Transcript
Page 1: ISSUED FOR TENDER€¦ · a1.53 key plans - third floor and roof a1.54 key plans - roof a2.00 partial main floor plan - west a2.01 partial main floor plan - south a2.02 partial main

SS01 SITE SERVICESSS02 SITE GRADINGSS03A DETAILSSS03B DETAILSESC01 ESC PLAN - GENERAL INFORMATIONESC02 ESC PLAN - PRESENT CONDITIONSESC03 ESC PLAN - INTERMEDIATE/ FINAL CONDITIONS

S1.00 GENERAL NOTESS1.01 GENERAL NOTESS1.10 TYPICAL DETAILSS1.11 TYPICAL DETAILSS1.12 TYPICAL DETAILSS1.20 PROJECT DETAILSS1.21 PROJECT DETAILSS2.00 KEY PLAN - FOUNDATION AND MAIN FLOOR PLANS2.01 PARTIAL FOUNDATION AND MAIN FLOOR PLAN WESTS2.02 PARTIAL FOUNDATION AND MAIN FLOOR PLAN SOUTHS2.03 PARTIAL FOUNDATION AND MAIN FLOOR PLAN EASTS2.10 KEY PLAN - SECOND FLOOR FRAMING PLANS2.11 PARTIAL SECOND FLOOR FRAMING PLAN WESTS2.12 PARTIAL SECOND FLOOR FRAMING PLAN SOUTHS2.13 PARTIAL SECOND FLOOR FRAMING PLAN EASTS2.20 KEY PLAN - THIRD FLOOR AND ROOF FRAMING PLANS2.21 PARTIAL THIRD FLOOR AND ROOF FRAMING PLAN SOUTHS2.22 PARTIAL THIRD FLOOR AND ROOF FRAMING PLAN EASTS2.30 KEY PLAN - GYM ROOF FRAMING PLANS2.31 PARTIAL PLAN - GYM ROOF - WESTS2.32 PARTIAL GYM ROOF FRAMING PLAN SOUTHS2.40 PARTIAL GATHERING AREAS2.41 PARTIAL THIRD FLOOR STRUCTURAL FRAMING - RTU

MECHANICAL SCREENS2.42 PARTIAL SITE PLAN - GARBAGE ENCLOSURES3.00 SCHEDULESS4.10 FOUNDATION SECTIONS AND DETAILSS4.11 FOUNDATION SECTIONS AND DETAILSS4.12 FOUNDATION SECTIONS AND DETAILSS4.13 FOUNDATION SECTIONS AND DETAILSS4.20 SECOND FLOOR SECTIONS AND DETAILSS4.21 SECOND FLOOR SECTIONS AND DETAILSS4.22 SECOND FLOOR SECTIONS AND DETAILSS4.30 THIRD FLOOR SECTIONS AND DETAILSS4.31 THIRD FLOOR SECTIONS AND DETAILSS4.32 THIRD FLOOR SECTIONS AND DETAILSS4.40 ROOF SECTIONS AND DETAILSS4.41 ROOF SECTIONS AND DETAILSS4.42 GIRDER TRUSS ELEVATIONS5.00 BRACING ELEVATIONSS5.01 BRACING ELEVATIONSS5.02 BRACING ELEVATIONSS5.10 BUILDING ELEVATIONSS5.11 BUILDING ELEVATIONSS5.12 BUILDING ELEVATIONSS5.13 BUILDING ELEVATIONS

M0.01 MECHANICAL LEGEND AND DRAWING LISTM2.00A FOUNDATION DRAINAGE WESTM2.00B FOUNDATION DRAINAGE SOUTHM2.00C FOUNDATION DRAINAGE EASTM2.01A PLUMBING PLAN - MAIN FLOOR WESTM2.01B PLUMBING PLAN - MAIN FLOOR SOUTHM2.01C PLUMBING PLAN - MAIN FLOOR EASTM2.02 A PLUMBING PLAN - SECOND FLOOR WESTM2.02B PLUMBING PLAN - SECOND FLOOR SOUTHM2.02C PLUMBING PLAN - SECOND FLOOR EASTM3.01A HEATING PLAN - MAIN FLOOR WESTM3.01B HEATING PLAN - MAIN FLOOR SOUTHM3.01C HEATING PLAN - MAIN FLOOR EASTM3.02A HEATING PLAN - SECOND FLOOR WESTM3.02B HEATING PLAN - SECOND FLOOR SOUTHM3.02C HEATING PLAN - SECOND FLOOR EASTM4.01A HVAC PLAN - MAIN FLOOR WESTM4.01B HVAC PLAN - MAIN FLOOR SOUTHM4.01C HVAC PLAN - MAIN FLOOR EASTM4.02A HVAC PLAN - SECOND FLOOR WESTM4.02B HVAC PLAN - SECOND FLOOR SOUTHM4.02C HVAC PLAN - SECOND FLOOR EASTM4.03 MECHANICAL ROOF PLANM5.01A FIRE PROTECTION - MAIN FLOOR WESTM5.01B FIRE PROTECTION - MAIN FLOOR SOUTHM5.01C FIRE PROTECTION - MAIN FLOOR EASTM5.02A FIRE PROTECTION - SECOND FLOOR WESTM5.02B FIRE PROTECTION - SECOND FLOOR SOUTHM5.02C FIRE PROTECTION - SECOND FLOOR EASTM6.01 MECHANICAL ROOM LAYOUTM6.02 MECHANICAL ROOM SECTIONSM6.03 MECHANICAL ROOM AHU'S SECTIONSM6.04 WATER METER ROOM LAYOUT AND SECTIONM6.05 MECHANICAL SECTIONSM7.01 MECHANICAL DETAILSM7.02 MECHANICAL DETAILSM7.03 MECHANICAL DETAILSM7.04 MECHANICAL DETAILSM8.01 MECHANICAL SCHEMATICSM8.02 MECHANICAL SCHEMATICS (RESERVED)M8.03 MECHANICAL SCHEMATICSM9.01 MECHANICAL SCHEDULESM9.02 MECHANICAL SCHEDULESM9.03 MECHANICAL SCHEDULES

E0.01 SYMBOLS LEGENDE1.01 ELECTRICAL SITE PLANE1.02 SINGLE-LINE AND FIRE ALARM RISER DIAGRAMSE1.03 RISER DIAGRAME2.01A LIGHTING PLAN - LEVEL 1 - WESTE2.01B LIGHTING PLAN - LEVEL 1 - SOUTHE2.01C LIGHTING PLAN - LEVEL 1 - EASTE2.02A LIGHTING PLAN - LEVEL 2 - WESTE2.02B LIGHTING PLAN - LEVEL 2 - SOUTHE2.02C LIGHTING PLAN - LEVEL 2 - EASTE2.03 LIGHTING PLAN - LEVEL 3 - MECHANICAL ROOME3.01 ELECTRICAL PATHWAYS - LEVEL 1E3.01A POWER AND COMMUNICATIONS PLAN - LEVEL 1 - WESTE3.01B POWER AND COMMUNICATIONS PLAN - LEVEL 1 - SOUTHE3.01C POWER AND COMMUNICATIONS PLAN - LEVEL 1 - EASTE3.02 ELECTRICAL PATHWAYS - LEVEL 2E3.02A POWER AND COMMUNICATIONS PLAN - LEVEL 2 - WESTE3.02B POWER AND COMMUNICATIONS PLAN - LEVEL 2 - SOUTHE3.02C POWER AND COMMUNICATIONS PLAN - LEVEL 2 - EASTE3.03 POWER AND COMMUNICATIONS PLAN - LEVEL 3 - MECHANICAL ROOME4.01 FIRE ALARM AND SECURITY PLAN - LEVEL 1E4.02 FIRE ALARM AND SECURITY PLAN - LEVEL 2E4.03 FIRE ALARM AND SECURITY PLAN - LEVEL 3 - MECHANICAL ROOME6.01 SYSTEMS INTERCONNECTION SCHEMATICE6.02 ELECTRICAL DETAILS ANDF INTERCONNECTION DIAGRAMSE7.01 ELECTRICAL SCHEDULESE7.02 ELECTRICAL SCHEDULESE7.03 ELECTRICAL SCHEDULESE7.04 ELECTRICAL SCHEDULESE7.05 ELECTRICAL SCHEDULESE7.06 ELECTRICAL SCHEDULES

L1 LANDSCAPING PLANSL2 LANDSCAPE DETAILSL3 TREE PROTECTION PLAN

PROJECT NO.

www.hdrcei.com

140-4838 Richard Road SWCalgary, AB T3E 6L1403-727-0068

SPRINGBANK HILL SCHOOL

SITE CIVIC ADDRESS: 7652 - 26 Ave. SW, Calgary, AB

SITE LEGAL ADDRESS: LOT 1MSR, BLOCK 1, Plan 041 0137

2015-001

A8.66 INTERIOR ELEVATIONS - MS ART AND TYPICALCLASSROOM

A8.67 INTERIOR ELEVATIONS - CTF AND WOOD SHOP

A8.68 INTERIOR ELEVATIONS - FOODS AND FASHION

A8.69 INTERIOR ELEVATIONS - MS SCIENCE

A8.70 DOOR SCHEDULE

A8.71 EXTERIOR GLAZING ELEVATIONS

A8.72 EXTERIOR GLAZING ELEVATIONS

A8.73 EXTERIOR GLAZING ELEVATIONS

A8.74 INTERIOR GLAZING ELEVATIONS

ID.00 INTERIOR FINISHES LEGEND

ID.10 TYPICAL MOUNTING HEIGHTS

ID.20 PARTIAL MAIN FLOOR FINISHES PLAN - WEST

ID.21 PARTIAL MAIN FLOOR FINISHES PLAN - SOUTH

ID.22 PARTIAL MAIN FLOOR FINISHES PLAN - EAST

ID.23 PARTIAL SECOND FLOOR FINISHES PLAN - WEST

ID.24 PARTIAL SECOND FLOOR FINISHES PLAN - SOUTH

ID.25 PARTIAL SECOND FLOOR FINISHES PLAN - EAST

ID.26 FLOOR FINISH AND FITMENT PLANS - LARGEGYMNASIUM

ID.27 FLOOR FINISH AND FITMENT PLANS - SMALLGYMNASIUM

ID.30 EQUIPMENT LIST

ID.31 PARTIAL MAIN FLOOR EQUIPMENT AND FINISHESPLAN - WEST

ID.32 PARTIAL MAIN FLOOR EQUIPMENT AND FINISHESPLAN - SOUTH

ID.33 PARTIAL MAIN FLOOR EQUIPMENT AND FINISHESPLAN - EAST

ID.34 PARTIAL SECOND FLOOR EQUIPMENT ANDFINISHES PLAN - WEST

ID.35 PARTIAL SECOND FLOOR EQUIPMENT FINISHESPLAN - SOUTH

ID.36 PARTIAL SECOND FLOOR EQUIPMENT ANDFINISHES PLAN - EAST

ID.40 MILLWORK PLANS AND ELEVATIONS

ID.41 MILLWORK PLANS AND ELEVATIONS

ID.42 MILLWORK PLANS AND ELEVATIONS

ID.43 MILLWORK PLANS AND ELEVATIONS

ID.44 MILLWORK PLANS AND ELEVATIONS

ID.45 MILLWORK DETAILS

ID.46 MILLWORK DETAILS

ID.47 INTERIOR FLOOR AND CEILING DETAILS

ID.48 INTERIOR WALL DETAILS

ID.49 DETAIL FEATURE ITEMS

ID.50 ELEVATOR FINISHES

ID.51 INTERIOR ELEVATIONS - WALL GRAPHICLOCATIONS

A5.50 WALL SECTIONS

A5.51 WALL SECTIONS

A5.52 WALL SECTIONS

A5.53 WALL SECTIONS

A5.54 WALL SECTIONS

A5.55 WALL SECTIONS

A5.56 WALL SECTIONS

A5.57 WALL SECTIONS

A5.58 WALL SECTIONS

A5.59 WALL SECTIONS

A5.60 WALL SECTIONS

A6.01 TYPICAL WINDOW DETAILS (KAWNEER 1600SERIES)

A6.02 TYPICAL WINDOW DETAILS (KAWNEER 1600SERIES)

A6.03 TYPICAL THERMALLY BROKEN DOOR DETAILS

A6.04 TYPICAL METAL TRIM PROFILES

A6.05 TYPICAL SECTION DETAILS

A6.06 SECTION DETAILS

A6.07 SECTION DETAILS

A6.08 SECTION DETAILS

A6.09 SECTION DETAILS

A6.10 SECTION DETAILS

A6.50 PLAN DETAILS

A6.51 PLAN DETAILS

A7.00 STAIR # 1 & 2 PLANS AND SECTIONS

A7.01 STAIR # 3 & 4 AND ELEVATOR PLANS, ELEVATIONSAND DETAILS

A7.02 GATHERING STAIR PLANS AND ELEVATIONS

A7.03 TYPICAL STAIR DETAILS

A7.50 WASHROOM PLANS AND ELEVATIONS

A7.51 WASHROOM PLANS AND ELEVATIONS

A7.52 WASHROOM PLANS AND ELEVATIONS

A8.64a INTERIOR ELEVATIONS - GYMNASIUMS

A8.64b INTERIOR ELEVATIONS - GYMNASIUMS

A8.64c INTERIOR ELEVATIONS - GYMNASIUM

A8.65 INTERIOR ELEVATIONS

A8.65a INTERIOR ELEVATIONS - MUSIC ROOM

A8.65b INTERIOR ELEVATIONS - OFFICES

A8.65c INTERIOR ELEVATIONS - LEARNING COMMONS

A8.65d INTERIOR ELEVATIONS

A0.01 BUILDING CODE ANALYSIS, LEGENDS ANDASSEMBLY SCHEDULES

A0.02 ASSEMBLY SCHEDULES

A0.03 REQUIRED WALL STC RATINGS

A0.04 LEVEL 1 EXITING & FIRE SEPARATIONS PLAN

A0.05 LEVEL 2 EXITING & FIRE SEPARATIONS PLAN

A0.06 LEVEL 3 EXITING AND FIRE SEPARATIONS PLAN

A1.00 SURVEY PLAN

A1.01 OVERALL SITE PLAN

A1.02 ENLARGED SITE PLANS AND ELEVATIONS

A1.11 OVERALL GRIDLINES

A1.51 KEY PLANS - MAIN FLOOR

A1.52 KEY PLAN - SECOND FLOOR

A1.53 KEY PLANS - THIRD FLOOR AND ROOF

A1.54 KEY PLANS - ROOF

A2.00 PARTIAL MAIN FLOOR PLAN - WEST

A2.01 PARTIAL MAIN FLOOR PLAN - SOUTH

A2.02 PARTIAL MAIN FLOOR PLAN - EAST

A2.03 PARTIAL SECOND FLOOR PLAN - WEST

A2.04 PARTIAL SECOND FLOOR PLAN - SOUTH

A2.05 PARTIAL SECOND FLOOR PLAN - EAST

A2.06 PARTIAL THIRD FLOOR PLAN - SOUTH

A3.00 PARTIAL MAIN FLOOR REFLECTED CEILING PLAN -WEST

A3.01 PARTIAL MAIN FLOOR REFLECTED CEILING PLAN -SOUTH

A3.02 PARTIAL MAIN FLOOR REFLECTED CEILING PLAN -EAST

A3.03 PARTIAL SECOND FLOOR REFLECTED CEILINGPLAN - WEST

A3.04 PARTIAL SECOND FLOOR REFLECTED CEILINGPLAN - SOUTH

A3.05 PARTIAL SECOND FLOOR REFLECTED CEILINGPLAN - EAST

A4.00 EXTERIOR ELEVATIONS

A4.01 EXTERIOR ELEVATIONS

A5.00 BUILDING SECTIONS

A5.01 BUILDING SECTIONS

A5.02 BUILDING SECTIONS

A5.03 BUILDING SECTIONS

A5.04 BUILDING SECTIONS

A5.05 BUILDING SECTIONS

ARCHITECTURAL: STRUCTURAL: MECHANICAL: ELECTRICAL: CIVIL:

LANDSCAPE:

OWNER: STRUCTURAL CONSULTANT: MECHANICAL CONSULTANT: ELECTRICAL CONSULTANT: CIVIL CONSULTANT: LANDSCAPE CONSULTANT: BUILDING ENVELOPE CONSULTANT: LEED CONSULTANT:

WSP Canada Inc.5940 Macleod Trail SW, Suite 900Calgary, AB T2H 2G4t. (508) 390-8220f. (403) 255-7996c. (403) 589-4365

Jared Visscher, P. Eng.Rigel Pineda, C. Tech.e. [email protected]. [email protected]

Integral Group1214 9th Avenue SE, 2nd FloorCalgary, AB T2G 0T1t. (587) 353-5141

John Munroe, P. Eng.Mingwei Zhoue. [email protected]. [email protected]

Calgary Board of Education1221-8 Street SWCalgary, AB T2R 0L4t. (403) 817-6227

Robert AshleyE. [email protected]

Integral Group1214 9th Avenue SE, 2nd FloorCalgary, AB T2G 0T1t. (403) 831-7922

Barett Macleod, P. Eng.e. [email protected]

AESuite 610 - 1632 Dickson Ave.Kelowna, BC V1Y 7T2t. (250) 763-3638f. (250) 763-8880

Sean Towers, P. Eng.Travis Saltere. [email protected]. [email protected]

WSP / MMM Group48 Quarry Park Blvd. SE Suite 220Calgary, AB T2C 5P2t. (403) 269-7440f. (403) 269-7422

Ben TymchyshynTara Callaghane. [email protected]. [email protected]

WSP Canada Inc.5940 Macleod Trail SW, Suite 900Calgary, AB T2H 2G4t. (508) 390-8220f. (403) 255-7996c. (403) 470-6141

Chris Lovee. [email protected]>

WSP Canada Inc.5940 Macleod Trail SW, Suite 900Calgary, AB T2H 2G4t. (508) 390-8220f. (403) 255-7996c. (403) 608-5306

Julien Poiriere. [email protected]

COMMISSIONING AUTHORITY:

WSP Canada Inc.5940 Macleod Trail SW, Suite 900Calgary, AB T2H 2G4t. (587) 390-8209f. (403) 255-7996

Mike Edwardse. [email protected]

ISSUED FOR TENDERMAR 11, 2016

Top Related