro Ishikawa- Kawasaki Shipyard in 1960

▷Effects are reasoned under 6Ms

▷Man, Machine, Method, Material, Measurement & Mother Nature (Environment)

Page 56: Introduction to Six Sigma

Cause & Effect DiagramEnvironment

Page 57: Introduction to Six Sigma

Cause & Effect Diagram▷Man: Anyone involved with the

process▷Methods: How the process is

performed and the specific requirements for doing it

▷Machines: Any equipment or tools required to accomplish

the job▷Materials: Raw materials used

to produce the final product

▷Measurements: Data generated from the process that are used to evaluate its quality

Page 58: Introduction to Six Sigma

5 WHY Analysis

Page 59: Introduction to Six Sigma

Affinity Diagram

▷Get ideas from cross-functional teams

Page 60: Introduction to Six Sigma

Introduction to

SIX SIGMAOverview: Module # 6

Project Definition WorkSheet

Facilitator: Khan Mohd. IbrahimIndustrial Engineer & Six Sigma Black Belt

Page 61: Introduction to Six Sigma

1. Describe the Business Problem

2. Scoping for a project opportunity

3. Define Project Matrix and Objectives

4. Quantify Financial Impact

5. Assign Team Members

6. Launch Project

Project Definition Steps

Page 62: Introduction to Six Sigma

Scoping for a project opportunity

Question Description

Output What is the Tangible output (Product or Service), related to the specific business problem

Process What Is the Process which Is delivering the product or Service

Number of Processes

How many processes are involved in delivering the Product or Service – (if there are more than two, the Problem is too broad and a scoping sessions needs to be executed in order to bring it down to ONE)

High level Macro Map

Develop a High level Macro Map illustrating the main steps of the process

Measurable Process Characteristics

Name the product or service features (or measureable process characteristics) that will help to improve the problem. If more than two features are identified, the scope of the project may be too broad.

Page 63: Introduction to Six Sigma

Question Description

Tangible OutputThe Product or Service Delivered to the Customer in terms of an Output E.g.: Output

Process High level process or departmental function E.g.: Supply Chain, Sewing, Cutting, Planning, Finance

High level Macro Map

Process Map illustrating the macro process steps of a certain process

Jargon & Terminology

Page 64: Introduction to Six Sigma

Define Project Metric & Objectives

Question Description Defect What is wrong with each feature named above (i.e., what is the

defect?) Primary Metric Name the Primary Metric(s) that measure the identified defect(s). The

Primary Metric should measure performance directly from the process. It will be the yardstick for tracking success of the project.

Consequential Metric List any Consequential Metrics measuring potential negative effects of successfully improving the Primary Metric.

Baseline Estimate the Baseline performance level for each Primary Metric.

Entitlement / Benchmark

Estimate the Entitlement and/or Benchmark for each Primary Metric.

Objective Statement Compose an Objective Statement as follows: Improve <primary metric> from <baseline level> to <target level> by <timeframe>.

Source of Data Identify which Sources of Data (reports, collection sheets, inspection points, etc) are available to measure the metrics listed.

Page 65: Introduction to Six Sigma

Question Description Defect Define what is non conformance

Primary Metric The Key Performance Indicator or the key PROJECT FOCUS which will be approached in order to solve the specific Business Problem E.g.: Efficiency, Raw Material Wastage, Manufacturing Lead Time

Consequential Metric E.g.: Primary Metric -Wastage, Consequential Metric – Shortages

Jargon & Terminology

Page 66: Introduction to Six Sigma

Quantify Financial Impact

Question Description Finance Representative

Who is the Finance Representative (provide name) assigned formally or informally to value the financial impact of this Six Sigma project?

Cost Centers List any potential Cost Centers that will likely be impacted by reducing the defect or improving the primary metric defined earlier.

Financial Metric List the Financial Metric(s) that will be used to track the improvement of the primary metric in dollars.

Original Forecast Complete the Original Forecast(s) (with 80% confidence) with the finance representative.

Page 67: Introduction to Six Sigma

Question Description

Cost Centers The Cost which is incurred in terms Prevention (Controls, Training) or Rework (Correction )

Financial Metric The Financial Impact of the Primary Metric E.g.: Improvement of 1% of Wastage = Rs. 10,000 a month

Jargon & Terminology

Page 68: Introduction to Six Sigma