ISIS, FETS and ASTeC
David FindlayHead, Accelerator DivisionISIS DepartmentRutherford Appleton Laboratory / STFC
ASTeC 10 Years On, Thursday 13 October 2011
![Page 2: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/2.jpg)
ISIS, FETS, ASTeC (IBG),RAL
Electron-proton dipole
ASTeC, DL
Dipole moment ~1 C.m
~1030 Debye unitsElectric field at 1 m: ~10 GV/m
![Page 3: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/3.jpg)
3
Overview of talk
ISISScience programmeAccelerator R&DUpgrades
Front End Test Stand
Rôle of ASTeC
![Page 4: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/4.jpg)
4
But first — protons in the UK
At AERE1/Harwell/NIRNS2/RHEL/RAL:
Harwell synchrocyclotron (1949, 165 MeV, 1 µA)
PLA (Proton Linear Accelerator, 1959–1969)50 MeV, 3-tank — originally was to be 600 MeV
Harwell ~7 MV tandem accelerator
Harwell VEC (Variable Energy Cyclotron, 1965–1980s)
Nimrod, 7 GeV proton synchrotron (1964–1978)
ISIS, 800 MeV proton synchrotron (1984– )
1 Atomic Energy Research Establishment (1946)
2 National Institute for Research in Nuclear Science (1957)
![Page 5: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/5.jpg)
Harwell tandem
![Page 6: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/6.jpg)
![Page 7: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/7.jpg)
PLA — Proton Linear Accelerator
![Page 8: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/8.jpg)
Never built
Aimed down runway
![Page 9: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/9.jpg)
PLA tank going into Building R12 at RAL
![Page 10: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/10.jpg)
PLA tank in R5.1 — as part of new injector for Nimrod
![Page 11: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/11.jpg)
Remedial work on other tanks for new injector for Nimrod
![Page 12: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/12.jpg)
PLA tank in R5.1 — as part of injector for ISIS
![Page 13: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/13.jpg)
Cockcroft at ground-breaking ceremony for Nimrod
![Page 14: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/14.jpg)
Construction of Nimrod synchrotron hall
![Page 15: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/15.jpg)
4.6 MVA alternator (+ 5100 HP motor + 24 ton flywheel) × 2
![Page 16: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/16.jpg)
First beam from Nimrod
![Page 17: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/17.jpg)
17
ISIS
World’s most productive spallation neutron source(if no longer highest beam power)
Flagship STFC facility [Sci. Tech. Facilities Council]
Driven by UK’s high-power proton accelerators
UK has largest national neutron user community of any country
Accelerator physics at ISIS necessary for continuing operations— and also for enabling entire programmes on materials R&D
Need to plan for upgrades
![Page 18: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/18.jpg)
18
ISIS
Fundamental purpose — to investigate structure and dynamics of molecular matter
Neutron sources complement light sources
Neutrons: ~0.1 eV → ~1Å
Structure Atomic motionsParacetamol
![Page 19: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/19.jpg)
Global challenges ISIS
Energy
Living with environmental change
Global threats to security
Ageing: Life-long health and wellbeing
Digital economy
Nanoscience: through engineering to application
Impact of ISIS science
![Page 20: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/20.jpg)
![Page 21: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/21.jpg)
ISIS from air
![Page 22: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/22.jpg)
22
RFQ: 665 keV H–, 4-rod, 202 MHz
Linac: 70 MeV H–, 25 mA, 202 MHz, 200 µs, 50 pps
Synchrotron: 800 MeV proton, 50 Hz5 µC each acceleration cycleDual harmonic RF system [Chris Prior]
Targets: 2 × W (Ta coated)Protons: 2 × ~100 ns pulses, ~300 ns apart
Moderators: TS-1: 2 × H2O, 1 × liq. CH4, 1 × liq. H2
TS-2: 1 × liq. H2 / solid CH4, 1 × solid CH4
Instruments: TS-1: 20 TS-2: 7 (+ 4 more now funded)
~340 staff
![Page 23: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/23.jpg)
–35 kV H– ion source
![Page 24: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/24.jpg)
665 keV 4-rod 202 MHz RFQ
![Page 25: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/25.jpg)
70 MeV 202 MHz 4-tank H– linac
![Page 26: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/26.jpg)
1.3–3.1 + 2.6–6.2 MHz 70–800 MeV proton synchrotron
![Page 27: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/27.jpg)
Superperiods 9, 0 and 1 of 800 MeV synchrotron
![Page 28: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/28.jpg)
EPB1 and EPB2 to TS-1 and TS-2 above synchrotron
Protons to TS-1
Protons to TS-2
![Page 29: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/29.jpg)
ISIS TS-1 experimental hall, 20 instruments
![Page 30: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/30.jpg)
ISIS TS-2 experimental hall, 7 instruments + 4 under way
![Page 31: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/31.jpg)
TS-1 tungsten target, plates
![Page 32: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/32.jpg)
TS-2 tungsten target, solid cylinder
![Page 33: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/33.jpg)
ISIS Upgrades
4) Upgrade 3) + long pulse mode option
0) Linac and TS-1 refurbishment
1) Linac upgrade, ~0.5 MW on TS-1
2) ~3 GeV booster synchrotron: MW target
3) 800 MeV direct injection: 2–5 MW target
![Page 34: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/34.jpg)
2) ~3 GeV RCS fed by bucket-to-bucket transfer from ISIS 800 MeV synchrotron (1MW, perhaps more)
3) Charge-exchange injection from 800 MeV linac (2 – 5 MW)
1) Replace 70 MeV ISIS linac by new ~180 MeV linac (~0.5 MW)
ISIS MW Upgrade Scenarios
ASTeC staff vital to success
![Page 35: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/35.jpg)
• Based on MW ISIS upgrade with 800 MeV Linac and 3.2 GeV RCS
• Assumes a sharing of the beam
power at 3.2 GeV between the two facilities
• Both facilities can have the same ion source, RFQ, chopper, linac, H− injection, accumulation and acceleration to 3.2 GeV
• Requires additional RCS machine in order to meet the power and energy needs of the Neutrino Factory
Common proton driver for neutron source and neutrino factory
![Page 36: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/36.jpg)
NF on Harwell Oxford site
muon linac
coolingphase rotationbunching
RLA 1
muonFFAG
RLA 2
decay ring to Norsaq155 m below ground
decay ring to INO440 m below ground
• UKAEA land now not to be decommissioned until at least 2040 (unless we pay for it!)
• Extensive geological survey data available, but needs work to interpret implications for deep excavation and ground water activation
![Page 37: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/37.jpg)
37
FETS — Front End Test Stand
Actually the second front end test stand at RAL
First test stand was built to test RFQ to replace ISIS Cockcroft-Walton
![Page 38: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/38.jpg)
ISIS 665 kV Cockcroft-Walton (1984–2004)
![Page 39: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/39.jpg)
665 keV 4-rod 202 MHz RFQ
RFQ test standion source,
LEBT, RFQ, diagnostics
![Page 40: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/40.jpg)
40
Front End Test Stand (FETS)
Key technology demonstrator for next generation of high power pulsed proton accelerators
ISIS upgrades
Neutrino factories
Future spallation neutron sources
Accelerator-driven systems
Waste transmutation
...
Only dedicated high-power proton accelerator hardware R&D project in the UK
![Page 41: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/41.jpg)
41
Key components of FETS
High-intensity, high-duty factor, H– ion source(60 mA, 2 ms, 50 pps)
Magnetic low energy beam transport (LEBT)
324 MHz 4-vane RFQ
Medium energy beam transport (MEBT)
Very high speed beam chopper
Comprehensive beam diagnostics
Collaboration — ISIS, ASTeC, Imperial College, Warwick University, ESS Bilbao consortium, Royal Holloway,[Huddersfield, UCL]
![Page 42: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/42.jpg)
In R8 at RAL
![Page 43: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/43.jpg)
43
Ion source and LEBT optimisation
60 mA H– beam current demonstrated
Low measured emittance at high
current in the FETS LEBT
![Page 44: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/44.jpg)
44
RFQ design + manufacture
RFQ cold model
Weld test models under
investigation at Imperial
Integrated electromagnetic, thermal, fluid flow and mechanical design
![Page 45: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/45.jpg)
45
Beam chopper
Essential for all high-power proton accelerators with rings
FETS chopper
Two-stage for wide-band functionality
Basis for ESS design
![Page 46: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/46.jpg)
464 metres
![Page 47: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/47.jpg)
47
Helical prototype Planar prototype
Re-bunching cavities
![Page 48: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/48.jpg)
48
Beam diagnostics
Already in use
Current transformers
Faraday cup
Slit-and-cup scanners for time-resolved 2D emittance
Scintillators for beam profiles
Pepper-pot for 4D phase space
Being developed
Laser photo-detachment(“laser wire”)
![Page 49: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/49.jpg)
49
At present
Cutting metal for RFQ
Increasing laser power for laser wire
Continuing ion source development
…
In future
Commission RFQ
Demonstrate high-quality beam chopping
Spin out hands-on accelerator expertise
…
![Page 50: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/50.jpg)
50
ASTeC
Re-packaging of long-held national lab. skills— larger package than in the past
Skills NINA, SRS, Nimrod, ISIS, Diamond, ...
“ASTeC” skills enabled / continue to enableNimrod ISISESS designs (1990s, early 2000s)ISIS second harmonic RF upgradeTS-2FETS
ISIS Accel. Theory Group ASTeC Intense Beams Group (IBG) — IBG still in ISIS R2 building
![Page 51: ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October](https://reader035.vdocuments.net/reader035/viewer/2022062314/56649de65503460f94ade89e/html5/thumbnails/51.jpg)
51
ASTeC — has enabled ISIS
Happy birthday!
And many happy returns!
— is enabling FETS
— will enable ISIS upgrades