![Page 1: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/1.jpg)
Just Add Water: The Resource Issues of Water-Based CoolingChris Crosby, CEO, Compass
Datacenters
![Page 2: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/2.jpg)
2
Who We Are
• Compass Datacenters provides complete data center packages
• Built using our Truly Modular™ Architecture• Patent pending design
• Geographically independent• The building is the module
• Simplify Capacity Planning• Growth in 1.2MW Increments
• Control• Ownership or lease• Operations and security• Expansion
![Page 3: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/3.jpg)
3
Drought
• Definitions vary:• “Prolonged period of reduced precipitation severe enough to
reduce soil moisture, water, and snow levels below the minimum necessary for sustaining plant, animal, and economic systems”
• Codified example (Washington State):• “Water supply for area is below 75% of normal”
![Page 4: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/4.jpg)
4
A Precious Resource
• 2012 Drought• 61% of 48 contiguous states
• Abnormally dry or drought conditions
![Page 5: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/5.jpg)
5
The Geography of Drought Risk
Generation capability lost in severe drought scenario
Source: Analysis of Drought Impacts on Electricity Production in the Western and Texas Interconnections of the United States , Argonne National Laboratory, 2011
![Page 6: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/6.jpg)
6
Anatomy of a Drought
• Washington State (2001)• Precipitation 56% to 74% of normal• Estimated $2.5-$6B in economic impact• Bonneville Power paid businesses over $400M
• To stay closed!
• Over 3,000 jobs lost• Smelting firms closed
• “The price of power was so high that Alcoa figured out it could make more money selling power than selling Aluminum”.• Dave O’Hara, Green Data Center Blog
![Page 7: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/7.jpg)
7
Why This is an Important Lesson
• 100 Year climate estimate• Drought conditions 10-15% of the time
![Page 8: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/8.jpg)
8
A Lot of Water
Average home:• Uses ~95,000 gallons
of water per year*
Average 5,000 square foot, 1MW data center**• 17 million gallons of
water annually
Average 15 MW data center**• 131 million gallons of
water annually
*National Renewable Energy Lab**James Hamilton, Amazon
![Page 9: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/9.jpg)
9
Relief from Outside
• Answers don’t always come from within• Case in point: Hedy Lamar came up with the idea for spread
spectrum communications
![Page 10: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/10.jpg)
10
A Universal Alternative
• Even Houston has over 3600 hours
![Page 11: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/11.jpg)
11
The Math
• “…Water overlooked in a zealous focus on PUE”• Dave O’Hara, Green Data Center Blog
• Do the math (Project savings over 10 years*)• Cost of adiabatic cooling capability- $500K• $10K annual operational and maintenance cost• $0.058 per kWh average utility cost• 7% discount rate over 10 years• Power draw rises 250kW, 500kW, 750kW
• 1,000kW thereafter• 10 Year PV “Savings”
• 75° Adiabatic- (415,000)• 58° Adiabatic- (421,000)
* Based on New Mexico DC
![Page 12: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/12.jpg)
12
Airside Economization
• A more flexible alternative• DX units with integrated controls
• No need for human interaction
![Page 13: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/13.jpg)
13
Summary
• Water is a precious resource• T. Boone Pickens
• The issue isn’t water efficiency• It’s availability and cost
• Drought• Unpredictable in impact• Increases likelihood of cost impact
• Water based systems a “faith-based” decision• Fresh air is a viable alternative
• Lower CapEx and OpEx• Usable in virtually any climate• Not always the best in efficiency, just the best business decision
![Page 14: Just add water: The Resource Issues of Water Based Cooling](https://reader035.vdocuments.net/reader035/viewer/2022081605/58efd7811a28abaa288b46bf/html5/thumbnails/14.jpg)
14