![Page 1: Jakarta Mass Rapid Transit System Extension Project Mass Rapid Transit System Extension Project 1 We expanded the capacity of the Jakarta Mass Rapid Transit System with extension of](https://reader031.vdocuments.net/reader031/viewer/2022030618/5ae3ebff7f8b9ae74a8e6b64/html5/thumbnails/1.jpg)
Jakarta Mass Rapid Transit System Extension Project
1
We expanded the capacity of the Jakarta Mass Rapid Transit System with extension of the existing North-South Line by approximately 23 km and the construction of the new East-West Line of approximately 87 km.
![Page 2: Jakarta Mass Rapid Transit System Extension Project Mass Rapid Transit System Extension Project 1 We expanded the capacity of the Jakarta Mass Rapid Transit System with extension of](https://reader031.vdocuments.net/reader031/viewer/2022030618/5ae3ebff7f8b9ae74a8e6b64/html5/thumbnails/2.jpg)
Jakarta Mass Rapid Transit System Extension Project
Project Title Jakarta MRT system extension project
Location Jakarta, Indonesia
Client Government of Indonesia, JICA
Project Period 2009-2010
Facts 110 km of MRT line added 2